| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.5 LAdmitted-Finance | ₹17.5 L | L1 | Admitted-Finance |
| 2 | L2₹20.6 LAdmitted-Finance | ₹20.6 L | L2 | Admitted-Finance |
| 3 | L3₹22.6 LAdmitted-Finance | ₹22.6 L | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MURUGAN G L3 | J JEYAMANI L2 | M SADAMAYAN L1 |
|---|---|---|---|---|---|---|
| 1.00Name of Work:Madurai District Renewal and Black Topping from Thirumangalam – Vagaikulam Road to Melandal Road (R - 70)in Thirumangalam Block | ||||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 2,016 | Sqm | 6.36 ₹12,821.76 | 6.36 ₹12,821.76 | 6.36 ₹12,821.76 |
| 3.00 | Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MoRT&H 301 - 305. | 924 | Cum | 140.45 ₹1.3 L | 80 ₹73,920 | 140.45 ₹1.3 L |
| 4.00 | Providing and Laying US Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | 315 | Cum | 591.02 ₹1.9 L | 380 ₹1.2 L | 591.02 ₹1.9 L |
| 5.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 5,250 | Sqm | 34.64 ₹1.8 L | 15 ₹78,750 | 34.64 ₹1.8 L |
| 6.00 | BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 131.25 | Cum | 10,600 ₹13.9 L | 11,100 ₹14.6 L | 7,300 ₹9.6 L |
| 7.00 | Supply and fixing of KM stone SI No. 44 A | 2 | No | 523.1 ₹1,046.20 | 523.1 ₹1,046.20 | 523.1 ₹1,046.20 |
| 8.00 | Supply and fixing of HM stone SI No.44 A | 5 | No | 266.9 ₹1,334.50 | 266.9 ₹1,334.50 | 266.9 ₹1,334.50 |
| 9.00 | Provision for Equilateral Triangle Cautionary Signboard Charges | 1 | No | 4,999 ₹4,999 | 3,000 ₹3,000 | 4,999 ₹4,999 |
| 10.00 | Provision for Name board | 1 | No | 4,500 ₹4,500 | 500 ₹500 | 4,500 ₹4,500 |
Tender Value
₹25 L
Closing Date
3 Mar 2026, 3:00 pmClosed
BDO(VP)
Thirumangalam Union Office ,Thirumangalam
Madurai District Renewal and Black Topping from Thirumangalam Vagaikulam Road to Melandal Road (R - 70)in Thirumangalam Block
2026_RDTN_668919_1
01-TMM/PONNAMANGALAM-2024-25
Open Tender
Civil Works
120 days
Thirumangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
3 Mar 2026
2 Mar 2026
3 Mar 2026
2 Mar 2026
3 Mar 2026
2 Mar 2026
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers of 250 mm loose thick each , sectioning , watering and compacting etc, complete as per MoRT&H 301 - 305.
Providing and Laying US Gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No.44 A
Provision for Equilateral Triangle Cautionary Signboard Charges
Provision for Name board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.06 MB
BOQ_803727.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid