| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 CrAccepted-AOC | ₹7.0 Cr | L1 | Accepted-AOC Awarded |
| 2 | L2₹7.4 Cr+₹34.9 L (4.98%)Rejected-Finance | ₹7.4 Cr+₹34.9 L (4.98%) | L2 | Rejected-Finance Higher rates |
| 3 | L3₹7.6 Cr+₹57.5 L (8.21%)Rejected-Finance 70 INDUSTRIAL AREA PHASE 1 PANCHKULA PANCHKULA HARYANA 134109 | PANCHKULA | HARYANA | 134109 | ₹7.6 Cr+₹57.5 L (8.21%) | L3 | Rejected-Finance Higher rates |
| Sl No | Description | Qty | Unit | Eco Paryavaran Engineers And Consultants Pvt. Ltd. L2 | N R ENGINEERS L1 | S.R.Paryavaran Engineers Pvt Ltd L3 |
|---|---|---|---|---|---|---|
| 1.00 | Design, Construction, Installation, commissioning of 1 MLD STP at IFP Abohar based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) & other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 36 months after stabilization period of 3 months or more. | 1 | Job | 3,35,00,000 ₹3,35,00,000 | 3,28,00,000 ₹3,28,00,000 Lowest | 3,54,84,000 ₹3,54,84,000 |
| 1.01 | Credit for sludge | 1 | LS | 5,000 ₹-5,000 Lowest | - | - |
| 1.02Guaranteed Power Consumption for Defect Liability Period of 1 (one year) and 2 years of O&M to be quoted by the bidder per year by the bidder in KVAh. | ||||||
| 1.03 | For 1st year i.e. Defect Liability Period | 1 | KVAh | 350 ₹10,85,875 | 250 ₹7,75,625 Lowest | 540 ₹16,75,350 |
| 1.04 | For 2nd year (O & M) | 1 | KVAh | 350 ₹10,85,875 | 255 ₹7,91,137.5 Lowest | 540 ₹16,75,350 |
| 1.05 | For 3rd year (O & M) | 1 | KVAh | 350 ₹10,85,875 | 260 ₹8,06,650 Lowest | 540 ₹16,75,350 |
| 1.06 | Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 2000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder) | 1 | Lumpsum | 16,00,000 ₹16,00,000 | 11,00,000 ₹11,00,000 Lowest | 30,00,000 ₹30,00,000 |
| 2.00 | Design, Construction, Installation, commissioning of 1 MLD STP at MIGC Malout based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) & other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 36 months after stabilization period of 3 months or more. | 1 | Job | 3,35,00,000 ₹3,35,00,000 | 3,28,00,000 ₹3,28,00,000 Lowest | 3,54,84,000 ₹3,54,84,000 |
| 2.01 | Credit for sludge | 1 | LS | 5,000 ₹-5,000 Lowest | - | - |
| 2.02Guaranteed Power Consumption for Defect Liability Period of 1 (one year) and 2 years of O&M to be quoted by the bidder for per year by the bidder in KVAh. | ||||||
Tender Value
Refer Docs
EMD Value
₹15 L
Closing Date
3 Sept 2025, 11:00 amClosed
XEN 3
PSIEC Chandigarh
Construction of 1 MLD STP at MIGC Malout and 1 MLD STP at IFP Abohar
2025_IC_147515_1
PSIEC/STP/Abohar and Malout
Open Tender
Miscellaneous Works
Lump-sum
365 days
IFP Abohar and Malout
Please refer Tender documents.
2 documents required · 2 mandatory
₹35,400
₹15 L
Chandigarh
3 Feb 2026
14 Aug 2025
4 Sept 2025
14 Aug 2025
3 Sept 2025
14 Aug 2025
21 Aug 2025
Amount
Design, Construction, Installation, commissioning of 1 MLD STP at IFP Abohar based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) & other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 36 months after stabilization period of 3 months or more.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one year) and 2 years of O&M to be quoted by the bidder per year by the bidder in KVAh.
For 1st year i.e. Defect Liability Period
For 2nd year (O & M)
For 3rd year (O & M)
Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 2000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder)
Design, Construction, Installation, commissioning of 1 MLD STP at MIGC Malout based on any suitable, sustainable and proven technology (MBBR/MBR/SBR) & other appurtenant works on turnkey basis as per DNIT including Operation & Maintenance for a period of 36 months after stabilization period of 3 months or more.
Credit for sludge
Guaranteed Power Consumption for Defect Liability Period of 1 (one year) and 2 years of O&M to be quoted by the bidder for per year by the bidder in KVAh.
For 1st year i.e. Defect Liability Period
For 2nd year (O & M)
For 3rd year (O & M)
Cost of the area required for setting up of STP in sq. yard (i.e. Rs. 3000/ sq.yrd x Area required in sq. yrd (to be informed by the bidder))
Construction of RCC Raw Sewer water Collection Tanks 2 Nos (Size dia 4.80 mtr depth 9.15 mtr) Earthfilling in disposal area approx. 1 acre depth 0.75 mtr
Eco Paryavaran Engineers And Consultants Pvt. Ltd. (BID ID -678284)
S.R.Paryavaran Engineers Pvt Ltd (BID ID -678415)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
DNIT2.pdf
Tender Documents • 8.95 MB
BOQ_298568.xls
BOQ • 0.28 MB
DNIT.pdf
Tender Documents • 5.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .