| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | ₹9.7 L | L1 | Accepted-AOC Found lowest one bidder |
| 2 | L2₹9.9 L+₹24,871 (2.56%)Rejected-AOC | ₹9.9 L+₹24,871 (2.56%) | L2 | Rejected-AOC Quoted high rate as compared to L1 |
| 3 | Rejected-Technical PHYANG | - | - | Rejected-Technical class of contractor contradicts as per NIT |
| 4 | Rejected-Technical | - | - | Rejected-Technical class of contractor contradicts as per NIT |
Tender Value
₹10 L
Closing Date
19 Sept 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Completion of community guest room at Shara
2022_RDD_7607_17
NIT - 27 - UTL REWL OF 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
10 Apr 2023
12 Sept 2022
21 Sept 2022
12 Sept 2022
19 Sept 2022
12 Sept 2022
Amount
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering, fmishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo Mechanically Treated Bars.
Centring and shuttering including strutting, propping etc. and removal of form for· Columns, piers, abutments, pillars, posts and struts.
Centring and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform.
Centring and shuttering including strutting, propping etc. and removal of form for: lintels, beam plinth beams etc
Centring and shuttering including strutting, propping etc. and removal of form for: Edge wall below 20 cm wide
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately): Second class kail wood
Carriage of cement and steel from an average lead up to 40 Km by Mechanical Transport. Qty Vide Comsumption Table. And reinforcement item.
Carriage of sand and coarse aggregates from an average lead up to 10 Km by Mechanical Transport.
M/S TASHI LOTUS GOVT CONTARCTOR
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .