| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | ₹14.8 L Quoted ₹15.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹15.5 L+₹18,777.60 (1.23%)Rejected-Finance | ₹15.5 L+₹18,777.60 (1.23%) | L2 | Rejected-Finance L2 |
| 3 | L3₹15.7 L+₹44,204.80 (2.90%)Rejected-Finance | ₹15.7 L+₹44,204.80 (2.90%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Chhering L1 | JANGBO L3 | KAMI SHERPA L2 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respects as per direction of the Engineer-in-charge. (Pick work 90% & Jumper work 10%) | 28.16 | Cum | 875 ₹24,640 Lowest | 950 ₹26,752 | 900 ₹25,344 |
| 2.00 | Providing and laying in position of reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 30.72 | Cum | 15,500 ₹4,76,160 | 14,100 ₹4,33,152 | 13,500 ₹4,14,720 Lowest |
| 3.00 | Providing and laying steel reinforcement (Tor Steel) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor two level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 2,764.8 | Kg | 115 ₹3,17,952 | 112 ₹3,09,657.6 Lowest | 116 ₹3,20,716.8 |
| 4.00 | Providing and fixing centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 80.64 | Sqm | 800 ₹64,512 | 650 ₹52,416 Lowest | 750 ₹60,480 |
| 5.00 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 89.6 | Sqm | 400 ₹35,840 Lowest | 500 ₹44,800 | 450 ₹40,320 |
| 6.00 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 89.6 | Sqm | 90 ₹8,064 | 90 ₹8,064 | 88 ₹7,884.8 Lowest |
| 7.00 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 89.6 | Sqm | 160 ₹14,336 Lowest | 182 ₹16,307.2 | 180 ₹16,128 |
| 8.00 | Writing lettering with black Japan paint of approved brand and manufacture of specified height in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | 78,208 | Cm | 6 ₹4,69,248 Lowest | 7.25 ₹5,67,008 | 7 ₹5,47,456 |
| 9.00 | Conducting detailed survey and marking of HFL (High Flood Level) and LWL (Low Water Level) at site using Total Station, complete in all respects as per the directions of the Engineer-in-Charge. | 32 | Job | 3,610 ₹1,15,520 | 3,510 ₹1,12,320 | 3,500 ₹1,12,000 Lowest |
Tender Value
₹14.9 L
EMD Value
₹29,890
Closing Date
15 Jul 2026, 5:00 pmClosed
Executive Engineer
O/o Jal Shakti Division Keylong District Lahaul Spiti HP
C/O RCC Flood level indicator
2026_HPIPH_138106_1
3587-3637 dt 04.07.2026 Ghepan Ghat
Open Tender
Civil Works
Item Rate
180 days
Jal Shakti Division Keylong Lahaul Spiti HP
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Keylong
₹29,890
4 Aug 2026
6 Jul 2026
16 Jul 2026
6 Jul 2026
15 Jul 2026
6 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations, trenches etc. in earth work, lift upto 1.50 metres stacking the excavated soil not more than 3 metres clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required in to plinths sides of foundations etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed within a lead of 20 metres complete in all respects as per direction of the Engineer-in-charge. (Pick work 90% & Jumper work 10%) | - | Cum | - | - |
| 2 | Providing and laying in position of reinforced cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Cum | - | - |
| 3 | Providing and laying steel reinforcement (Tor Steel) for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor two level in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Kg | - | - |
| 4 | Providing and fixing centering and shuttering including strutting, propping etc. and removal of form for all heights : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Sqm | - | - |
| 5 | 12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand) in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Sqm | - | - |
| 6 | Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Sqm | - | - |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade two or more coats on new work in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Sqm | - | - |
| 8 | Writing lettering with black Japan paint of approved brand and manufacture of specified height in all leads and lifts and to the entire satisfaction of Engineer-in- charge. | - | Cm | - | - |
| 9 | Conducting detailed survey and marking of HFL (High Flood Level) and LWL (Low Water Level) at site using Total Station, complete in all respects as per the directions of the Engineer-in-Charge. | 32 | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_204544.xls
BOQ • 0.28 MB
Form6GhepanGhat.pdf
Tender Documents • 0.43 MB
Form8GhepanGhat.pdf
Tender Documents • 1.60 MB
TCGhepanGhat.pdf
Additional Documents • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .