| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-Finance GRAM POST MAWANA KHURD MAWANA MEERUT | MEERUT | UTTAR PRADESH | 245206 | ₹1.2 Cr | L1 | Accepted-Finance DUE TO BELOW RATE |
| 2 | L2₹1.2 CrRejected-Finance | ₹1.2 Cr | L2 | Rejected-Finance DUE TO ABOVE RATE |
| 3 | L3₹1.2 CrRejected-Finance | ₹1.2 Cr | L3 | Rejected-Finance DUE TO ABOVE RATE |
Tender Value
₹1.2 Cr
EMD Value
₹6.2 L
Closing Date
15 May 2026, 5:00 pmClosed
EO NPP BIJNOR
O/O EO NPP BIJNOR
Construction of Digitel Study Center G.Floor and F.Floor at Ward no.18, Civil Line-I (Taimoorpur) in Nagar Palika Parishad Bijnor,Distt-Bijnor
2026_DOLBU_1141856_2
127/ET-NPPB/2026-27
Open Tender
Civil Works - Buildings
540 days
EO NPP BIJNOR
PLEASE PREFER TENDER DOCUMENT
2 documents required · 2 mandatory
₹2,354
Yes
EO NPP BIJNOR
₹6.2 L
1 Jun 2026
25 Apr 2026
16 May 2026
25 Apr 2026
15 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per S.I. No. 251. | 121.79 | Cum | 130.46 | ₹15,888.72 |
| 2 | Earth work in filling upto distance 5.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work | 68.01 | Cum | 1,560.9 | ₹1,06,156.81 |
| 3 | Cement concrete with 4cm gauge approved brick ballast, approved fine sand, cement in the proportion 8:4:1 including supply of all materials, labour and tools and plants etc. required for proper completion of the work. SI No. 281 | 12.37 | Cum | 5,006.82 | ₹61,934.36 |
| 4 | M-150 brick work in One part cement and Six part Fine sand in foundation and plinth including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 | 47.72 | Cum | 5,242.2 | ₹2,50,157.78 |
| 5 | M-150 brick work in One part cement and Six part Fine sand in superstructure including supply of all materials, labour & T&P required for proper completion of work as per SI.No. 303 & 310. | 156.15 | Cum | 6,868 | ₹10,72,438.2 |
| 6 | 12 mm thick plaster with cement and approved course sand in proportion 1:4 over brick work minimum thickness not to be less than 1 cm including supply of all materials labour and T&P etc. required for proper completion of the work SI.NO. 584 | 1,824.59 | Sqm | 262.65 | ₹4,79,228.56 |
| 7 | R.C.C raft foundation work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | 19.61 | Cum | 6,648.6 | ₹1,30,379.05 |
| 8 | R.C.C lighter beam having spans upto 6M work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:2:4 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | 28.74 | Cum | 6,648.6 | ₹1,91,080.76 |
| 9 | R.C.C columns work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | 11.86 | Cum | 6,648.6 | ₹78,852.4 |
| 10 | R.C.C in slab work in with cement approved coarse sand and 2Cm gauge approved stone grit in proporation of 1:1.5:3 in lintels of doors,windows and sunsheds excluding supply of reinforcement and lits bending but i/c its fixing and binding the same with 24 B.W.G.G.I Binding wire and i/c necessary centering and shuttering etc.and supply of all material, labour and T&P etc.requried for proper compaction of work.Binding wire of Supplied by the contractor free of cost. | 89.69 | Cum | 6,648.6 | ₹5,96,312.93 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.24 MB
BOQ_2132620.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid