Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.3 CrAccepted-AOC DALTONGANJ JHARKHAND | DALTONGANJ | PALAMU | JHARKHAND | L1 | Accepted-AOC L1 Letter No. 140(S)WE Date-12.01.2023 | |
| 2 | L2₹53.8 Cr+₹3.5 Cr (6.90%)Rejected-Finance 614 HARIOM TOWER COMMERCIAL COMPLEX CIRCULAR ROAD LALPUR RANCHI 834 001 | L2 | Rejected-Finance L2 Letter No. 140(S)WE Date-12.01.2023 | |
| 3 | Not Admitted-Fee/PreQual/Technical 3D VATIKA APARTMENT LINE TANK ROAD RANCHI JHARKHAND | RANCHI | RANCHI | JHARKHAND | 834001 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | MINI CONSTRUCTION L1 | RAJBIR CONSTRUCTION PVT. LTD. L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing and grubbing road land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) RCD SOR - 2.03 (i)A | 15.38 | hect. | 90,000 ₹13,84,110 | 50,000 ₹7,68,950 Lowest |
| 2.00 | Cutting of trees, including cutting of trunks, branches and removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.) (i) Girth from 300 mm to 600 mm RCD SOR - 2.01 (A+B) | 88 | No | 300 ₹26,400 | 250 ₹22,000 Lowest |
| 3.00 | Cutting of trees, including cutting of trunks, branches and removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.) (ii) Girth from 600 mm to 900 mm RCD SOR - 2.01 (A+B) | 44 | No | 600 ₹26,400 | 500 ₹22,000 Lowest |
| 4.00 | Cutting of trees, including cutting of trunks, branches and removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.) (iii) Girth from 900 mm to 1800 mm RCD SOR - 2.01 (A+B) | 54 | No | 900 ₹48,600 Lowest | 1,200 ₹64,800 |
| 5.00 | Dismantling of Structure (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.) (i) B Cement Concrete Grade M-15 & M-20 RCD SOR - 2.04 (i) B | 75 | m3 | 475 ₹35,625 | 350 ₹26,250 Lowest |
| 6.00 | Dismantling of Structure (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.) (ii) (A) Dismantling Brick /Tille Work in Cement mortar RCD SOR - 2.04 (ii)B | 258.1 | M3 | 300 ₹77,430 Lowest | 300 ₹77,430 Lowest |
| 7.00 | Dismantling of Structure (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.) (iii) (B) Stone Masonry Structures in Cement mortar RCD SOR - 2.04 (iii) B | 827.63 | M3 | 300 ₹2,48,289 Lowest | 350 ₹2,89,670.5 |
| 8.00 | Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. (a) up to 600mmdia RCD SOR - 2.04 (ix) A | 17.5 | M | 725 ₹12,687.5 | 300 ₹5,250 Lowest |
| 9.00 | Scarifying existing bituminous surface to a depth of 50mm by mechanical means (Scarifying existing bituminous surface to a depth of 50mm and disposal of scarified material with in all lifts and lead upto 1000 m by Mechanical means (3.15)) RCD SOR - 3.15 | 51,262.5 | m2 | 5 ₹2,56,312.5 Lowest | 30 ₹15,37,875 |
| 10.00 | Dismantling of kilometre stone (Dismantling of kilometre stone including cutting of earth , foundation and disposal of dismantled material with all lifts and lead up to 1000 metres and back filling of pit) (A) 5th KM stone RCD SOR - 2.10 A | 2 | no | 349.73 ₹699.46 | 150 ₹300 Lowest |
Tender Value
₹48.0 Cr
EMD Value
₹48.0 L
Closing Date
7 Dec 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
Reconstruction/Widening and Strengthening of Gobra More Nayadih (on Gobindpur-Sahebganj Road) to Shikarpur (on MDR-193) Road (Total Length-15.58 Km) for the year 2022-23
2022_CECOM_63335_1
RCD/DUMKA/2320
Open Tender
Civil Works
Item Rate
365 days
DUMKA
AS PER SBD
3 documents required · 3 mandatory
₹10,000
EXECUTIVE ENGINEER RCD ROAD DIVISION DUMKA
₹48.0 L
CE COMM RCD JHARKHAND RANCHI
19 Jan 2023
24 Nov 2022
9 Dec 2022
24 Nov 2022
7 Dec 2022
30 Nov 2022
29 Nov 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.) RCD SOR - 2.03 (i)A | 15.38 | hect. | - | - |
| 2 | Cutting of trees, including cutting of trunks, branches and removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.) (i) Girth from 300 mm to 600 mm RCD SOR - 2.01 (A+B) | 88 | No | - | - |
| 3 | Cutting of trees, including cutting of trunks, branches and removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.) (ii) Girth from 600 mm to 900 mm RCD SOR - 2.01 (A+B) | 44 | No | - | - |
| 4 | Cutting of trees, including cutting of trunks, branches and removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 metres and earth filling in the depression / pit.) (iii) Girth from 900 mm to 1800 mm RCD SOR - 2.01 (A+B) | 54 | No | - | - |
| 5 | Dismantling of Structure (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.) (i) B Cement Concrete Grade M-15 & M-20 RCD SOR - 2.04 (i) B | 75 | m3 | - | - |
| 6 | Dismantling of Structure (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.) (ii) (A) Dismantling Brick /Tille Work in Cement mortar RCD SOR - 2.04 (ii)B | 258.1 | M3 | - | - |
| 7 | Dismantling of Structure (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.) (iii) (B) Stone Masonry Structures in Cement mortar RCD SOR - 2.04 (iii) B | 827.63 | M3 | - | - |
| 8 | Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works. (a) up to 600mmdia RCD SOR - 2.04 (ix) A | 17.5 | M | - | - |
| 9 | Scarifying existing bituminous surface to a depth of 50mm by mechanical means (Scarifying existing bituminous surface to a depth of 50mm and disposal of scarified material with in all lifts and lead upto 1000 m by Mechanical means (3.15)) RCD SOR - 3.15 | 51,262.5 | m2 | - | - |
| 10 | Dismantling of kilometre stone (Dismantling of kilometre stone including cutting of earth , foundation and disposal of dismantled material with all lifts and lead up to 1000 metres and back filling of pit) (A) 5th KM stone RCD SOR - 2.10 A | 2 | no | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_85071.xls
BOQ Document • 0.31 MB
109513929.pdf
Tender Document • 0.39 MB
SBD.pdf
Tender Document • 1.64 MB
109513934.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .