| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.1 CrAccepted-AOC | ₹19.1 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹19.5 CrRejected-Finance | ₹19.5 Cr | L2 | Rejected-Finance L2 Bidder |
| 3 | Rejected-Technical HARSH ANAND YEVALEKAR MALA COLLEGE ROAD NASHIK 422005 | NASHIK | NASHIK | MAHARASHTRA | 422005 | - | - | Rejected-Technical Technically Dis-Qualified |
| Sl No | Description | Qty | Unit | Spectrum Infrastructure L1 | M/s. DeltaTechs Construction Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) | 5,833.32 | Cum | 252 ₹14.7 L | 256 ₹14.9 L |
| 2.00 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5 to 3.0 mtere.) | 106.51 | Cum | 283 ₹30,142.33 | 293 ₹31,207.43 |
| 3.00 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5metre) | 76.21 | Cum | 310 ₹23,625.10 | 315 ₹24,006.15 |
| 4.00 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting etc. complete. (Lift from 1.5m To 3.0 m.) By Mechanical Means | 62 | Cum | 653 ₹40,486 | 663 ₹41,106 |
| 5.00 | Excavation for foundation in Hard rock by chiselling, wedging, line drilling, etc. including trimming and levelling the bed, removing the excavated material upto a distance of 50 metres beyond the building area stacking as directed, dewatering and back filling with available earth/ murum watering, ramming etc.complete. (Lift upto 1.5 m). By Mechanical Means | 48.9 | Cum | 1,629 ₹79,658.10 | 1,656 ₹80,978.40 |
| 6.00 | Filling in plinth and floors with approved excavated material in 15 centimetre to 20 centimetre layers including watering and compacting etc. complete. Spec. No. : Bd.A. 11/Page No. 262 | 737.64 | Cum | 147 ₹1.1 L | 149 ₹1.1 L |
| 7.00 | Filling in plinth and floors with contractors material/brought from outside and approved by Engineer in charge in layers of 15 centimetre to 20 centimetre. including watering and compaction etc. complete. Spec. No. : Bd.A. 11/Page No. 263 | 654.45 | Cum | 1,533 ₹10.0 L | 1,549 ₹10.1 L |
| 8.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) by treating the bottom surface and sides of excavation at the rate of 5 litres of emulsion concentrate of 1.0 percent of chlorophyrifos per square meter of surface area covering 10 years guarantee on bond paper. | 864.27 | Sqm | 124 ₹1.1 L | 126 ₹1.1 L |
| 9.00 | Providing preconstructional antitermite treatment as per I.S. 6313 (Part-II) treatment by treating the backfill in immediate contact with foundation at the rate of 5 litres of emulsion concentrate of 1.0 percent of clorophyrifos per square metre of vertical surface area covering 10 years guarantee on bond paper. | 117 | Sqm | 130 ₹15,210 | 132 ₹15,444 |
| 10.00 | Providing preconstructional antitermite treatment as per Indian Standard 6313 (Part-II) by treating the top surface of plinth filling at the rate of 5 litres of emulsion concentrate at 0.5 percent of clorophyrifos per square metre of surface area covering ten years guarantee on bond paper. ( AS per Item no. 22.43 of schedule of rates of NBO ) | 417 | Sqm | 125 ₹52,125 | 127 ₹52,959 |
Tender Value
₹19.3 Cr
EMD Value
₹9.7 L
Closing Date
20 Aug 2025, 4:00 pmClosed
Managing Director
Mafatlal House,1st Floor, H.T. Parekh Marg, 169, Backbay Reclamation, Church gate, Mumbai 400 020
Construction of New Suits and Upgradation of Existing facilities at MTDC Resort Trimbakeshwar Dist Nashik
2025_TCADM_1210007_1
MTDC/Works/2025-26/76
Open Tender
Civil Works
730 days
Trimbakeshwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
₹9.7 L
4 Nov 2025
12 Aug 2025
22 Aug 2025
12 Aug 2025
20 Aug 2025
12 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_2092042.xls
BOQ • 0.79 MB
Download all tender documents and submit your bid