| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.9 LAccepted-AOC | ₹7.9 L | 1 | Accepted-AOC 1 |
| 2 | 2₹8.0 L+₹1,000 (0.13%)Rejected-Finance | ₹8.0 L+₹1,000 (0.13%) | 2 | Rejected-Finance Admitted |
| 3 | 3₹8.0 L+₹977 (0.12%)Rejected-Finance | ₹8.0 L+₹977 (0.12%) | 3 | Rejected-Finance Admitted |
| 4 | 4₹8.2 L+₹21,937 (2.76%)Rejected-Finance | ₹8.2 L+₹21,937 (2.76%) | 4 | Rejected-Finance Admitted |
Tender Value
₹8.0 L
EMD Value
₹8,040
Closing Date
1 Aug 2024, 3:00 pmClosed
The Block Development Officer (vP), Karimangalam
The Block Development Officer (vP), Karimangalam
Can be seen in the tender documents
2024_RDTN_467072_1
Roc.No. 2287/2024/E2 dt.24.07.2024-P02
Open Tender
Civil Works
Item Rate
120 days
The Block Development Office, Karimangalam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,040
13 Sept 2024
27 Jul 2024
1 Aug 2024
27 Jul 2024
1 Aug 2024
27 Jul 2024
Amount
Construction of New OHT 10000Lit Chinnamatlampatti H/o Baisuhalli
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B for First depth of 2m,For foundation and For GL Brace
Second depth of 1m
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete as directed by TWAD Board officers.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers.
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Board officers.
For items 1.5m to 4.5m below GL for FOOTING for Rectangular Portion and Trapenzoidal Portion
For items 0m to 4.5m above GL Columns Brace at 3.375 m ht.
For items 4.51m to 7.32m above GL Columns Brace at 6.375 m ht.
For items 7.32m to 10.98 m above Column up to 9.30 m ht. For Beam at 7.00 m ht. above GL For floor slab at 7.2 m above GL
For items above 7.32 m & up to 10.98 m from GL side wallFor haunches from 5.70m to 6.03m
For Roof Slab 10.93m to 11.08m Deduction for manhole cover For GI Ventilating arrangements
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. Plant Surfaces Below G.L & upto 32.30m ht for footing sides for GL Brace Bottom for Brace sides inner , for GL Brace sided Outer Roof slab bottom deduct for Manhole deduct for sidewall junction ADD Sides of Manhole
For GL Brace bottom For GL Brace sides innerFor GL Brace sides outer
Grid beam inside Grid beam outside Grid beam bottom Bottom of floor slab Deduction for Floor beam junction
Curved Surface for 0 to 3.30m, Floor slab sides, Side wall outer, Side wall inner, Haunch (slanting) ,Sides of roof slab
Square column ,Below G.L. ,Ground level to 3.30 m,D/F Brace
3.30 to 4.30m ,D/F Brace
,6.31 to 7.30m ,D/F Brace
for Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers 1.For column 2.Brace at 2.775m above G.L. 3.Floor beam outer face 4.Inner face 5.Bottom 6.Floor slab bottom 7.Floor slab sides 8.Floor slab top offset 9.Side wall outer 10.Roof slab sides 11.Deduct column & Brace junction 12.Floor beam junction with floor slab 13.Add Roof slab Bottom projection
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers. Up to16 mm dia and above 16 mm dia rods
FabricatFabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out Fabrication, supply, delivery and fixing of outside MS ladder of 45cm wide made out of 50x50x6mm MS angle for sides and steps in 16mm MS plain rods fixed at 30cm centre to centre welded, jointed etc., providing with suitable side supports, clamps, and locking arrangements provided with one coat of red oxide paint for providing access to roof top of 10,000 lit. capacity OHT of suitable inclined length, including bottom anchorage and transportation and as directed by TWAD Board officers.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete and as directed by TWAD Board officers. (Vide seperate Sheet)
Providing GI ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers
Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by TWAD Board officers.
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total .
Providing GI pipe connection to the OHT
PIPELINE Works Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Supply of 50mm HDPE including cost and conveyance of all materials to site and all labour charges etc., completed.
Labour charges for laying and joining 40mm HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete.
Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete.
Provsion for Name Board.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SRI VAISHNAVI TRADERS (BID ID -1098631)
SETTU BOOTHAL CONTRACT WORKS (BID ID -1098578)
RAVISHANKAR.P (BID ID -1098637)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .