Loading…
Loading…
Tender Value
₹8.6 L
EMD Value
₹90,000
Closing Date
3 Sept 2026, 1:00 pm6d left
Executive Engineer
Saryu Nahar Khand-4, Balrampur
Constructing outlet of 4 No. of Udaipur Dy., 4 No. of dilawalpur Dy. and 10 No. of Husainabad Dy.in district Balrampur
2026_UPIDC_1179748_4
01/EE/2026-27
Open Tender
Civil Works - Canal
Item Wise
120 days
Balrampur
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹90,000
Yes
25 Aug 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Constructing outlet of 4 No. of Udaipur Dy., 4 No. of dilawalpur Dy. & 10 No. of Husainabad Dy.in district Balrampur | |||||
| 1.01 | E/W in digging foundation of masonry work in all types of soil,including all lead and lift with disposal of earth as per direction of Engineer in charge. | 0.2 | cum. | - | - |
| 1.02 | Laying C.C. M-10(1:3:6) grade in foundation with brick ballast 20 to 40 mm size & Hamirpur coarse sand of F.M.not 2.0 including all cost of material,labour,T&P etc.required for proper completion of work. | 1 | cum. | - | - |
| 1.03 | Laying & fixing in position and alignment of 150 mm dia hume pipe for outlet at left bank and right bank of canal including all cost of material labour and T&P etc. required for proper completion of work. | 46 | RM. | - | - |
| 1.04 | Laying C.C. M-15 (1:2:4) mix with Dala crushed stone grit graded size 4.75 to 20 mm size with Hamirpur coarse sand of F.M. not less than 2.0 including all cost of material ,labour ,T&P etc. required for proper completion of work. | 2.81 | cum. | - | - |
| 1.05 | First class brick work in 1:4 C.M. with Hamirpur coarse sand of F.M. not less than 2.0 including all cost of material ,labour ,T&P etc. required for proper completion of work. | 44.77 | cum. | - | - |
| 1.06 | 12 mm thick cement plaster on brick work in 1:4 C.M. with kanhar coarse sand of F.M. not less than 2.0 including all cost of material ,labour ,T&P etc.with floating coat of neat cement over plaster, required for proper completion of work. | 0.8 | Sqm. | - | - |
| 1.07 | E/W in filling for strengthing of canal section with mannual compaction and dressing ,including all lead and lift,all cost of material,labour,T&P etc. complete work. | - | cum. | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
BOQ_2218390.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].