Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.1 LAccepted-AOC | ₹31.1 L Quoted ₹32.2 L | L1 | Accepted-AOC ok |
| 2 | L2₹35.3 LRejected-Finance NOT SPECIFIED IN THE DOCUMENT | ₹35.3 L | L2 | Rejected-Finance ok |
| 3 | Rejected-Technical HSVP OFFICE COMPLEX SECTOR 13 HISAR | HISAR | HISAR | HARYANA | - | - | Rejected-Technical As per Haryana Government notification No. 480-C-7-2025/4728 dt.27.6.2025 the preference for allotment of tender will be given to the society. Hence the tender is rejected. |
| 4 | Rejected-Technical H NO 5 WARD NO 13 BARWALA 125121 2023R14129 | BARWALA | HISAR | HARYANA | 125121 | - | - | Rejected-Technical Not qualify as per technical |
Tender Value
₹31.6 L
EMD Value
₹64,000
Closing Date
16 Feb 2026, 9:00 amClosed
BHUPENDER SINGH
DIV 1 Hissar
Rough cost Estimate for Dismantling of existing RCC OHSR at Tubewell No. 1 and 6 Urban Estate Jind
2026_HBC_501782_1
2026BE63BB21 5707 4ACB B269 436FE6A30E1D259HSV
Open Tender
Civil Works
180 days
Jind
Providing, laying and compaction of 50mm thick BM, 30mm thick BC with tack coat over base of GSB, WMM, applying thermoplastic paint on road, providing and laying 350mm RCC NP3 pipe and construction of mainhole of SWD line along 12 mtr. road in Sector
2 documents required · 2 mandatory
₹500
Yes
₹64,000
Yes
21 Apr 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
16 Feb 2026
10 Feb 2026
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km]
[30.93]Providing and fixing double scaffolding system (cup lock type) on the exterior side, up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre, horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube Challies, M.S. clamps and M.S. staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after .The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and approval of Engineer-in-charge .The elevational area of the scaffolding shall be measured for payment purpose .The payment will be made once irrespective of duration of scaffolding. [Through Rate]
[5.26]Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. [Through Rate]
stage.html
html • 0.04 MB
techsummary_580426.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_580426.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid