| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.9 LAdmitted-Finance | ₹30.9 L | L1 | Admitted-Finance |
| 2 | L2₹35.3 L+₹4.4 L (14.3%)Admitted-Finance | ₹35.3 L+₹4.4 L (14.3%) | L2 | Admitted-Finance |
| 3 | L3₹47.0 L+₹16.1 L (52.3%)Admitted-Finance | ₹47.0 L+₹16.1 L (52.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P NAIDU L2 | M/S P.VIJAY KUMAR L3 | KBR CONSTRUCTIONS L1 |
|---|---|---|---|---|---|---|
| .10NOTE: 1. The bidders/ contractors are advised to read tender documentts and all corrigendum/ amendments and General conditions of contracts before entry/ quoting the rates. | ||||||
| 1.00 | Taking out carefully precast RCC slabs of septic tanks, completely by emptying the liquid, semi solid and solid content including cleaning the inlet, outlet and getting out by using suction pump and filling the foul material in to the covered tanks attached to suction pump and removing, transporting and disposal of the same at a place earmarked for disposal of the foul material by Panchayat authorities to outside the ICGS Area and applying one coat of linseed oil complete for septic tank capacity 10 users to 100 users each, all as specified including cleaning the septic tanks with fresh water and bleaching powder and refixing the removed cover slab incl necessary cambering to edges as required in CM (1:4) and necessary touch-up with cement base paint all as directed by Engr-in-Charge. NOTE: Cubic content of filled up portion of septic tank shall be measured for payment purpose. | 20 | Cum | 4,000 ₹80,000 Lowest | 4,500 ₹90,000 | 4,000 ₹80,000 Lowest |
| 2.00 | Taking out carefully the cover slabs of manholes of any size, depth and removing the sludge to a distance exc 250 m and n. exc 500 m and dumping eco friendly manner and cleaning the inside with fresh water and bleaching powder and placing the cover slabs back incl necessary cambering to edges as required in CM (1:4) and necessary touch -up with cement base paint all as directed by Engr-In-charge. | 40 | Each | 250 ₹10,000 | 500 ₹20,000 | 240 ₹9,600 Lowest |
| 3.00 | Cleaning with fresh water and bleaching powder, the blockages in sewer line of 100 to 150 mm dia pipes, in between manholes and passing rubber ball / sponge ball / similar means through the line to ensure cleaning of all blockage complete all as specified. | 150 | Rm | 40 ₹6,000 | 250 ₹37,500 | 30 ₹4,500 Lowest |
| 4.00 | Excavation in trenches n. exe 1.5m wide & n. exe 1.5m depth for foundation etc and n.exe 10sqm on plan and getting out in Soft/Loose soil. | 8 | Cum | 500 ₹4,000 | 350 ₹2,800 Lowest | 450 ₹3,600 |
| 5.00 | Returning filling in soil including spreading, levelling, watering & well ramming in layers n. exe 25 cm. | 6.4 | Cum | 350 ₹2,240 | 150 ₹960 Lowest | 300 ₹1,920 |
| 6.00 | Removing excavated material n. exe 50m and depositing where directed at a level n. exe 1.50m above the starting point in Soil. | 1.6 | Cum | 350 ₹560 | 100 ₹160 Lowest | 300 ₹480 |
| 7.00 | Demolition of concrete in ground floors (un reinforced) and paving n.exc. 15 cm thickness (below or above ground level) and including removal of rubbish/ demolished materials out of MD land complete all as specified and directed. | 18.75 | Cum | 850 ₹15,937.5 Lowest | 950 ₹17,812.5 | 850 ₹15,937.5 Lowest |
| 8.00 | Demolition of PCC of any description and in any position not otherwise specifically provided for(un-reinforcement ) and removal of rubbish/ demolished materials out of MD land ,etc complete all as specified and directed. | 3 | Cum | 850 ₹2,550 | 500 ₹1,500 Lowest | 850 ₹2,550 |
| 9.00 | Demolition of RCC of any description and in any position not otherwise specifically provided reinforced (reinforcement of cut as required to facilitate demolition etc) and removal of rubbish/ demolished materials out of MD land complete all as specified and directed. | 1 | Cum | 1,600 ₹1,600 | 950 ₹950 Lowest | 1,800 ₹1,800 |
Tender Value
₹32 L
EMD Value
₹64,000
Closing Date
22 Aug 2026, 6:00 pmClosed
Saurabh Singh
GE P North Sri Vijaya Puram Port Blair Andaman and Nicobar
REPAIR / REPLACEMENT OF SEWAGE LINE
2026_MES_780496_1
GEPNSVP8201
Open Tender
Civil Works
Item Rate
Hutbay
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
GE P North
₹64,000
8 Sept 2026
25 Jul 2026
27 Aug 2026
25 Jul 2026
22 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out carefully precast RCC slabs of septic tanks, completely by emptying the liquid, semi solid and solid content including cleaning the inlet, outlet and getting out by using suction pump and filling the foul material in to the covered tanks attached to suction pump and removing, transporting and disposal of the same at a place earmarked for disposal of the foul material by Panchayat authorities to outside the ICGS Area and applying one coat of linseed oil complete for septic tank capacity 10 users to 100 users each, all as specified including cleaning the septic tanks with fresh water and bleaching powder and refixing the removed cover slab incl necessary cambering to edges as required in CM (1:4) and necessary touch-up with cement base paint all as directed by Engr-in-Charge. NOTE: Cubic content of filled up portion of septic tank shall be measured for payment purpose. | 20 | Cum | - | - |
| 2 | Taking out carefully the cover slabs of manholes of any size, depth and removing the sludge to a distance exc 250 m and n. exc 500 m and dumping eco friendly manner and cleaning the inside with fresh water and bleaching powder and placing the cover slabs back incl necessary cambering to edges as required in CM (1:4) and necessary touch -up with cement base paint all as directed by Engr-In-charge. | 40 | Each | - | - |
| 3 | Cleaning with fresh water and bleaching powder, the blockages in sewer line of 100 to 150 mm dia pipes, in between manholes and passing rubber ball / sponge ball / similar means through the line to ensure cleaning of all blockage complete all as specified. | 150 | Rm | - | - |
| 4 | Excavation in trenches n. exe 1.5m wide & n. exe 1.5m depth for foundation etc and n.exe 10sqm on plan and getting out in Soft/Loose soil. | 8 | Cum | - | - |
| 5 | Returning filling in soil including spreading, levelling, watering & well ramming in layers n. exe 25 cm. | 6.4 | Cum | - | - |
| 6 | Removing excavated material n. exe 50m and depositing where directed at a level n. exe 1.50m above the starting point in Soil. | 1.6 | Cum | - | - |
| 7 | Demolition of concrete in ground floors (un reinforced) and paving n.exc. 15 cm thickness (below or above ground level) and including removal of rubbish/ demolished materials out of MD land complete all as specified and directed. | 18.75 | Cum | - | - |
| 8 | Demolition of PCC of any description and in any position not otherwise specifically provided for(un-reinforcement ) and removal of rubbish/ demolished materials out of MD land ,etc complete all as specified and directed. | 3 | Cum | - | - |
| 9 | Demolition of RCC of any description and in any position not otherwise specifically provided reinforced (reinforcement of cut as required to facilitate demolition etc) and removal of rubbish/ demolished materials out of MD land complete all as specified and directed. | 1 | Cum | - | - |
| 10 | Dismantling of cast iron/PVC pipes jointed in cement mortar and taking out of trenches, 150 mm nominal bore of pipe ,etc complete all as specified and directed. | 10 | RM | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_874291.xls
BOQ • 1.38 MB
Tender.pdf
Tender Documents • 1.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .