Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC BHAIRAVNATH NAGAR AT KUSGAON POST LONAVLA 410 401 DISTT PUNE | PUNE | MAHARASHTRA | 410401 | L1 | Accepted-AOC Quoted rate are reasonable | |
| 2 | L2₹29.0 L+₹42,871.90 (1.50%)Rejected-Finance PLOT NO 14 NEAR BALGRAM INS SHIVAJI ROAD LONAVLA 410 401 | PUNE | MAHARASHTRA | 410401 | L2 | Rejected-Finance Not lowest bidder | |
| 3 | L3₹30.0 L+₹1.4 L (4.96%)Rejected-Finance | L3 | Rejected-Finance Not lowest bidder | |
| 4 | L4₹31.0 L+₹2.4 L (8.50%)Rejected-Finance 601 A WING SAI PARAMOUNT APARTMENT SHRADDHA VIHAR COLONY INDIRANAGAR NASHIK NASHIK MAHARASHTRA 422009 | NASHIK | MAHARASHTRA | 422009 | L4 | Rejected-Finance Not lowest bidder | |
| 5 | L5₹33.1 L+₹4.6 L (16.0%)Rejected-Finance 503 GIRIRAJ HEIGHT VAITY WADI L B S MARG NEAR HARINIWAS CIRCLE THANE 400 602 | THANE | MAHARASHTRA | 400602 | L5 | Rejected-Finance Not lowest bidder |
| Sl No | Description | Qty | Unit | United Engineers and Contractors L5 | VIJAYA ENTERPRISES L2 | SAI SERVICE L3 | seema enterprises L1 | SAI SAMARTH ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of rein- forced cement concrete (RCC water tanks with platform ) as in top of roofs ,floors (other than ground floors ) beams,stair cases,landings,chajjas and similar suspended works etc, (rein forcement cut as required to facilitate demolition /dismental), including remval of debris complete all as specifed and directed. | 8.79 | Cum | 3,000 ₹26,370 | 1,008 ₹8,860.32 | 500 ₹4,395 | 500 ₹4,395 | 400 ₹3,516 Lowest |
| 2.00 | Dismantling of water tanks exc 250& n exc500 ltr capacity and removing to store complete all as specified and directed. | 4 | Each | 750 ₹3,000 | 180 ₹720 Lowest | 600 ₹2,400 | 200 ₹800 | 200 ₹800 |
| 3.00 | S&F Rotational moulded polyethylene water storage tanks (cylindrical vertical with closed top) triple layered 500 ltrs capacity hoisted and fixed in position including 25mm dia float ball brass valve and flynut complete, screwed for iron pipe or brass ferrule and fixed all as specified | 6 | Each | 6,000 ₹36,000 | 5,004 ₹30,024 | 6,500 ₹39,000 | 4,000 ₹24,000 Lowest | 4,500 ₹27,000 |
| 4.00 | Completely removal of existing water proofing treatment of any descriptions and in any position (APP membrane, etc) and including demolition concrete padding with top layer of plaster, and roughening of concrete slab by picking, sweeping clean and washing down with water to remove dust etc and applying evenly cement slurry at the rate of 3kg / sqm over cleaned roof surfaces complete all as specified and as directed by Engr-in-charge. | 180 | Sqm | 75 ₹13,500 | 108 ₹19,440 | 200 ₹36,000 | 30 ₹5,400 Lowest | 50 ₹9,000 |
| 5.00 | Material and labour for PCC 1:2:4 type BO (using 12.50mm graded stone aggregate) for roof ,kerbs or mud stops,rounded or chamfered on eds etc including mixing of admixture fosroc SP 430 of M/S Fosroc chemical @ 250ml per 50kg of cement over existing roof and in padding concrete to maintain required slope complete all as specified and as directed by Engr-in-charge. Note:- WPC will be measured and paid separetly under respective item. | 9 | cum | 5,000 ₹45,000 | 3,033 ₹27,297 | 7,000 ₹63,000 | 3,000 ₹27,000 Lowest | 5,000 ₹45,000 |
| 6.00 | Supply only of admixture fosroc SP 430 ,Dr fixit Chemical all as specified and as directed by the Engineer-in-Charge. | 15 | Ltr | 150 ₹2,250 | 360 ₹5,400 | 250 ₹3,750 | 100 ₹1,500 Lowest | 200 ₹3,000 |
| 7.00 | Material and labour for screed bed layer 10 mm thick in CM 1:4 on concrete surfaces of roof, mixed with integral water proofing compound @ 3% by weight of cement, finished even and smooth without using extra cement complete all as specified and directed.
Note:- WPC will be measured and paid separetly under respective item. | 180 | sqm | 175 ₹31,500 | 225 ₹40,500 | 200 ₹36,000 | 100 ₹18,000 Lowest | 100 ₹18,000 Lowest |
| 8.00 | Supply liquid water proofing compound make Fos roc or equivalent make | 45 | lts | 250 ₹11,250 | 108 ₹4,860 | 400 ₹18,000 | 65 ₹2,925 | 60 ₹2,700 Lowest |
| 9.00 | Material and labour for cleaning the entire roof surface thoroughly to remove all loose particles,dust/dirt particles and applying with one coat of industrial bitumen 85/25 grade at the rate of 1.20 kg/sqm over the plastered surfaces of roof over APP based polymeric membrane minimum weighing 3kg/sqm and minium 3mm thick reinforced with polyester non woven fabric (weight not less than 150 gms/ sqm) laid on primed surfaces by gas flame torch application and applying evenly industrial bitumen 85/25 grade at the rate of 1.20kg/sqm over APP membrane including two coat of aluminium paint complete all as specified and as directed by Engineer-in-Charge | 200 | Sqm | 400 ₹80,000 Lowest | 720 ₹1,44,000 | 650 ₹1,30,000 | 500 ₹1,00,000 | 700 ₹1,40,000 |
| 10.00 | S&F in repair 25 mm dia gate /sluce valave fixed to pipe complete all as specified and directed. | 6 | Each | 800 ₹4,800 | 720 ₹4,320 | 1,250 ₹7,500 | 500 ₹3,000 | 300 ₹1,800 Lowest |
Tender Value
₹37.9 L
EMD Value
₹75,800
Closing Date
26 Sept 2025, 6:00 pmClosed
Gaurav Tiwari, IDSE
GE (I) (NAVY), INS SHIVAJI - POST, LONAVLA -410402
SPECIAL REPAIR TO BLDG NO P 310 CPO POOL AT NSB STATION LONAVLA
2025_MES_727252_1
GE/LONAVLA/8348/E8
Open Tender
Civil Works
Item Rate
225 days
GE (I) (NAVY) LONAVLA
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
GE (I) (NAVY) LONAVLA
₹75,800
Yes
17 Jan 2026
22 Aug 2025
29 Sept 2025
22 Aug 2025
26 Sept 2025
12 Sept 2025
22 Aug 2025 - 6 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .