Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.0 LAdmitted-Finance | -48.01% | ₹32.0 L | L1 | Admitted-Finance |
| 2 | L2₹33.3 L+₹1.3 L (4.15%)Admitted-Finance | -45.85% | ₹33.3 L+₹1.3 L (4.15%) | L2 | Admitted-Finance |
| 3 | L3₹33.5 L+₹1.5 L (4.83%)Admitted-Finance | -45.50% | ₹33.5 L+₹1.5 L (4.83%) | L3 | Admitted-Finance |
| 4 | L4₹37.9 L+₹5.9 L (18.3%)Admitted-Finance | -38.50% | ₹37.9 L+₹5.9 L (18.3%) | L4 | Admitted-Finance |
Tender Value
₹61.5 L
EMD Value
₹1.2 L
Closing Date
20 May 2026, 3:00 pmClosed
Project Officer CAD Samba, H.Q. Jammu
Project Officer CAD Samba, H.Q. Jammu
Remodeling Reconstruction of Plum Concrete Field Channels on DOLS of MRC at Chack Ludan Kharote
2026_APD_308741_2
eNIT 02 of 2026-27, dated 26.04.2026
Open Tender
Civil Works - Others
Percentage
Chak Ludan and Kharote
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,500
Project Officer CAD Samba, H.Q. Jammu
₹1.2 L
30 May 2026
12 May 2026
21 May 2026
12 May 2026
20 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth 1 mtr from cutting edge. | 954.35 | m3 | 256.85 | ₹2,45,124.8 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 210.45 | m3 | 4,826.5 | ₹10,15,736.92 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30 % 225 mm boulders | 375.76 | m3 | 5,733.6 | ₹21,54,457.54 |
| 4 | Dumping/ Hand Packing of stones (30%) in plum including the cost of Stone boulder (nallah) nominal size 225 mm in Horizontal on level | 161.04 | m3 | 937.9 | ₹1,51,039.42 |
| 5 | Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete.( 40mm thick with 20 mm nominal size stone aggregate.) | 1,159 | m2 | 510.25 | ₹5,91,379.75 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns. | 4,880 | m2 | 286.35 | ₹13,97,388 |
| 7 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 170.8 | m3 | 218.4 | ₹37,302.72 |
| 8 | Carriage of cement, sand, bajri,and stone inncluding mechnical and head load | 1 | m3 | 5,62,570.84 | ₹5,62,570.84 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_1002706.xls
BOQ • 0.28 MB
retendernit2.pdf
Other Document • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .