| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.9 LQualified | L1 | Qualified MII | |
| 2 | L2₹84.6 L+₹4.7 L (5.94%)Qualified HANUMAN NAGAR NEAR KALEWADI PHATA THERGAON PUNE MAHARASHTRA 411033 | PUNE | MAHARASHTRA | 411033 | L2 | Qualified MII | |
| 3 | L3₹91.0 L+₹11.2 L (14.0%)Qualified | L3 | Qualified MII | |
| 4 | L4₹1.1 Cr+₹34.0 L (42.5%)Qualified SHOP NO 131 1 GURUKUL GRUHRACHNA SANTHA IN FRONT OF SAHYOG SOCIETY BHIGWAN ROAD BARAMATI PUNE MAHARASHTRA 413102 | PUNE | MAHARASHTRA | 413102 | L4 | Qualified MII | |
| 5 | Disqualified | - | Disqualified MII |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
2 Mar 2022, 6:00 pmClosed
Dismantling of pole
Erection
Cement concrete
Excavation soft
Excavation hard
Excavation hard rock
Earthing
10x4 cable
35x3.5 cable
pipe
60 watt
90 watt
120 watt
flood light
service wire
7 mtr pole
8 mtr pole
bracket
pole earthing
Soft soil cable
50x3.5 cable BOQ Title BOQBID1
3145887
GEM/2022/B/1946872
Dismantling of pole,Erection,Cement concrete,Excavation soft,Excavation hard,Excavation hard rock,E
365 days
Maharashtra; Pune
Total value wise evaluation
BOQ
10 documents required · 10 mandatory
3 yrs
₹40 L
₹1 Cr
10%
₹80,000
2 Mar 2022
11 Feb 2022
2 Mar 2022
| Item No | Item Title | Description | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|---|
| 1 | Dismantling of pole | Pole Dismantling | 50 | pieces | PUNE CITY | 365 |
| 2 | Erection | Pole erection | 25 | pieces | PUNE CITY | 365 |
| 3 | Cement concrete | Cement concrete in foundations, filling and mass concrete Type C2 1:3:6 (40 mm graded aggregate) | 60 | cum | PUNE CITY | 365 |
| 4 | Excavation soft | Excavating in trenches , not exceeding 1.5 m wide not exceeding 1.5 m in depth for foundation etc for erection of street light pole carried out in soft loose soil | 25 | cum | PUNE CITY | 365 |
| 5 | Excavation hard | Excavating in trenches , not exceeding 1.5 m wide not exceeding 1.5 m in depth for foundation etc. for erection of street light pole carried out in Hard dense soil | 25 | cum | PUNE CITY | 365 |
| 6 | Excavation hard rock | Excavating in trenches , not exceeding 1.5 m wide not exceeding 1.5 m in depth for foundation etc for erection of street light pole carried out in Hard rock | 10 | cum | PUNE CITY | 365 |
| 7 | Earthing | Earthing complete with GI earth plate | 10 | pieces | PUNE CITY | 365 |
| 8 | 10x4 cable | cable 10 sqmm | 4,300 | mtrs | PUNE CITY | 365 |
| 9 | 35x3.5 cable | cable 35 sqmm | 300 | mtrs | PUNE CITY | 365 |
| 10 | pipe | dwc HDPE pipe | 3,000 | mtrs | PUNE CITY | 365 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_3145887.pdf
GEM_BID
bid-document_2022-02-11-16-55-01_12e4f2654742dbad81595529a8378398.pdf
BOQ
boq_item_sample_file_2022-02-11-16-55-01_2c8bf0e2f4878a506b50d09207dc9a51.csv
BOQ
termsCondition.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .