Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Not Admitted-Finance TATARPUR LALU A 2 ADESH NAGAR NAJIBABAD BIJNOR UTTAR PRADESH | NAJIBABAD | BIJNOR | UTTAR PRADESH | - | Not Admitted-Finance Not qualified for AOC | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
Tender Value
Refer Docs
EMD Value
₹14,000
Closing Date
8 Dec 2020, 5:00 pmClosed
EE MGCCD-12ALIGARH
Executive engineer Madhya Ganga Canal Construction Division12 Aligarh
Construction of V.R.B. at Km.6.125 of Nawara Minor in Distt. Sambhal.
2020_UPIDC_533609_14
02/EE/2020-21
Open Tender
Construction Works
Item Wise
Sambhal
Construction of V.R.B. at Km.6.125 of Nawara Minor in Distt. Sambhal.
2 documents required · 2 mandatory
₹854
₹14,000
19 Nov 2022
3 Dec 2020
9 Dec 2020
3 Dec 2020
8 Dec 2020
3 Dec 2020
3 Dec 2020 - 8 Dec 2020
Amount
E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the sise of foundation
Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit foundation including all labour, material T&P etc.
Class - 150 ( Non modular ) brick work in 1:4 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work.
Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc but excluding supply of reinforcement and its bending and including its fixing and binding the same with 24 BWGI binding wire and including necessasary centering and shuttering. required for proper completion of the work in all conditions.
Centering and Shuttering in of R.C.C. work including all labour , T&P, etc.
Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding with 24 BWG binding wire, T&P, taxes etc. required for proper completion of the required work.
Struck Pointing With Cement Mortar Consisting of 1:2 (Cement:Fine Sand of 1.25 Finenes Modulus On Brick Work Including Supply Of all Materials Labour And Completion Of Work.
S/f tar paper bearing over bed block.
Filling expension joint filled with bitumen & coarse sand
S/F of wheel guard stone
S/F of year plate 300x300x25mm
S/F of B.M. plate 150x150x25mm
Earth work in making Ramp and with compaction in 20.00 cm layers and dressing and also including labour T&Petc required for completion of work
Supplying & fixing 75mm.dia streel pipe for rain spout.
Supply and Fixing of M.S. Angle Sign Board 60x90 including cost of material,Taxes, labour T&P etc Complete,But excluding of G.S.T.per Nos.:
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .