Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹9.6 L+₹1.9 L (24.6%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹9.9 L+₹2.2 L (28.4%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹10.0 L+₹2.3 L (29.7%)Admitted-Fee/PreQual/Technical/Finance S A | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹10.1 L+₹2.4 L (30.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S A Srinivasan L4 | A MAIMUNISHA L5 | PVR DEVELOPERS AND BUILDERS L3 | M/S KBB Construction L2 | E M UMAPATHI, CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00Vellore District Providing of Cement Concrete Drainage at near Perumal koil in Anaicut Panchayat Anaicut Block SFC (DP) 2026-2027 Package no 02 | ||||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 106 | cum | 266.42 ₹28,240.52 | 268.42 ₹28,452.52 | 263.65 ₹27,946.9 | 255.86 ₹27,121.16 | 180 ₹19,080 Lowest |
| 3.00 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 20.95 | cum | 5,350.6 ₹1,12,095.07 | 5,390.86 ₹1,12,938.52 | 5,294.97 ₹1,10,929.62 | 5,138.7 ₹1,07,655.77 | 4,500 ₹94,275 Lowest |
| 4.00 | Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete | 470.76 | sqm | 552.98 ₹2,60,320.86 | 557.14 ₹2,62,279.23 | 547.23 ₹2,57,613.99 | 531 ₹2,49,973.56 Lowest | 600 ₹2,82,456 |
| 5.00 | Cement concrete in 1:3:6 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 56.25 | cum | 6,109.35 ₹3,43,650.94 | 6,155.32 ₹3,46,236.75 | 6,045.83 ₹3,40,077.94 | 5,867.5 ₹3,30,046.88 | 3,700 ₹2,08,125 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 4.13 | cum | 6,655.12 ₹27,485.65 | 6,705.2 ₹27,692.48 | 6,585.94 ₹27,199.93 | 6,391.5 ₹26,396.9 | 6,000 ₹24,780 Lowest |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.18 | nos | 92,780.06 ₹16,700.41 | 93,478.21 ₹16,826.08 | 91,815.51 ₹16,526.79 | 89,105 ₹16,038.9 | 2,000 ₹360 Lowest |
| 8.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.72 | nos | 9,110.45 ₹6,559.52 | 9,179.01 ₹6,608.89 | 9,015.74 ₹6,491.33 | 8,750 ₹6,300 | 3,500 ₹2,520 Lowest |
| 9.00 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 86.78 | nos | 591.72 ₹51,349.46 | 596.17 ₹51,735.63 | 585.57 ₹50,815.76 | 568.5 ₹49,334.43 | 220 ₹19,091.6 Lowest |
| 10.00 | Provision of Name board Charges | 1 | nos | 1,010 ₹1,010 | 1,017.6 ₹1,017.6 | 999.5 ₹999.5 | 970 ₹970 Lowest | 2,500 ₹2,500 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
28 Sept 2026, 3:00 pmClosed
THE BLOCK DEVELOPMENT OFFICE,ANAICUT
THE BLOCK DEVELOPMENT OFFICE,ANAICUT
Vellore District Providing of Cement Concrete Drainage at near Perumal koil in Anaicut Panchayat Anaicut Block SFC (DP) 2026-2027 Package no 02
2026_RDTN_702694_1
A2/2639/2026
Open Tender
Civil Works
Item Rate
180 days
THE BLOCK DEVELOPMENT OFFICE, ANAICUT
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10,000
28 Sept 2026
9 Sept 2026
28 Sept 2026
9 Sept 2026
28 Sept 2026
9 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Vellore District Providing of Cement Concrete Drainage at near Perumal koil in Anaicut Panchayat Anaicut Block SFC (DP) 2026-2027 Package no 02 | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead of 10m initial lift of 2m in Hard stiff clay soil etc complete for open foundation as per SS 20 B | 106 | cum | - | - |
| 3 | Cement concrete in 1:4:8 mix using 40mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 20.95 | cum | - | - |
| 4 | Supplying & Erecting Centering for sides & soffits including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings complete complying for etc Complete | 470.76 | sqm | - | - |
| 5 | Cement concrete in 1:3:6 mix using 20mm ISS HBG metal including all Cost and conveyance of labour charges etc.,Complete., | 56.25 | cum | - | - |
| 6 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. | 4.13 | cum | - | - |
| 7 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.18 | nos | - | - |
| 8 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 0.72 | nos | - | - |
| 9 | Plastering with Cement Mortar 1:4 (One Cement and Three P.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 86.78 | nos | - | - |
| 10 | Provision of Name board Charges | 1 | nos | - | - |
stage.html
html • 0.02 MB
finance_844742.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Tendernotice_2.pdf
PDF • 0.38 MB
BOQ_844742.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .