| 1 | L1₹31.1 LAccepted-AOC | L1 | Accepted-AOC Being Lowest | |
| 2 | L2₹34.1 L+₹2.7 L (8.70%)Rejected-Finance ROOM NO 997 GALI NO 3 PART NO 3 GANESH MURTHY NAGAR CUFFE PARADE COLABA MUMBAI 400 005 | MUMBAI | MAHARASHTRA | 400005 | L2 | Rejected-Finance Other than being lowest | |
| 3 | L3₹34.9 L+₹3.5 L (11.1%)Rejected-Finance | L3 | Rejected-Finance Other than being lowest | |
| 4 | L4₹34.9 L+₹3.5 L (11.3%)Rejected-Finance NOT AVAILABLE | FARIDABAD | HARYANA | 121004 | L4 | Rejected-Finance Other than being lowest | |
| 5 | L5₹37.0 L+₹5.6 L (17.9%)Rejected-Finance | L5 | Rejected-Finance Other than being lowest |
Tender Value
Refer Docs
EMD Value
₹94,000
Closing Date
30 Mar 2023, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (NW) Mumbai
Commander Works Engineer NW DrHomi Bhabha Road Navy Nagar ColabaMumbai 05
PERIODICAL SERVICES TO INTERNAL AND EXTERNAL SURFACES OF CERTAIN BUILDINGS AND CERTAIN MISC B/R REPAIRS AT RASHI COMPLEX COLABA UNDER AGE BR II UNDER GE NW NAVY NAGAR COLABA MUMBAI
2023_MES_584426_1
8138/ CWE (NW) Mumbai/E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class D
7 documents required · 7 mandatory
₹500
Yes
GE (NW) Navy Nagar
₹94,000
Yes
17 May 2023
4 Mar 2023
1 Apr 2023
4 Mar 2023
30 Mar 2023
23 Mar 2023
4 Mar 2023 - 17 Mar 2023
Amount
Taking down cement plaster of any description in any position including racking out joints making key scrubbing down with water etc incl removing of the demolished materials to outside MoD land complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for 20 mm thick plastering in two coats 15 mm thick backing coat in CM 1:6 and 5 mm thick setting coat in CM 1:4 mixed with water proofing compound @ 2% by weight of cement on fair faces of brick work or concrete wall surfaces finished even and smooth without using extra cement including scaffolding, Safety net etc all complete all as specified and directed by Engr-in-Charge. (Note :- work to be carried out upto G+14th floor & WPC shall be measured and paid separately)
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply only integral water proofing compound of approved make as per ISI complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour plastering 15mm thick in CM 1:6 finished even and smooth without using extra cement complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour plastering 5mm thick in CM 1:3 finished even and smooth for ceiling complete complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Prepration of new plastered surfaces of walls, pillars, cornices and applying two coat oil bound distemper over a coat of primer including prepration of surface complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for preparing newly plastered or unplastered surfaces and applying two coats of acrylic based exterior paint over a coat of primer & bio wash on walls incl necessary scaffolding complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for preparation of new plastered surface of ceiling and applying two coats of white wash complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Prepration of old decorated plastered surfaces of walls, pillars, cornices by brooming down or steel brushing scraping down smoke roots, molds, moss and efforescence salts, trading oil greasy spots etc and applying one coat oil bound distemper on walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Prepration of old decorated plastered surfaces of walls, pillars, cornices by brooming down or steel brushing scraping down smoke roots, molds, moss and efforescence salts, trading oil greasy spots etc and applying two coat oil bound distemper on walls complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Prepration of old decorated plastered surfaces of walls, pillars, cornices by brooming down or steel brushing scraping down smoke roots, molds, moss and efforescence salts, trading oil greasy spots etc and applying one coat of white wash on ceiling complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour preparation of old decorated surfaces of wall including washing and applying two coat of Acrylic emulsion paint exterior grade (100% Acrylic) over a coat of primer including necessary scaffolding, Safety net etc complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for Preparation of old painted surfaces of wood or wood based materials of any description not other wise described, over 10cm width or girth and applying one coat of synthetic enamel paint, complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Preparation of old previously treated steel or steel based surfaces of any description not otherwise described, over 10cm width or girth and applying two coat of synthetic enamel paint (of approved shade) complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for writing letter or figures size as per existing numbering of the building (Block, Roman, Italic or Indian) complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply and fixing in repairs Aluminium wire cloth, 0.45mm nominal dia of wire and average width of aperture 1.40mm, cut to required size and fixed to doors,windows shutter (wooden/aluminium), with wooden beading (any size)or aluminium wire staples and removing old beading, complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Supply & Fixing as in repairs aluminium serrated finish 20mm dia curtain rod of approved pattern and shade with all fittings as per site requirement such as , CP screws, rovel plug, etc. complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material & Labour for decorated powder coated aluminium end block, rounded block & brackets fixed in repairs for curtain rod complete all as specifed and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour non-skid coloured Ceramic tiles 6 to 7mm thick (square/rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in epoxy mortar and pointed in white of coloured cement to match including 15 mm thick screed bed in CM 1:6 complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour Coloured glazed ceramic tiles 300 x 200 x 7mm on vertical surfaces set & jointed in neat cement slurry and pointed in white cement mixed with pigment over 12mm thick rendering as in backing coat in CM 1:4 complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Demoliton of cement concrete in ground floors and pavings n exc 15 cm thickness (below or above ground level) complete all as specified and directed by Engr-in-Charge.
Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc.laid bedded and pointed in any mortar complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour 75 mm thick PCC 1:4:8 type D2 using 40mm graded stone aggregate as in sub base complete all as specified and directed by Engr-in-Charge.
Material and labour Factory Made machine pressed precast concrete interlocking paver block with grey cement and pigment any shape and size confirming to IS 15658-2006 of 60 mm thickness M-35 grade complete all as specified and directed by Engr-in-Charge.
Material and labour for 25 mm thick Sand filling under floors or in foundations including watering and consolidation complete all as specified and directed by Engr-in-Charge.
Material and labour for plain cement concrete 1:2:4 type B-1 (using 20 mm graded aggregate) as coping,road side interlocking ,stops including necessary formwork complete all as specified and directed by Engr-in-Charge.
Material and labour Granite (of any type) tiles 20mm thick machine cut, bedded and jointed with grey cement slurry and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding and polishing complete over 20mm thick screed bed or bedding in cement mortar 1:4 etc complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour 18 to 20mm thick Granite (of any type) tiles machine cut, in skirting/ dado laid over 12mm thick rendering as in backing coat in CM 1:4 and jointed with grey cement slurry, and pointed with white cement with admixture of pigment to match the shade of granite stone including grinding and polishing complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Chipping, removing carefully concrete work by low impact hammer, breakar without damaging the structure & cleaning of roof slabs, chajjas, etc. and disposal of debries out side the MoD Land etc. complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for clean existing reinforcement with wire/rotary wire brush, making the surfaces free from loose material, dirt etc. Complete and applying two coats of alkaline rust converting primer FEOVERTASTM-B-117, on the rebars, including cleaning the reinforcement, wire brushing to remove loose rust spalls, with time interval of 6 hours between the coats and applying protective coating IPNET-RB complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for applying two coats of anticorrosive Treatment to Reinforcement by application of two coats of anti-rust protective coating in the form of Acrylic Polymer with a minium splid content to 40% solid mixed with cement in 1:1.5 proportion ( 1 part polymer and 1.5 part cement) on rebars after cleaning of rust scales with time interval of minimum 4 hours between each coat by brush as per manufacturers instruction.Anti-rust protective shall be procured from one of manufacturer given below complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Replacement of steel reinforcement with TMT bars of appropriate size where 20% of cross section is reduced including dismantling of rusted steel including application of rust converter FEOVERT and applying protective coating IPNET-RB as per manufacturer instructions complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for carry out application of ‘Bi-polar migratory corrosion inhibitor' EPCO-KP-100/protectsil CIT/ferogard 903 on concrete surface .(This inhibitor shall have migratory kind of property which permits the material to migrate to a virtual extent of 100 mm, through pores of concrete, inhibiting the corrosion and de-passivating the Electro-chemical reaction. It should have property to attack anode as well as cathode, which is purely alkaline in nature (pH-9.5), so it has no carcinogen activity with concrete complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for providing and applying structural grade EPIBOND-21-LP prior to application of any type of mortar plaster conforming to ASTM-C-882-91 (Arizona Slant Shear Test) to ensure bond between old concrete and new concrete complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for building up the profile of structrual members by using latex B2 modified air cured mortar system (polymer modified mortar) (1:5:15=1 monobond-5 Cement-15 Sand) -in damaged areas in 30mm thickness including leveling profiling etc complete all as specified and directed by Engr-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for applying two coats of water proofing coating system by applying shalicry - 215 of STP ltd/Rain coat 601 of Dr Fixit/Barrier coat of Araldite Ltd. over a coat of respective primer including prepariation of plaster surfaces or complete removal of existing treatment filling up of all cracks with approved crack fillers complete all as specified and directed by Engineer-in-Charge. (Note : for item No 36 work to be carried out upto and inculding G+14th floor).
Dismantling of MS grill/grating of any description and position etc complete all as specified and directed by Engineer-in-Charge.
Supply and fixing including fabrication framed work in MS iron such as grills, gratings gate fencing , etc with end of bars shouldered and/ or riveted or bolted with nuts and bolts framework conforming to Fe.290. Gde-E-165 complete all as specified and directed by Engineer-in-Charge.
Material and labour two coat synthetic enamel paint over a coat of red oxide primer on new steel surfaces including prepration of surface of any description over 10 cm width or girth not otherwise complete all as specified and directed by Engineer-in-Charge.
Hacking out old broken glass (any thickness, size, quality or description) from wooden frames exc 1.5 sqm, glazed with putty or fixed with beads complete all as specified and directed by Engineer-in-Charge. Note: Glass will be measured and paid for separately.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour 3mm thick sheet glass, ordinary quality and glazing with wooden beading not exc 0.5 Sqm in each pane complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour 4mm thick figured glass, pin head type and glazing not exc 0.5 Sqm in each pane with and including wooden beading complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour 4.8 mm thick sheet glass, ordinary quality fixed to aluminum frame work and glazing with suitable size aluminum anodised beading exc 0.5 Sqm in each pane including hacking out old broken glass complete all as specified and directed by Engineer-in-Charge.
Height upto and including 4th floor.
5th floor to upto and including 8th floor.
9th floor to upto and including 12th floor.
13th floor to up to and including 14th floor.
Material and labour for providing and applying jacketing around columns, beams, slabs, chajjas etc with Micro concrete (Molith-MC) M40 including all lifts, shuttering, drilling holes and fixing shear anchor as directed and specified complete. Note : Reinforcement shall be measured and paid separately (Rates including jacketing, formwork and micro concrete.) (Note : Work shall be carried out upto G+14 Storey bldg. Incl scaffolding and safety Net Cloth at place.
satguruenterprises
Angrahit Services Trading Co
ASHOK CONSTRUCTION
SRI RAM CONSTRUCTION
Shetty Construction Co
Unitech Enterprises
P LAXMI AND CO.
SAHU AND SAHU CO.
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .