Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹95,573.94Admitted-Fee/PreQual/Technical/Finance | -25.73% | ₹95,573.94 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.0 L+₹5,013.28 (5.25%)Admitted-Fee/PreQual/Technical/Finance | -21.83% | ₹1.0 L+₹5,013.28 (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 L
EMD Value
₹2,572
Closing Date
16 Jul 2026, 6:00 pmClosed
Executive Engineer Flood Control Division Kakapora
Flood Control Division Kakapora HQ Marwal
Construction of F.P work by way of cement concrete lining near orchard of Bushan Lal at village Ladoo
2026_IFC_314189_1
E-NIT No 04 of 2026-27
Open Tender
Civil Works
Percentage
15 days
Pampore
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Chief Engineer Irrigation and flod control
₹2,572
Yes
31 Jul 2026
1 Jul 2026
17 Jul 2026
1 Jul 2026
16 Jul 2026
1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.All kinds of soil : | 88.05 | cum | 187.3 | ₹16,491.77 |
| 2 | Dumping stone excluding cost of stones.
on Horizontal on level | 3.57 | cum | 237.9 | ₹849.3 |
| 3 | supply of Stone boulder (quarry) nominal size 225 mm | 3.57 | cum | 1,175 | ₹4,194.75 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 73.8 | sqm | 286.35 | ₹21,132.63 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level .
1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 13.5 | cum | 5,733.6 | ₹77,403.6 |
| 6 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5m. Deducted watering & ramming i.e Rs @ 37.85 | 16.93 | cum | 180.55 | ₹3,056.71 |
| 7 | Carriage of materials from source to road site by mechanical transport Cement for an avg. 3 km | 2.97 | ton | 147.4 | ₹437.78 |
| 7.1 | Sand for an avg. 10 km | 6.08 | cum | 279.04 | ₹1,696.56 |
| 7.2 | Stone Aggregate 20mm for an avg 3 km | 12.15 | cum | 165.8 | ₹2,014.47 |
| 7.3 | Soling stone for an avg. lead of 8 km | 3.57 | cum | 291.3 | ₹1,039.94 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_1017259.xls
BOQ • 0.25 MB
corrigendum.pdf
PDF • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .