Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.8 LAdmitted-Finance | -39.32% | ₹11.8 L | L1 | Admitted-Finance |
| 2 | L2₹12.6 LAdmitted-Finance | -35.00% | ₹12.6 L | L2 | Admitted-Finance |
| 3 | L3₹14.1 LAdmitted-Finance | -27.60% | ₹14.1 L | L3 | Admitted-Finance |
Tender Value
₹19.4 L
EMD Value
₹38,820
Closing Date
13 Aug 2026, 6:00 pmClosed
Executive Engineer S and D Division Ist
Suliman Complex Dalgate Srinagar
Raising of manholes of sewer lines at various Locations in Pahalgam
2026_HAUDD_319266_2
e-NIT No.29 of 2026-27
Open Tender
Civil Works
Percentage
180 days
Pahalgam Kashmir
as pe NIT/SCC
2 documents required · 2 mandatory
₹1,100
Chief Engineer J and K UEED
₹38,820
21 Aug 2026
3 Aug 2026
14 Aug 2026
3 Aug 2026
13 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling manually/ mechanically including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: Bituminous road. | 301.44 | Sqm | 305.95 | ₹92,225.57 |
| 2 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
(1:3:6 or richer mix (i/c equivalent design mix) | 20.81 | Cum | 1,725.2 | ₹35,901.41 |
| 3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | |||||
| 3.01 | 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 41.63 | Cum | 6,591.25 | ₹2,74,393.74 |
| 4Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level | |||||
| 4.01 | 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 42.8 | Cum | 7,788.4 | ₹3,33,343.52 |
| 5Centering and shuttering incl. Strutting, propping etc and removal of form work for:- | |||||
| 5.01 | Suspended floors, roofs, landings, balconies and access platforms. | 25.44 | Sqm | 718.2 | ₹18,271.01 |
| 5.02 | Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. | 94.2 | Sqm | 628.95 | ₹59,247.09 |
| 5.03 | Extra for shuttering in circular work (20% of respective centering and Shuttering items). | 94.2 | Sqm | 125.79 | ₹11,849.42 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.42 MB
BOQ_1056574.xls
BOQ • 0.28 MB
sccnit29.pdf
Other Document • 0.40 MB
Corrigendum-I-NIT29.pdf
PDF • 0.96 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].