Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50,764.95Accepted-AOC GSTIN: 21AXWPK3133B2ZTBRAJRAJNAGAR BUDUAM ORIENT COLLIERY 768233 ODISHA INDIA | BRAJRAJNAGAR | JHARSUGUDA | ODISHA | 768233 | ₹50,764.95 Quoted ₹43,021.15 | L1 | Accepted-AOC On being L1 |
| 2 | L2₹47,765.65Rejected-Finance GSTIN: 21AHQPR9987A1ZUORIENT COLLIERY BUDHIJAM BRAJRAJNAGAR 768233 | JHARSUGUDA | ODISHA | 768233 | ₹47,765.65 | L2 | Rejected-Finance On being L2 |
| 3 | L3₹49,767.60Rejected-Finance | ₹49,767.60 | L3 | Rejected-Finance On being L3 |
| Sl No | Description | Qty | Unit | OM SHRI SAI TRADERS L2 | M/S RAHUL ELECTRICAL WORKS L3 | MAMAJI ENTERPRISES L1 |
|---|---|---|---|---|---|---|
| 1.00Repair of 01 No. of Float Evaporator & 01 no. of Float condenser Assy of air conditioning system applicable to BEML make BD-355A Dozers & 01 No. of failed Evaporator assy applicable to CAT make Wheel Dozer 834K Sl.No.LWY00743. | ||||||
| 1.01 | Filter Material | 3.65 | Kgs | 791 ₹2,887.15 | 824 ₹3,007.60 | 712.5 ₹2,600.62 |
| 1.02 | Soldering Material(Zinc Base) | 3 | Kgs | 949 ₹2,847 | 990 ₹2,970 | 855 ₹2,565 |
| 1.03 | Cleaning Agent | 8.5 | Kgs | 147 ₹1,249.50 | 154 ₹1,309 | 133 ₹1,130.50 |
| 2.00Labour Charges | ||||||
| 2.01 | 1) Dismantling of Evaporator core assy. 2) Cleaning of Tubes 3) Repairing of Damaged Tubes 4) Assembling of Evaporator Core assy 5) Testing of Leakage | 3 | Shift | 4,388 ₹13,164 | 4,571 ₹13,713 | 3,951.7 ₹11,855.09 |
| 2.02 | 1) Dismantling of Condenser assy. 2) Washing of Fins with Water and Cleaning of all Tubes with cleaning agent 3) Checking each tube and junctions for leakage with suitable tools 4) Repairing of all the leakages of tubes & reinforcement of the worn out junctions point at Top Bottom of tank 5) Assembling of Condersor assy after repairing of all leakage is done. | 3 | Shift | 3,490 ₹10,470 | 3,636 ₹10,908 | 3,143.06 ₹9,429.17 |
| 2.03 | 1) Dismantling of Condenser assy. 2) Washing of Fins with Water and Cleaning of all Tubes with cleaning agent 3) Checking each tube and junctions for leakage with suitable tools 4) Repairing of all the leakages of tubes & reinforcement of the worn out junctions point at Top Bottom of tank 5) Assembling of Condersor assy after repairing of all leakage is done. | 4 | Shift | 4,287 ₹17,148 | 4,465 ₹17,860 | 3,860.19 ₹15,440.77 |
| 3.00 | Total impact of BOCW Cess for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹53,437
Closing Date
13 Nov 2025, 5:00 pmClosed
Krishna Kumar Tiwari, Sr Manager (Excv)
Office of the Project Engineer (Excv), ILBL OCP, Lakhanpur Area, MCL
Repair of 01 No of Float Evaporator and 01 no of Float condenser Assy of air conditioning system applicable to BEML make BD-355A Dozers and 01 No of failed Evaporator assy applicable to CAT make Wheel Dozer 834K Sl No LWY00743 working at ILBL OCP.
2025_MCL_346635_1
MCL/LKPA/ILBL/ePC-EX/25-26/11
Open Tender
Excavation Department Work
5 days
Excavation Department, ILBL OCP, Lakhanpur Area
Please refer Tender documents.
3 documents required · 3 mandatory
18 Dec 2025
3 Nov 2025
17 Nov 2025
3 Nov 2025
13 Nov 2025
3 Nov 2025
3 Nov 2025 - 6 Nov 2025
Amount
Repair of 01 No. of Float Evaporator & 01 no. of Float condenser Assy of air conditioning system applicable to BEML make BD-355A Dozers & 01 No. of failed Evaporator assy applicable to CAT make Wheel Dozer 834K Sl.No.LWY00743.
Filter Material
Soldering Material(Zinc Base)
Cleaning Agent
Labour Charges
1) Dismantling of Evaporator core assy. 2) Cleaning of Tubes 3) Repairing of Damaged Tubes 4) Assembling of Evaporator Core assy 5) Testing of Leakage
1) Dismantling of Condenser assy. 2) Washing of Fins with Water and Cleaning of all Tubes with cleaning agent 3) Checking each tube and junctions for leakage with suitable tools 4) Repairing of all the leakages of tubes & reinforcement of the worn out junctions point at Top Bottom of tank 5) Assembling of Condersor assy after repairing of all leakage is done.
1) Dismantling of Condenser assy. 2) Washing of Fins with Water and Cleaning of all Tubes with cleaning agent 3) Checking each tube and junctions for leakage with suitable tools 4) Repairing of all the leakages of tubes & reinforcement of the worn out junctions point at Top Bottom of tank 5) Assembling of Condersor assy after repairing of all leakage is done.
Total impact of BOCW Cess for the purpose of CTC
OM SHRI SAI TRADERS (BID ID -1196340)
M/S RAHUL ELECTRICAL WORKS (BID ID -1196339)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.37 MB
Tendernotice_2.pdf
PDF • 1.12 MB
BOQ_359319.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid