Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹67.7 Laccepted-aoc | accepted-aoc |
Tender Value
₹67.8 L
EMD Value
₹1.6 L
Closing Date
7 Apr 2025, 9:30 pmClosed
Bruhat Bengaluru Mahanagara Palike
CHENNABASAPPA MEKALE
Estimate for the work of Maintenance of Existing bore wells Motor pump and panel boards repairs, to water supply system in Horamavu village partial, Horamavu agara partial, Geddalahalli, Kothanuru, K. Narayanapura, Nagareshwara Nagenahalli, Kyalasanahalli Surrounding Extention area in Horamavu Ward No.87
BBMP/2024-25/OW/WORK_INDENT7104
BBMP/2024-25/OW/WORK_INDENT7104
Open
Other Works
Two Tender Document System(Two Cover)
BBMP K R Puram Mahadevapura
8 documents required · 8 mandatory
Satisfactoriy completed as prime contractor at-least one such similar work of value not less than Rs. 40Lakhs (50% of estimated cost of tender)
Executed in any one year the following minimum quantities of work Labour charges for Erection of new/repaired submersible pump set 7400 Nos PVC Insulated cable 400Mtr, Cutting and threading GI Pipe400Mtr) (80% of peak rate of construction)
achieved in at least two financial years a minimum financial turnover (in all classes of Civil Engineering construction works only) of Rs. 80.0 Lakhs,
Reports on the financial standing of the tenderer, such as profit and loss statements and auditors reports for the last five years
List of Financial Resources with Certificates
Tenderer or his identified Sub Contractor should possess valid license for executing water supply engineering works and should have executed similar works totallng Rs. 40Lakhs (not less than 50% of electrical works) n any one year
GST Registration Certificate
Total value of civl engineering works executed and payments received in the last five years (year-wise)
Liquid assets and /or availability of credit facilities of no less than Rs.50Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded .The tenderer shall have minimum Two drilling rigs out of which at least one shall be owned by tenderer and other One may be on lease. In case of lease, Lease agreement to be executed on Rs. 200 stamp paper with owners of the rig for a period of two years from the date of this tender notification. Notarized copies of valid rig documents such as RC Book, Fitness certificate upto date tax paid receipt, Insurance paid receipt, and lease agreements should be uploaded. One set of GPS Equipment for each rig. The tenderer shall have one own RIG Registered with Karnataka Ground water authority. And shall have to produce FORM 7A in Original and valid.
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
₹1,700
₹1.6 L
7 Apr 2025
29 Mar 2025
9 Apr 2025
1 Apr 2025
2 Apr 2025
Estimate for the work of Maintenance of Existing bore wells Motor pump and panel boards repairs, to water supply system in Horamavu village partial, Horamavu agara partial, Geddalahalli, Kothanuru, K. Narayanapura, Nagareshwara Nagenahalli, Kyalasanahalli Surrounding Extention area in Horamavu Ward No.87
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Rewinding of submergible pumpset with copper winding wires of appropriate guage, as per specifications and / or directions of the departmental officials, including all materials, labour, equipment and...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of submergible pump sets, requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labour, equipments and tes...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Replace the components of motor parts of submergible pump sets, items requiring replacements decided by the departmental officials, with respective make of damaged ones, including all materials, labou...
Labour charges for Lifting of non functioning submersible pump set along with cable and GI pipes (Each length = 6m).12.5HP, as per instructions of engineer incharge of work.
Labour charges for Lifting of non functioning submersible pump set along with cable and GI pipes (Each length = 6m).15HP, as per instructions of engineer incharge of work.
Labour charges for Lifting of non functioning submersible pump set along with cable and GI pipes (Each length = 6m).17.50/20HP, as per instructions of engineer incharge of work.
Labour charges for Erection of new / repaired submersible pump set along with GI pipes (32mm / 50mm), cable (New submersible pump set if required will be supplied by the department free of cost and re...
Labour charges for Erection of new / repaired submersible pump set along with GI pipes (32mm / 50mm), cable (New submersible pump set if required will be supplied by the department free of cost and re...
Labour charges for Erection of new / repaired submersible pump set along with GI pipes (32mm / 50mm), cable (New submersible pump set if required will be supplied by the department free of cost and re...
Supply and delivery at site Brand new best make PVC insulated cable of Flat 3 core (sheathed) of nominal cross sectional area as per IS 694-1990 with ISI Mark and as per its latest amendments. 1x3x4 S...
Providing, Supplying and fixing suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc. with necessary materi...
Lifting of struck up submersible pump set. Upto 300 ft, as per instructions of engineer incharge of work.
Lifting of struck up submersible pump set. Above 300 ft, as per instructions of engineer incharge of work.
Positioning of the rig for retrival of failed borewells, raising mast and aligning the hammer and drill rods moounded on the rotary head of the rig concentric with borewell of 140-149 mm dia. to retri...
Cleaning of borewells including yield testing of borewell either using slow or fast rigs for not more than 2 hours at the final depth with a minimum working of 2 hours continuously with air compressor...
Cutting and threading G.I pipes for pump fitting public fountains with appurenances, where the length of pipe laid is less than 6 metres, as per instructions of engineer incharge of work.
Supply, installing,testing and commissioning COMMON control panel consisting of the following INCOMING:1 No set of Phase indicating lamps with SFU of suitable rating 1 No, Analog Ammeter, 1 No Analog ...
Labour charges for erection of outdoor type panel board and meter board units with all necessary materials and labour, tools and equipments including providing cement concrete foundation bed etc., com...
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW3 - 1.doc
Tender Document • 0.26 MB
Tnd Notification 14.doc
Instructions to Tenderers • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .