| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹13.6 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹13.8 L+₹23,232.36 (1.71%)Accepted-AOC UTTAR PRADESH UP | L-2 | Accepted-AOC L-2 |
Tender Value
₹18.8 L
EMD Value
₹37,640
Closing Date
1 Mar 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE MGCCD10 BSR
EE MGCCD10 BSR
Construction of V.R.B. at Km 5.900 of Shakarpur Dy. For MGC-Stage IInd. Lot-3
2025_UPIDC_1001758_2
04/EE/2024-25
Open Tender
Civil Works - Bridges
Item Rate
90 days
Bulandshahr
Please refer Tender documents.
3 documents required · 3 mandatory
₹766
₹37,640
2 May 2025
24 Feb 2025
1 Mar 2025
24 Feb 2025
1 Mar 2025
24 Feb 2025
Amount
Construction of V.R.B.
Earth work in foundation in soil (Loam,clay or sand ) i/c lift upto 1.50 M.and lead 30 M. including back filling watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by Engineer-in-charge up to 30 M. from the foundation trenches.
Laying CC 1:3:6 in Foundation using Stone ballast including cost of all materials, labour, T&p, etc. required for proper completion of work.
Brick work with M-100 Bricks in 1:4 CM mortar including cost of all materials, labour, T&p, etc. required for proper completion of work.
Ordinary centering and suttering for R.C.C. work .
Laying RCC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
Laying CC 1:1.5:3 using Stone grit including cost of all materials, labour, T&p, etc. required for proper completion of work.
Steel Reinforcement for RCC work i/c cost of steel, bending,binding,cutting and placing in proper position etc. required for proper completion of work.
P/F 100 mm dia P.V.C.pipe in proper position for drainage spout i/c all material labour T&p etc. required for proper completion of work.
Struck deep cement pointing in 1:2 CM on surface including cost of all materials, labour, T&p, etc. required for proper completion of work.
Supply and Laying of Tarfelt including cost of all materials, labour, T&p, etc. required for proper completion of work.
Supply and Laying of Supply and Laying 12mm thick Premoulded joint filler board including cost of all materials, labour, T&p, etc. required for proper completion of work.
J M D CONSTRUCTION AMD SUPPLIAR (BID ID -5008711)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .