Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance 809A ANSAL KIRTI SIKHAR BUILDING JANAKPURI WEST DISTRICT CENTRE WEST DELHI DELHI 110058 | WEST DELHI | DELHI | 110058 | L1 | Admitted-Finance | |
| 2 | L2₹18.5 L+₹3.4 L (22.2%)Admitted-Finance 260 DEFENCE COLONY FLYOVER MARKET NEW DELHI NEW DELHI 110024 SOUTH DELHI DELHI 110024 | SOUTH EAST DELHI | DELHI | 110024 | L2 | Admitted-Finance | |
| 3 | L3₹19.6 L+₹4.4 L (28.9%)Admitted-Finance 3 4 JEEVAN DEEP BUILDING 10 PARLIAMENT STREET NEW DELHI 1 PH 011 43573493 9899713006 | L3 | Admitted-Finance | |
| 4 | L4₹22.7 L+₹7.5 L (49.5%)Admitted-Finance 2 44 A 4 KALU SARAI HAUZ KHAS DELHI SOUTH WEST DELHI DELHI 110016 | SOUTH DELHI | DELHI | 110016 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Not Qualified |
| Sl No | Description | Qty | Unit | SONA COOLING TOWERS L1 | SWASTIK ELECTROTECH PVT LTD L4 | snowmex engineers ltd L3 | COMFORT SYSTEMS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Supply, Installation, testing and commissioning of Induced Draft counter flow cooling Towers (CTI approved). The Cooling Tower shall be of Fiber Reinforced Plastic (FRP) Construction. The casing, basin/sump, fan deck and fan cylinder shall be of FRP, with direct driven fans, Galvanized hardware complete with sump and drain connection with suitable valve, PVC Honey comb fill, louvres, drift eliminator complete with spray nozzle having self-rotating sprinklers, steel ladder, Isolating switch and other accessories to make it fully operational and maintenance National Accreditation Board for Testing and Calibration Laboratories (NABL) & positioning of cooling tower on ground on MS structure with Propeller Type Fan, weather proof IP 55 and Direct driven. The fan motor shall be premium efficiency IE3 class, as per IS 12615. The Cooling tower shall be capable to communicate effectively with Building Management System (BMS). Range of CT: 6 deg C. Designed Duty Conditions :- EWT, LWT, D/WBT Complete as per CPWD specification / drawings and as directed by Engineer-in-charge. (Note - Cooling tower size depends on the ambient temperature conditions, contractor must check the required design temperature). | |||||||
| 1.01 | 1500 GPM | 1 | Each | 10,30,000 ₹10,30,000 Lowest | 15,37,247.52 ₹15,37,247.52 | 15,21,450 ₹15,21,450 | 12,51,500 ₹12,51,500 |
| 2.00Fabricating, Providing and fixing M.S. iron frame fabricated with M.S. C-channel and leg of following sizes for resting the Cooling Tower on the ground duly supported from the bottom as required including painting and grouting the framework with cylindrical shape leg made of hard Iron with welding works etc. complete as required. (Acceptable make of angle: SAIL / Jindal / TATA / Prakash / Nezone) | |||||||
| 2.10 | 200 mm x 100 mm x 6 mm (thick) size for cooling tower 1500 GPM base frame | 30 | Metre | 39,000 ₹39,000 Lowest | 99,000 ₹99,000 | 60,000 ₹60,000 | 47,250 ₹47,250 |
| 2.20 | 200 mm x 100 mm x 6 mm (thick) size MS Leg for 1500 GPM Cooling Tower | 35 | Metre | 45,500 ₹45,500 | 1,15,500 ₹1,15,500 | 17,500 ₹17,500 Lowest | 55,125 ₹55,125 |
| 3.00 | Providing and laying in position cement concrete 1:3:6 (1 cement : 2 coarse sand : 6 graded stone aggregate 40 mm nominal size) in foundation of cooling Tower and tank etc as required. | 2 | cum | 10,760 ₹10,760 | 15,000 ₹15,000 | 5,000 ₹5,000 Lowest | 13,000 ₹13,000 |
| 4.00Providing and fixing of following type of water storage tank of reputed make at ground level made of Resin-lsopthalic unsaturated polyester resin conforming to BS3532 duly processed through SMC hot pressed compression moulding with tank structural support made of hot dipped galvanized steel, including painting of base structure etc. as required as per following capacity. (Same as existing) | |||||||
| 4.10 | Rectangle Type GRP Tank | 20,000 | Litre | 3,00,000 ₹3,00,000 Lowest | 3,90,000 ₹3,90,000 | 3,20,000 ₹3,20,000 | 3,60,000 ₹3,60,000 |
| 5.00Supplying, fixing, testing and commissioning of following valves, for condenser water circulation as per specifications. (Acceptable make - zoloto/ AM/ Leader/ Sant) | |||||||
| 5.10 | Float Valve 50 mm bronze type | 3 | Each | 3,930 ₹3,930 | 17,274.96 ₹17,274.96 | 1,950 ₹1,950 Lowest | 4,725 ₹4,725 |
Tender Value
₹20.6 L
EMD Value
₹41,222
Closing Date
19 Nov 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Assistant Executive Engineer-in-charge, AC Division, Works Department, IIT Delhi, Hauz Khas, New Delhi 110016
Replacement of defective Cooling Tower in LHC Building, IIT Delhi
2025_IIT_885199_1
Replacement of defective Cooling Tower in LHC Building, IIT Delhi
Open Tender
Electrical Works
Works
45 days
IIT Delhi Hauz Khas
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹41,222
3 Dec 2025
12 Nov 2025
20 Nov 2025
12 Nov 2025
19 Nov 2025
12 Nov 2025
Supply, Installation, testing and commissioning of Induced Draft counter flow cooling Towers (CTI approved). The Cooling Tower shall be of Fiber Reinforced Plastic (FRP) Construction. The casing, basin/sump, fan deck and fan cylinder shall be of FRP, with direct driven fans, Galvanized hardware complete with sump and drain connection with suitable valve, PVC Honey comb fill, louvres, drift eliminator complete with spray nozzle having self-rotating sprinklers, steel ladder, Isolating switch and other accessories to make it fully operational and maintenance National Accreditation Board for Testing and Calibration Laboratories (NABL) & positioning of cooling tower on ground on MS structure with Propeller Type Fan, weather proof IP 55 and Direct driven. The fan motor shall be premium efficiency IE3 class, as per IS 12615. The Cooling tower shall be capable to communicate effectively with Building Management System (BMS). Range of CT: 6 deg C. Designed Duty Conditions :- EWT, LWT, D/WBT Complete as per CPWD specification / drawings and as directed by Engineer-in-charge. (Note - Cooling tower size depends on the ambient temperature conditions, contractor must check the required design temperature).
Fabricating, Providing and fixing M.S. iron frame fabricated with M.S. C-channel and leg of following sizes for resting the Cooling Tower on the ground duly supported from the bottom as required including painting and grouting the framework with cylindrical shape leg made of hard Iron with welding works etc. complete as required. (Acceptable make of angle: SAIL / Jindal / TATA / Prakash / Nezone)
200 mm x 100 mm x 6 mm (thick) size for cooling tower 1500 GPM base frame
200 mm x 100 mm x 6 mm (thick) size MS Leg for 1500 GPM Cooling Tower
Providing and laying in position cement concrete 1:3:6 (1 cement : 2 coarse sand : 6 graded stone aggregate 40 mm nominal size) in foundation of cooling Tower and tank etc as required.
Providing and fixing of following type of water storage tank of reputed make at ground level made of Resin-lsopthalic unsaturated polyester resin conforming to BS3532 duly processed through SMC hot pressed compression moulding with tank structural support made of hot dipped galvanized steel, including painting of base structure etc. as required as per following capacity. (Same as existing)
Rectangle Type GRP Tank
Supplying, fixing, testing and commissioning of following valves, for condenser water circulation as per specifications. (Acceptable make - zoloto/ AM/ Leader/ Sant)
Float Valve 50 mm bronze type
Gate Valve 50 mm bronze type
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply and all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in Charge. (Acceptable make: Astral / AKG / Finolex / Prakash / Supreme / Prince)
CPVC Pipe 50 mm (For connection from Makeup Tank to Cooling Towers)
Providing and Painting with black anticorrosive painting of approved brand and manufacture on MS Pipes and MS supports of 3 x 300 TR Chiller Plant's cooling towers, connecting pipes after cleaning of surface, removal of all rust and dirt to make the surface completely waterproof, etc. complete as required.
Dismantling of exisitng cooling tower & GRP Storage Tank with foundation, valves, etc from its existing position and removing and site cleaning for new equipment installation as directed by Engineer-in charge.
(-) Less buy back of dismantle Water Storage Tank, Cooling Tower, pipe with accessories etc. (excluding Motor and Blade) (Reserve Price is Rs.55,000.00; Bidder can't quote below Rs.55,000.00)
COMFORT SYSTEMS (BID ID -3319121)
snowmex engineers ltd (BID ID -3318671)
SWASTIK ELECTROTECH PVT LTD (BID ID -3318643)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_930422.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .