Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 15 55 237 A NEAR MANDI SAMITI GATE MANDI GATE MAJHOLA MORADABAD UTTAR PRADESH 244001 | MORADABAD | UTTAR PRADESH | 244001 | Admitted-Finance |
| 2 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹1.5 L
EMD Value
₹2,000
Closing Date
22 Sept 2020, 12:00 pmClosed
EE ETD SAMBHAL
220KV Sirsi Sambhal
INSTALLATION AND FIXING OF SECTION ISOLATOR AT 220KV S/S SAMBHAL AND OVERHAULING OF 145/36KV BUS AND LINE ISOLATORS INSTALLED AT VARIOUS 220/132KV SUB-STATIONS UNDER ETD SAMBHAL
2020_UPTCL_504434_1
T-05/ETD/S/2020-21
Open Tender
Electrical Works
Fixed-rate
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD SAMBHAL
₹2,000
22 Sept 2020
24 Aug 2020
22 Sept 2020
24 Aug 2020
22 Sept 2020
24 Aug 2020
Amount
The Following works are to be carried out at 220 KV S/S Sambhal under ETD Sambhal
Repairing and overhauling of 145KV Bus/Line Isolator make round blade/strip type by opening jaws housing, finger, proper rubbing dust and flashing spot, opening isolator operating box & proper cleaning, lubrication & greasing of each moving parts, replacement damaged jaws, blades, clamps etc. providing white petroleum jelly in jaws & blade heads. Finally checking of each isolator for smooth closing/opening & trouble free operation installed. (Jaws, Blades, Clamps, shall be provided by the department free of cost as per actual consumption). (A) 40MVA T/F -I &II at 220KV S/S Sambhal - 02 Nos (B) 132KV Sambhal(220)-Sambhal Line-I, at 132KV S/S Sambhal -01 No (C)40MVA T/F -I &II at 220KV S/S Chandausi -02 Nos (D)132KV DSM Rajpura Line at 132KV S/S Babrala -01 No
Repairing and overhauling of 36KV Bus/Line Isolator make round blade/strip type by opening jaws housing, finger, proper rubbing dust and flashing spot, opening isolator operating box & proper cleaning, lubrication & greasing of each moving parts, replacement damaged jaws, blades, clamps etc. providing white petroleum jelly in jaws & blade heads. Finally checking of each isolator for smooth closing/opening & trouble free operation installed. (Jaws, Blades, Clamps, shall be provided by the department free of cost as per actual consumption). (A) Feeder No. 07 (Rajpura) at 132KV S/S Babrala -01 No
Fixing of 132 KV section isolator capacity 2000 Amp. At 132 KV Main Bus for spliting and deviding the 132 KV Main Bus in two section by opening the existing jumpers between two sections of 132 KV Main bus at that place where fixing the section isolator. Completing the work by making and fixing the new jumpers between main bus and section isolator both section of main bus. Also including the Earthing of Isolator with earth rod by using 50x6mm MS Strip. (A)220KV S/S Sambhal NOTE- All the materials will be provided the departement free of cost the contractor except welding electrodes, T&P, skill technical staff & labour
NAVEEN AND COMPANY
P&H Engineering
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .