Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹17.7 LAdmitted-Fee/PreQual/Technical/Finance | -38.99% | ₹17.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹18.8 L+₹1.1 L (5.97%)Admitted-Fee/PreQual/Technical/Finance | -35.35% | ₹18.8 L+₹1.1 L (5.97%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹19.3 L+₹1.6 L (9.28%)Admitted-Fee/PreQual/Technical/Finance | -33.33% | ₹19.3 L+₹1.6 L (9.28%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹22.9 L+₹5.2 L (29.5%)Admitted-Fee/PreQual/Technical/Finance | -21.00% | ₹22.9 L+₹5.2 L (29.5%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.0 L
EMD Value
₹58,500
Closing Date
4 Jun 2026, 3:00 pmClosed
Chief Engineer
6 Strand Road, Kolkata 700001
PETTY PLUMBING AND SANITARY WORKS OF INSIDE AND OUTSIDE AREAS UNDER NSD ALONG WITH CLEANING AND DISINFECTION OF WATERTANKS UNDER NSD FOR ONE YEAR FROM THE DATE OF WORK ORDER.
2026_KoPT_908535_1
SMPA/KDS/CIV/T/3045/22
Open Tender
Civil Works
Percentage
365 days
Various locations under SE NSD
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,770
Yes
SMPA
₹58,500
Yes
8 Jun 2026
13 May 2026
5 Jun 2026
13 May 2026
4 Jun 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbow, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete in all respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made separately.)-FOR EXPOSED WORK-Medium quality G.I. Pipes. 15 mm. dia Medium quality | 150 | Mtr. | 192 | ₹28,800 |
| 1.1 | 20mm. dia Medium quality | 80 | Mtr. | 226 | ₹18,080 |
| 1.2 | 25mm. dia Medium quality | - | Mtr. | 305 | - |
| 1.3 | 40mm. dia Medium quality | 70 | Mtr. | 415 | ₹29,050 |
| 1.4 | 50mm. dia Medium quality | - | Mtr. | 540 | - |
| 1.5 | 80mm. dia Medium quality | - | Mtr. | 818 | - |
| 2 | Supplying, fitting and fixing in position G. I. pipes of TATA make for underground works with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbow, nipple, short piece etc. including cost of all materials, jointing materials, cutting pipes, making threads, cutting trenches up to 1.5 metre below surface in all sorts of soil and refilling the same as directed with two coats of painting on G.I. pipes and specials with bituminous paint complete in all respect. (Payment will be made on the centre line measurement of the total pipe line including all specials. No separate payment will be made for accessories, specials. Payment for painting will be made separately.) 15 mm. dia Medium quality | - | Mtr. | 214 | - |
| 2.1 | 20mm. dia Medium quality | - | Mtr. | 240 | - |
| 2.2 | 25mm. dia Medium quality | - | Mtr. | 319 | - |
| 2.3 | 40mm. dia Medium quality | 50 | Mtr. | 400 | ₹20,000 |
stage.html
html • 0.02 MB
finance_954886.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.95 MB
3045.pdf
Tender Documents • 2.93 MB
BOQ_954886.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .