Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹93.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹95.3 L+₹1.4 L (1.46%)Rejected-Finance | L2 | Rejected-Finance L2 Tenderer |
Tender Value
₹95.1 L
EMD Value
₹96,000
Closing Date
4 May 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Upgradation and Strengthening of 2 Roads in Walajabad Block in Kancheepuram District having PKG No.TNKPM 32/2022-23
2023_RDTN_304120_1
DIPR/2142/Tender/2023 dt.14.04.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
Kancheepuram District
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹96,000
O/o The Project Director DRDA Kancheepuram
12 Jul 2023
19 Apr 2023
4 May 2023
19 Apr 2023
4 May 2023
19 Apr 2023
25 Apr 2023
Amount
Part I - Strengthening Karur to Karur H/C (R-31) in Karur Panchayat cost of Construction cost Rs.45.35 Lakh & Maintenance Cost Rs.3.60 lakh
Clearing the light jungle including all labour charges for burrying and burning etc., complete.
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with Paver
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying Tack coat over the WMM surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges etc complete
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Filling of Gravel for Side Berms including all cost and conveyance and labour charges etc.complete.
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
RCC Culvert 1.50m Span - 2 Nos @ Ch 0/360m & Ch 0/480m
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Below Sill
AboveSill
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Providing and fixing kraft Paper for bearing Between Bed Block & Deck slab
Providing and fixing 20mm Bituman pad Between Bed Block & Dirt Wall
Providing weepholes in brick masonry/ stone masonry,plain/ reniforced concrete abutment,wing wall,retrun wall with 100mm dia AC pipe extending through the full width of the Structure with slope towards drawing face complete
Provision For HM Stone
Provision For KM Stone
Nameboard and Citizen Board
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
Part II - Upgradation of road From Kaliyanur Village BG Road Km 0/0 -0/730 (R-36) in Kaliyanur Panchayat cost of Construction cost Rs.43.52 Lakh & Maintenance Cost Rs.2.63 lakh
Clearing the light jungle including all labour charges for burrying and burning etc., complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers with Paver
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying Tack coat over the WMM surface using with Emulsion bitumen binder 2.5kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges etc complete
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 46.28kgs of VG30 bitumen and 4.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Filling of Gravel for Side Berms including all cost and conveyance and labour charges etc.complete.
Road Marking with hot applied thermoplastic Compound with Reflectorising Glass Beads on Bituminous surface
Provision For HM Stone
Nameboard and Citizen Board
RCC Culvert 1.50m Span - 2 Nos @ Ch 0/360m & Ch 0/480m
Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, in hard stiff clay, stiff black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B
Supply and filling foundation and basement with filling sand in layer not more than 15cm,thick well ramed,watered and compacted complete complying with standard specification
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Cement Concrete 1:3:6 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Below Sill
AboveSill
Supplying and erecting centring sor sides and soffits with M.S sheets laid over silver oak joists with casurina props for supporting,labour charges etc.,complete
Cement Concrete 1:2:4 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Reinforced Cement Concrete 1: 1 1/2: 3 mix using 20mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
Supplying and fabricating and placing in position of Mild /Tor steel for all RCC works as per the design given including cost of all steel,binding wire and labour forfabrication etc.,complete complying with standard specification
Providing and fixing kraft Paper for bearing Between Bed Block & Deck slab
Providing and fixing 20mm Bituman pad Between Bed Block & Dirt Wall
Providing weepholes in brick masonry/ stone masonry,plain/ reniforced concrete abutment,wing wall,retrun wall with 100mm dia AC pipe extending through the full width of the Structure with slope towards drawing face complete
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
T.PREM KUMAR
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .