Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹34.8 LAccepted-AOC 131 TAGORE ROAD DURGAMANDIR ASANSOL 713303 | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | 1 | Accepted-AOC Accepted as L1 bidder |
Tender Value
₹38.7 L
EMD Value
₹48,400
Closing Date
18 Mar 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Area Engineer(EnM)
Office of the Area Engineer(EnM)
Supply, Installation and Commissioning of suitable Pit Bottom Buffers at pit no 2 and 3 of JK Unit, Siduli Colliery
2024_ECL_302697_1
GM/KND/AE(ENM)/55(TN)/23-24/30
Open Tender
Miscellaneous Works
Item Rate
120 days
Siduli Colliery
Please refer Tender documents.
5 documents required · 5 mandatory
₹48,400
31 Mar 2024
26 Feb 2024
19 Mar 2024
27 Feb 2024
18 Mar 2024
27 Feb 2024
27 Feb 2024 - 7 Mar 2024
Amount
Item Description/ Heading
Approximate cost of buffer for 2no Pit, JK Unit, Siduli Colliery(Based on CMERI Report)
Hydraulic Buffer Cylinder(excluding testing charges)
Top Cylinder(Excluding testing charges)
Hydraulic Oil
Approximate cost of installation for2no Pit, JK Unit, Siduli Colliery(Based on CMERI Report)
Rubber Kit
Round Plate
Long Plate
ISMB 250X125
Nuts and bolts
Installation Pit Bottom Buffer (including PCC jamming, welding, gas cutting, material fixing, labour charge and other related cost)
Safety equipment
Material Transportation Charges
Pit Cleaning (Temporary platform making if required)
Approximate cost of testing
Drop Testing(As per DGMS(Approval)/PitBottomBuffer/01 dated 20.06.2013) (1 set comprising of 8 cylinders)
Other Testing(As per DGMS(Approval)/PitBottomBuffer/01 dated 20.06.2013) (1 set comprising of 8 cylinders and 08 top buffers)
Approximate cost of buffer for 3no Pit, JK Unit, Siduli Colliery(Based on CMERI Report)
Hydraulic Buffer Cylinder(excluding testing charges)
Top Cylinder(Excluding testing charges)
Hydraulic Oil
Approximate cost of installation for 3no Pit, JK Unit, Siduli Colliery(Based on CMERI Report)
Rubber Kit
Round Plate
Long Plate
ISMB 250X125
Nuts and bolts
Installation Pit Bottom Buffer (including PCC jamming, welding, gas cutting, material fixing, labour charge and other related cost)
Safety equipment
Material Transportation Charges
Pit Cleaning (Temporary platform making if required)
Approximate cost of testing
Drop Testing(As per DGMS(Approval)/PitBottomBuffer/01 dated 20.06.2013) (1 set comprising of 12 cylinders)
Other Testing(As per DGMS(Approval)/PitBottomBuffer/01 dated 20.06.2013) (1 set comprising of 12 cylinders and 08 top buffers)
Total impact of GST for the purpose of CTC
techsummary_313568.pdf
PDF • 0.50 MB
finsummary_313568.pdf
PDF • 0.50 MB
AOCPBB2.pdf
PDF • 0.32 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .