Tender Value
₹14.8 L
EMD Value
₹29,517
Closing Date
3 Aug 2023, 3:00 pmClosed
Adminstrative Officer
CIAB, Sector 81 Mohali
Repair of damaged boundary wall at Main Campus, CIAB, Knowledge City, Sector-81, Mohali.
2023_DBTEC_763364_1
CIAB/7(111)/2023- Work
Open Tender
Civil Works
Item Rate
56 days
Mohali
Please refer Tender documents.
2 documents required · 2 mandatory
₹1
Yes
CIAB
₹29,517
Yes
10 Aug 2023
25 Jul 2023
4 Aug 2023
25 Jul 2023
3 Aug 2023
25 Jul 2023
Earth work in excavation by mechanical means(hydraulic excavator)/manual means in foundation, trenches of drains at all levels, depth, lifts etc including dressing of sides and ramming of bottoms lift , including getting out the excavated soil, damaged RCC, damaged brickwork, PCC, reinforcement etc. and disposal of surplus excavated soil as directed, including dewatering etc during excavation within a lead of 500m. All kinds of soil
Supply, laying good earth from outside in tractor trolley only ( As road near filling area/site not bear the load of dummpers/trucks) including the cost of filling in layers not more than 20 cm in depth, ramming, carriage, royalty etc complete as per directions of Engineer-incharge
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level. All works upto plinth level and above at all levels. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), includingattached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement 1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natu ral sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering and shuttering including strutting, propping etc. and removalof form work for Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removalof form work for Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets,kerbs and steps etc.
Charges for dismantling damaged wall i.e. RCC /PCC /Brickwork /Steel etc. for proper joint of new wall and for foundation including shifting of debris near damaged wall to the marked space by Engineer-In-charge. No extra payment will be paid rather than quoted amount
Charges for fixing of existing damaged MS grill with new wall with proper fastners or welding as per site requirement without any cost to CIAB as per direction of Engineer -in chrage.
12 mm cement plaster of mix : 1:4 (1 cement: 4 fine sand)
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in Cement mortar 1:4 (1 cement : 4 coarse sand)
Providing & laying in position cement concrete of specified grade excluding the cost of centering and shuttering –All work upto plinth level. 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering as directed by Engineer-incharge. All kinds of soil
A TECH BUILDERS
SUKHJIT SINGH CONTRACTOR
CIS GLOBAL INFRATECH PVT LTD
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .