Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹74.0 L
EMD Value
₹74,100
Closing Date
19 Mar 2020, 5:00 pmClosed
XEN
PHE Division Doda
Providing Laying and Fitting of G.I/HDPE pipes for various habitations of WSS Ludna under State Share NRDWP.
2020_PHE_95120_4
EE/PHED/D/23 of 03/2020
Open Tender
Civil Works
Item Rate
60 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
XEN
₹74,100
Yes
4 May 2020
14 Mar 2020
20 Mar 2020
14 Mar 2020
19 Mar 2020
14 Mar 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (Not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge disposed earth is to be leveled and neatly dressed in all kind of soil 70% and ordinary rock 30%.
Providing and Fixing G.I/HDPE Pipes complete with G.I Fittings excluding trenches and refilling etc. (external work). G.I. Pipes 20mmØ
G.I. Pipes 25mmØ
G.I. Pipes 32mmØ
G.I. Pipes 40mmØ
G.I. Pipes 50mmØ
HDPE Pipes 63mmØ
HDPE Pipes 50mmØ
HDPE Pipes 40mmØ
HDPE Pipes 32mmØ
HDPE Pipes 25mmØ
Providing and fixing G.I. Union in G.I. pipe including cutting and threading the pipe and making long screws etc. Complete (new work) G.I. Pipes 20mmØ
G.I. Pipes 25mmØ
G.I. Pipes 32mmØ
G.I. Pipes 40mmØ
G.I. Pipes 50mmØ
Filling of available excavated earth in trenches, plinth, and side of foundation etc. lead up to 50mtr lift up to 1.5mtr.
Carriage of G.I pipes from Divisional store Doda to road side average distance of 38.00 Km by mechanical transport
Carriage of HDPE pipes from Divisional store Doda to road side average distance of 38.00 Km by mechanical transport
Carriage of G.I pipes from road side to site of work average distance of 4.00 Km by H/Load.
Carriage of HDPE pipes from road side to site of work average distance of 4.00 Km by H/Load.
UNIVERSAL GROUP OF ENGINEERS
M/s Joint Engineering Company
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .