Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC SANTOSH NAGAR COLONY LACHHIPUR BARGADWA GOKAKHPUR UP 273015 | GOKAKHPUR | GORAKHPUR | UP | 273015 | ₹9.3 L | L1 | Accepted-AOC Techno-commercial L1 suitable basis |
| 2 | L2₹10.6 LRejected-Finance NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹10.6 L | L2 | Rejected-Finance Commercially not acceptable |
| 3 | L3₹16.2 LRejected-Finance CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER E M DEPARTMENT SAUNDA D BARKA SAYAL AREA | BOKARO | JHARKHAND | 825102 | ₹16.2 L | L3 | Rejected-Finance Commercially not acceptable |
| Sl No | Description | Qty | Unit | Rajneesh Electricals L2 | coalfields engineering works L3 | SHIVAM INDUSTRIES L1 |
|---|---|---|---|---|---|---|
| 1.00 | Cost of Copper wire/strip (Cost of copper to be quoted less scrap copper cost) Copper wire for primary coil one limb 346.40 Kg x 3 limb =1039.20 Kg Copper wire for secondary coil one limb = 184.8 Kg x 3 limb =554.40 Kg | 1,593.6 | Kg | 400 ₹6.4 L | 440 ₹7.0 L | 250 ₹4.0 L |
| 2.00 | Insulating material cost | 1 | No | 1,25,000 ₹1.3 L | 2,62,226 ₹2.6 L | 60,000 ₹60,000 |
| 3.00 | Labour cost | 1 | No | 1,00,000 ₹1 L | 2,62,226 ₹2.6 L | 50,000 ₹50,000 |
| 4.00 | Profit | 1 | No | 25,000 ₹25,000 | 1,22,372 ₹1.2 L | 50,000 ₹50,000 |
| 5.00 | Installation of Transformer and bus bar by providing man power at site | 1 | No | 15,000 ₹15,000 | 25,000 ₹25,000 | 2,30,000 ₹2.3 L |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹15.0 L
EMD Value
₹18,800
Closing Date
5 Jan 2026, 11:00 amClosed
SO(EnM)
GM Office Charhi
Complete rewinding/repairing of 3MVA 33KV/ 3.3KV Power Transformer of PEOCP under Hazaribag Area
2025_CCL_349946_1
GM(H)/EnM/Tender/25-26/63
Open Tender
Electrical and Maintenance Works
30 days
PEOCP
Please refer Tender documents.
2 documents required · 2 mandatory
₹18,800
6 May 2026
23 Dec 2025
6 Jan 2026
24 Dec 2025
5 Jan 2026
24 Dec 2025
24 Dec 2025 - 27 Dec 2025
Cost of Copper wire/strip (Cost of copper to be quoted less scrap copper cost) Copper wire for primary coil one limb 346.40 Kg x 3 limb =1039.20 Kg Copper wire for secondary coil one limb = 184.8 Kg x 3 limb =554.40 Kg
Insulating material cost
Labour cost
Profit
Installation of Transformer and bus bar by providing man power at site
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.03 MB
BOQ_362691.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid