| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.2 LAccepted-AOC | ₹47.2 L Quoted ₹48.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹50.4 LRejected-AOC NH 3 A 145 VINDHYANAGAR SINGRAULI MADHYA PRADESH 486885 UDYAM MP 11 0000161 | SINGRAULI | MADHYA PRADESH | 486885 | ₹50.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹53.1 LRejected-AOC NEAR KRAYA VIKRAY SAMITI ASHOK NAGAR DISTRICT FATEHPUR | KANPUR NAGAR | UTTAR PRADESH | 208001 | ₹53.1 L | L3 | Rejected-AOC L3 |
Tender Value
₹47.2 L
EMD Value
₹56,700
Closing Date
2 Sept 2023, 6:00 pmClosed
SE O AND MC2 ATPS ANPARA
OPERATIONS AND MAINTENANCE CIRCLE-II, Anpara Thermal Power Station, Anpara, Sonbhadra
Routine and breakdown maintenance of coal mill reject system Operation and Evacuation of coal mill reject from pyrite hopper of bowl mills (XRP803) and transportation of same to coal yard of all three units of 3 210MW ATPS Anpara
2023_RVUNL_827640_1
N-ANP/A/OMC2/BMD1/6000002060
Open Tender
Repair and Maintenance Works
730 days
SE O AND MC2 ATPS ANPARA
Please refer Tender doccument
3 documents required · 3 mandatory
₹1,180
Chief Finance and Account Officer,Anpara
₹56,700
17 Jan 2026
9 Aug 2023
5 Sept 2023
9 Aug 2023
2 Sept 2023
9 Aug 2023
Amount
Opening of pyrite hopper gate for removal of pyrites from pyrite hoppers of bowl mill of all the three units and removal of its chocking. [work in per unit per shift will be treated as one job]
Operation of CMR Belt and sump pump and routine checking of main drive gear box, pulleys, sump pump, flap gate, attending of minor air leakage from pyrite hopper, greasing of all types of pulleys / sump pump, make up oil in main gear box and other minor nature of misc. works. [This work shall be carried out in all three shifts. It one shift will be treated as one Job]
Cleaning of entire CMR trench, desk plate, out-side of the trench, ladders, equipment on storage bin platforms, structure, sump pump floor & pits.
Mechanical loading of coal mill reject from CMR storage bin, its transportation & unloading in the dumping yard within a radial distance of 04 KM with dumper.
Manual loading of coal mill reject from mill area near pyrite hopper & under the structure of CMR system, its transportation & unloading in the dumping yard within a radial distance of 04 Km with tractor trolley/dumper
Replacement of damaged carrying / return / impact idlers by new / repaired
Replacement of damaged idler frame / bracket
Repairing of damaged carrying / return / impact idlers
Re-fixing of dislocated idlers from their frames / brackets
Repairing of idlers frame/bracket by cutting, welding and machining.
Splicing of belt by hot vulcanizing joint and preparation of joint including removal of roller structure etc. required for carrying out the work and refitting the same after completion of work
Splicing of belt by cold vulcanizing joint and preparation of joint including removal of roller structure etc. required for carrying out the work and refitting the same after completion of work
Conveyor belt jointing by means of clamping system work including removing of idlers and refitting the same after completion of work. Clamp for jointing shall be arranged by the agency.
Laying of new / old & healthy conveyer belt
Removal of damaged belt and shifting of the same to scrap yard
Replacement/repairing of pyrite hopper gate/flap/shaft etc.
Repairing of pyrite hopper body by cutting, welding, patching etc.
Replacement of Head Pulley
Replacement of Snub / Bend Pulley
Replacement of Take-up Pulley
Replacement of Tail Pulley
Repairing of different damaged pullies of CMR system already removed by cutting, welding, machining etc.
Replacement of damaged bearing / plumber block / sleeve of different pullies
Replacement of bearings of gear box of CMR system
Attending oil leakage from gear box of CMR system
Complete overhauling of gearbox of CMR system
Removal and remounting of coupling of gear box / motor
Alignment of gear box with motor & main pulley
Complete overhauling of pyrite hopper assy.
Neoprene rubber lagging on different pullies (herring diamond / bones grooved + 5% shore hardness 10 to 12 mm thick neoprene rubber will be arranged by agency)
Cleaning of storage bin
Complete overhauling of Sump Pumps
Repairing of take-up guides and their positioning, strengthening etc.
Repairing of flap gate of storage bin
Replacement of liner plate of storage bin
Replacement of liner plate of pyrite hopper
Replacement of damaged gearbox by new /repaired.
Removal, fabrication, re-erection and alignment of damaged/eroded stringer, channel, support, deck sheet etc, of conveyer bed.
Removal, fabrication and re-installation of worn-out/damaged hopper plate from gratings of CMR system along with their supporting channels/beams/angles etc.
Fabrication of new pyrite hopper gate.
M/s Krishna Engineering Works
M/S SURYA CONSTRUCTION COMPANY
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf