Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.2 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹10.7 L+₹50,733 (4.99%)Rejected-Finance | L2 | Rejected-Finance open tender |
| Sl No | Description | Qty | Unit | D A SUBRAMANIAM L1 | K S MURUGAN L2 |
|---|---|---|---|---|---|
| 1.00Name of the Work : Strengthening the Road from Erangattupalayam - Marampalayam road to Kottapalayam road km 0/0-0/300 - (R 80) - MLACDS - 2025-2026 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 336 | Sqm | 5.94 ₹1,995.84 Lowest | 7 ₹2,352 |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 157.5 | Cum | 131.29 ₹20,678.18 Lowest | 135 ₹21,262.5 |
| 4.00 | Providing and laying including cost and conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by power roller to achieve the required Proctor density at 100% compaction at Optimum moisture content and hire fuel charges for powerroller, watersprinkler and all other incidental charges such as traffic barricading and providing dangerlights etc. comp for base-course and side berms. | 42 | Cum | 431 ₹18,102 Lowest | 435 ₹18,270 |
| 5.00 | Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4 | 449.21 | Sqm | 21.8 ₹9,792.78 Lowest | 25 ₹11,230.25 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 136.13 | Cum | 2,091 ₹2,84,647.83 Lowest | 2,120 ₹2,88,595.6 |
| 7.00 | Providing and laying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,361.25 | Sqm | 81.5 ₹1,10,941.88 Lowest | 85 ₹1,15,706.25 |
| 8.00 | Providing and laying TACK COAT over Primed WMM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m. Including cost of bituminous emulsion which will be supplied by the department at section stores and its cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion by mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete as per clause 503 of MOST specification. | 1,361.25 | Sqm | 19 ₹25,863.75 Lowest | 22 ₹29,947.5 |
| 9.00 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials, complete as per clause 504 of MORTH Specification | 34.04 | Cum | 11,191 ₹3,80,941.64 Lowest | 12,000 ₹4,08,480 |
| 10.00 | Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 ( HM Stone) | 1 | Nos | 780 ₹780 Lowest | 800 ₹800 |
Tender Value
Refer Docs
EMD Value
₹20,600
Closing Date
14 Jul 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
BDO BP
Strengthening the Road from Erangattupalayam - Marampalayam road to Kottapalayam road km 0/0-0/300 - (R 80) MLACDS - 2025-2026
2025_RDTN_577910_1
Ref No.1644/2025/A2 Dt.03.07.2025
Open Tender
Civil Works
Item Rate
Block Development Office Bhavanisagar
Strengthening the Road from Erangattupalayam - Marampalayam road to Kottapalayam road km 0/0-0/300 - (R 80) MLACDS - 2025-2026
2 documents required · 2 mandatory
₹0
₹20,600
Yes
25 Mar 2026
4 Jul 2025
14 Jul 2025
4 Jul 2025
14 Jul 2025
4 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_690586.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_690586.xls
BOQ • 0.28 MB
techbid.pdf
Tender Documents • 0.57 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .