Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.2 L+₹7,590.85 (6.57%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.5 L+₹34,547.10 (29.9%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹3,740
Closing Date
24 Jul 2026, 4:00 pmClosed
Er. Mohammad Waseem
Office of the Executive Engineer RnB Ang
Construction of Lane and Drain from Rafiq Ahmad Dar to Nisar Ahmad Dar at Old Eidgah Anantnag.
2026_PWDJK_316707_3
NIT 49 of RnB/Ang/2026-27/4184-93 Dt 18/07/26
Open Tender
Civil Works
Percentage
20 days
Anantnag
Please refer Tender documents.
4 documents required · 4 mandatory
₹200
Executiver Engineer rnB Division Anantnag
₹3,740
30 Jul 2026
18 Jul 2026
25 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engaging labours for removing of unhygenic materials and debris disposal of the same outside muncipal limits. | 2 | no | - | - |
| 2 | Earth work in excavation by manual means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : | 15.91 | Cum | - | - |
| 3 | P/l dry stone soling duly hand packed & consolidated with hand rammers inc. all carriage complete job. | 0.67 | Cum | - | - |
| 4 | Providing and laying in position cement concrete of (1:4:8) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 40mm nominial size aggregate include carraige of materials and head load of 50m complete job. | 0.79 | Cum | - | - |
| 5 | Providing and laying in position cement concrete of (1:2:4) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials and head load of 50m complete job. | 6.37 | Cum | - | - |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for: foundation footings, bases of columns etc complete | 41.81 | sqm | - | - |
| 7 | Providing and laying in position reinforced cement concrete of (1:1.5:3) ratio excluding the cost of centring, shuttering and carraige of all work in foundation using coarse sand and 20mm nominial size aggregate include carraige of materials and head load of 50m complete job. | 4.41 | Cum | - | - |
| 8 | Reinforcement for RCC Work incl cutting bending fixing complete job (Tmt bars FE 500 D or more) | 441.48 | kg | - | - |
| 9 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 140 | kg | - | - |
| 10 | PROVISION FOR GEO TAGGED PHOTOGRAPHS SIGN BOARD | 1 | no | - | - |
stage.html
html • 0.02 MB
finance_1034543.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_1034543.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .