Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 LAccepted-AOC VILLAGE KOJINDA POST OFFICE MANDHANA TEHSIL NARNAUL DISTRICT MOHINDERGARH HARYANA 123001 | NARNAUL | MOHINDERGARH | HARYANA | 123001 | ₹4.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.4 L+₹1,430 (0.32%)Rejected-Finance OPP CIVIL ROAD ROHTAK | ROHTAK | HARYANA | 124001 | ₹4.4 L+₹1,430 (0.32%) | L2 | Rejected-Finance L2 |
| 3 | L3₹5.2 L+₹81,395 (18.4%)Rejected-Finance 1350 B SHYAM LAL BAGH NEAR NAND CINEMA HISAR 125001 | HISAR | HARYANA | 125001 | ₹5.2 L+₹81,395 (18.4%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | pawan Kumar L3 | Mange Ram L1 | ASHOKA ELECTRICALS L2 |
|---|---|---|---|---|---|---|
| 1.01 | Supply of MCCB 3phase complete the job in all respect up to the Engineer-in-Charge of the work. MCCB 63A 3 phase make Schneider/Havells/Siemens | 4 | Each | 7,000 ₹28,000 | 5,000 ₹20,000 | 2,600 ₹10,400 Lowest |
| 1.02 | Supply of MCCB 3phase complete the job in all respect up to the Engineer-in-Charge of the work. MCCB 100A 3 phase make Siemens/Havells/Schneider | 4 | Each | 7,100 ₹28,400 | 5,000 ₹20,000 | 3,600 ₹14,400 Lowest |
| 1.03 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of SP MCB 6-32A Make LandT/Siemens/ABB | 151 | Each | 180 ₹27,180 | 140 ₹21,140 | 120 ₹18,120 Lowest |
| 1.04 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of SPN MCB 32A Make LandT/Siemens/ABB | 11 | Each | 500 ₹5,500 | 400 ₹4,400 Lowest | 450 ₹4,950 |
| 1.05 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of TPN MCB 63A Make LandT/Siemens/ABB | 25 | Each | 1,700 ₹42,500 | 1,300 ₹32,500 Lowest | 1,580 ₹39,500 |
| 1.06 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of TPN MCB 32A Make LandT/Siemens/ABB | 5 | Each | 1,500 ₹7,500 | 1,100 ₹5,500 Lowest | 1,290 ₹6,450 |
| 1.07 | Supply of PVC tape roll complete the job in all respect up to the Engineer-in-Charge of the work. Make Make Steel grip | 120 | Each | 8 ₹960 | 7 ₹840 Lowest | 10 ₹1,200 |
| 1.08 | Supply of Capacitor 2.5 mfd complete the job in all respect up to the Engineer-in-Charge of the work. | 60 | Each | 50 ₹3,000 | 40 ₹2,400 | 25 ₹1,500 Lowest |
| 1.09 | Supply of Capacitor 3.15 mfd complete the job in all respect up to the Engineer-in-Charge of the work. | 30 | Each | 60 ₹1,800 | 40 ₹1,200 | 30 ₹900 Lowest |
| 1.10 | Supply PVC Gang Box complete the job in all respect up to the Engineer-in-Charge of the work. Gang box 1 plus 1 | 30 | Each | 25 ₹750 Lowest | 50 ₹1,500 | 25 ₹750 Lowest |
Tender Value
₹4.2 L
EMD Value
₹8,453
Closing Date
22 Jun 2026, 5:00 pmClosed
RAVI Ladwal
ED - Rewari
Annual Repair Mtc. of E.I. for Govt. Ayurvedic College/Hospital at village Patikara (Narnaul) for the year 2024-25 (Ayurvedic building) (Pdg. day to day maintenance materials)
2026_HRY_529511_1
202673BF653A 58D7 4D18 B89B 53CD4458D46B668BAR
Open Tender
Civil Works
Works
25 days
Narnaul
2 documents required · 2 mandatory
₹500
₹8,453
Yes
24 Jul 2026
16 Jun 2026
23 Jun 2026
16 Jun 2026
22 Jun 2026
16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Supply of MCCB 3phase complete the job in all respect up to the Engineer-in-Charge of the work. MCCB 63A 3 phase make Schneider/Havells/Siemens | 4 | Each | 1 | ₹4 |
| 1.02 | Supply of MCCB 3phase complete the job in all respect up to the Engineer-in-Charge of the work. MCCB 100A 3 phase make Siemens/Havells/Schneider | 4 | Each | 2 | ₹8 |
| 1.03 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of SP MCB 6-32A Make LandT/Siemens/ABB | 151 | Each | 3 | ₹453 |
| 1.04 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of SPN MCB 32A Make LandT/Siemens/ABB | 11 | Each | 4 | ₹44 |
| 1.05 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of TPN MCB 63A Make LandT/Siemens/ABB | 25 | Each | 5 | ₹125 |
| 1.06 | Supply MCB complete the job in all respect up to the Engineer-in-Charge of the work. Supply of TPN MCB 32A Make LandT/Siemens/ABB | 5 | Each | 6 | ₹30 |
| 1.07 | Supply of PVC tape roll complete the job in all respect up to the Engineer-in-Charge of the work. Make Make Steel grip | 120 | Each | 7 | ₹840 |
| 1.08 | Supply of Capacitor 2.5 mfd complete the job in all respect up to the Engineer-in-Charge of the work. | 60 | Each | 8 | ₹480 |
| 1.09 | Supply of Capacitor 3.15 mfd complete the job in all respect up to the Engineer-in-Charge of the work. | 30 | Each | 9 | ₹270 |
| 1.1 | Supply PVC Gang Box complete the job in all respect up to the Engineer-in-Charge of the work. Gang box 1 plus 1 | 30 | Each | 10 | ₹300 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
BOQ_608541.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .