| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹19.2 CrAccepted-AOC 858 SECTOR 23 127021 | BHIWANI | HARYANA | 127021 | ₹19.2 Cr Quoted ₹1.9 Cr | 1 | Accepted-AOC DUE TO LOWER SIDE OF RATES |
| 2 | 2₹19.9 CrRejected-AOC | ₹19.9 Cr | 2 | Rejected-AOC DUE TO HIGHER SIDE OF RATES24 |
| 3 | 3₹20.3 CrRejected-AOC | ₹20.3 Cr | 3 | Rejected-AOC DUE TO HIGHER SIDE OF RATES |
| 4 | 4₹22.8 CrRejected-AOC HOUSE NO 953 SECTOR 23 HUDA BHIWANI TEHSIL AND DISTRICT BHIWANI | BHIWANI | BHIWANI | HARYANA | ₹22.8 Cr | 4 | Rejected-AOC DUE TO HIGHER SIDE OF RATES |
| 5 | 5₹24.1 CrRejected-AOC 52 SHANTI NAGAR MODEL TOWN PANIPAT OPPOSITE AMAR STEEL SHUTTERING WORKS | PANIPAT | HARYANA | 132103 | ₹24.1 Cr | 5 | Rejected-AOC DUE TO HIGHER SIDE OF RATES |
Tender Value
₹21.5 Cr
EMD Value
₹42.9 L
Closing Date
10 Aug 2020, 5:00 pmClosed
EXECUTIVE ENGINEER PHED SIWANI
PUBLIC HEALTH ENGINEERING DIVISION SIWANI GURERA ROAD
Construction of 1 water works 1 main Boosting Station 5 Boosting stations at Loharu Town comprising design construction testing commissioning O and M for 12 months during defect liability period after trail run of 3 month and 5 year thereafter all ot
2020_HRY_135845_1
EIC 59689-PHE/WORKS(2)
Open Tender
Civil Works
540 days
SIWANI
Please refer Tender documents.
3 documents required · 3 mandatory
₹20,000
EXECUTIVE ENGINEER
₹42.9 L
Yes
21 Sept 2020
16 Jul 2020
11 Aug 2020
16 Jul 2020
10 Aug 2020
16 Jul 2020
Amount
WATER TREATMENT PLANT (WTP) Design & construction of 5.00 MLD capacity automated PLC controlled water treatment plant at Water Works Loharu including interconnecting DI pipe from raw water pump to inlet box of WTP, CWT & Suction Well for CW , inlet channel, Alum dozing, Flash mixing, Clari floculator, filter box, over head Reservoir for back wash including pump sets and electric control panel, waste water tank including pump sets and electric control panel, DI pipes, DI specials, manhole covers, air scour equipment, chemical house including chlorination equipment and all other civil / mechanical / electric installations complete in all respects as per DNIT (Sluice valves of make IVC/VAG)
RAW WATER PUMPING MACHINERY Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame RAW WATER PUMPING STATION 7400 LPM X 50 M. Head
WATER WORKS 5200 LPM X 12.50 M. Head
CLEAR WATER PUMPING MACHINERY Supply & Eraction of Horizontal spindle split casing type pumping sets of following duties directly coupled to AC squirrel cage induction type motor with accessories as described in Schedule No II complete in all respect with priming arrangement with complete base frame WATER WORKS 5200 LPM X 45 M. Head
MBS 2400 LPM X 40 M. Head
2500 LPM X 30 M. Head
1500 LPM X 35 M. Head
400 LPM X 25 M. Head
BOOSTING STATION NO.1 3600 LPM X 40 M. Head
BOOSTING STATION NO.2 1600 LPM X 40 M. Head
BOOSTING STATION NO.3 2400 LPM X 40 M. Head
BOOSTING STATION NO.4 2900 LPM X 40 M. Head
BOOSTING STATION NO.5 600 LPM X 40 M. Head
PANEL BOARDS FOR MOTORS Supply, erection, testing & commissioning of wall mounted electrical L.T. Panel board, fabricated from 16 SWG CRCA sheet duly stouted with suitable angle iron frame work and completely powder coated of approximate size 1200 x 900 mm and 400 mm deep having following items For 2 no Pumping Sets of 7400 LPM x 50 m Head a) Main switch 250 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 7400 LPM x 50 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.2
For 2 no Pumping Sets of 5200 LPM x12.50 m Head a) Main switch 63 amp. 2 No. (L&T Siemens, ABB)b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T)c) Digital Multi function meter = 1 No.d) SPP = 1 No. of approved makee) Motor starter, Star delta for 5200 LPM x 12.5 m Head = 2 Nos (L&T Siemens, ABB)f) VSS 1 No. & ASS 2 Nos. of approved make.g)Capacitor KVAR as per site requirement = 1 No.h) Indicating Lamp = One Seti) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.3
For 2 no Pumping Sets of 5200 LPM x 45 m Head a) Main switch 200 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 5200 LPM x 45 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.4
For 2 no Pumping Sets of 2400 LPM x 40 m Head a) Main switch 100 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 2400 LPM x 40 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.5
For 2 no Pumping Sets of 2500 LPM x 30 m Head a) Main switch 100 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 2500 LPM x 30 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.6
For 2 no Pumping Sets of 1500 LPM x 35 m Head a) Main switch 63 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1500LPM x 35 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.7
For 2 no Pumping Sets of 400 LPM x 25 m Head a) Main switch 63 amp. 1 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 400 LPM x 25 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.8
For 2 no Pumping Sets of 3600 LPM x 40 m Head a) Main switch 100 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 3600 LPM x 40 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g) Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 1.9
For 2 no Pumping Sets of 1600 LPM x 40 m Head a) Main switch 63 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 1600 LPM x 40 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 2
For 2 no Pumping Sets of 2400 LPM x 40 m Head a) Main switch 100 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 2400 LPM x 40 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 2.1
For 2 no Pumping Sets of 2900 LPM x 40 m Head a) Main switch 100 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 2900 LPM x 40 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 2.2
For 2 no Pumping Sets of 600LPM x 40 m Head a) Main switch 63 amp. 2 No. (L&T Siemens, ABB) b) CT 100/3 = 2 Nos. (AE/ KAPPA/ L&T) c) Digital Multi function meter = 1 No. d) SPP = 1 No. of approved make e) Motor starter, Star delta for 600LPM x 40 m Head = 2 Nos (L&T Siemens, ABB) f) VSS 1 No. & ASS 2 Nos. of approved make. g)Capacitor KVAR as per site requirement = 1 No. h) Indicating Lamp = One Set i) Change over switch of suitable Amp = 1 No. (Each) Ref. sr. no. 2.3
Supply, erection, testing & commissioning of IS marked copper wire for various motors with underground system in PVC and flexible pipes copper wire 3 core complete in all respevts with accessories like thimble etc. 10mm2 3core
25mm2 3core
40mm2 3core
60mm2 3core
90mm2 3core
Sluice Valves / NRV & specials for Pumping Machinery Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 including cost of jointing material complete in all respect. (IVC / VAG make, Kirloskar) 100 mm i/d
Supplying,fixing, testing & commissioning of DI swing check type reflux valve (non returned valve) PN 1.6 including cost of jointing material complete in all respect.( IVC / VAG , Kirloskar make) 100 mm i/d
Supply, fixing & testing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 100 mm i/d
Supply, erection, fixing & testing of DI Double flanged pipe complete with all jointing materials 100 mm i/d
Sluice Valves/ Specials For Rising Mains Supplying, fixing, jointing, testing & commissioning of DI sluice valves resilient sheet P.N. 1.6 as per DNIT specification on the pumping machinery & head works including cost of jointing material (IVC / VAG make) 150 mm i/d
Supply & Fixing of Mechanical Joints PN 1.6 alongwith ruber gaskit & galvanized nuts / bolts complete in all respect. 150 mm i/d
Providing & fixing of D.I. Kinetic Air Valve soft seated as confirming to I.S.I. complete in all respect. 80mm
Supply erection testing and commissioning of exhaust fans each having a capacity of 45 cubic meters per minutes, complete in all respect.
Supply erection & testing of Ceiling fan of size 48" i/d (1200 mm) of reputed ISI make complete in all respect.
Providing and fixing of insulated Rubber matting suitable for HKV installation 1 meter x 2 meter x 12 mm as per specification.
Supplying and fixing of Gantry with chain pulley block of following capacity with traveling trolley of appropriate lifting capacity for handling of pumping sets capable of moving along the girders to be provided in the pump house complete in all respects as per specifications approved by Engineer-in-Charge. 2Ton Capacity at W/W & MBS
Supply erection, testing & commissioning of light fittings including complete wiring alon with all material upto 10 points including switch, button, plug, PVC conduict pipe & copper wire etc. as per approved specifications. ( 5 no. pump chambers of Boosting Stations + 1 HT Meter Room)
Providing & fixing suitable size floating arm along with swivel bend as per required specifications approved by Engineer-in-Charge
Supply erection, and commissioning electric operated dewatering pump of 3 HP Kirlosker make complete from priming with wiring starters switches etc. also the required GI pipe (B Class) valves etc complete in all respect. (1 at Water Works + 1at MBS = 2 no )
Supply, erection testing & commissioning of caste iron sluice Gate valve of 1000 x 600 mm of 20 mm thickness with actuators for S & S Tanks with all acessories along with rising spindle including cost of all jointing material complete in all respect. (IVC / VAG make)
Supply erection testing of reputed make LED light 100 wats with fittings and accessories complete in all repects. (4 at ww + 2 at MBS + 10 no. at various Boosting stations)
Supply erection testing and commissioning of Flow Meter (KRONE Make) with digital display of 150 mm i/d complete in all respect.
Supply erection testing and commissioning of Gas clorinator including all material, labour complete in all respect entire satisfaction to the Engineer-in-charge. (1 no. at MBS + 5 no. at various Boosting stations)
Design, Supply & Erection of copper wound outdoor type Transformers of required KVA as mentioned below on load tap changer or suitable capacity on higher side of standard make outdoor type, VCB Panel, G.O. Switch, H.T. Metering Panels, APFC Panels along with for each Transformer, 11KV Substation, entire cable network from G.O. Switch to H.T. Metering equipment and from H.T. Metering to Transformer Main to L.T. Panel, Earthing, safety equipment and any other contingent thereto complete in all respect as per DNIT and getting it passed from Chief Electrical Officer including operation & Maintenance of 5 Years. At Raw water pumping station = 160 KVA
At Loharu W/W = 160 KVA
At MBS Loharu = 160 KVA
At VBS-3 Loharu = 63 KVA
At VBS-4 Loharu = 63 KVA
Design, Supply & Erection of 2 No. DG Sets of required KVA as mentioned below suitable capacity on higher side capacity with Acoustic Canopy, AMF Panel and Copper Earthing of suitable rate with change over switch & synchronizing panel complete as per DNIT including operation & Maintenance of 5 Years. At Loharu W/W = 160 KVA
At MBS Loharu = 125 KVA
Operation & Maintenance Operation & Maintenance of the scheme for 12 months during defect liability period after trail run of 3 months and 5 year thereafter. Defect liability period (Only items in which fault will be found then it will be replaced by the contractor at his own cost).
Operation & maintenance during 1st year
Operation and maintenance during 2nd year
Operation and maintenance during 3rd year
Operation and maintenance during 4th year
Operation and maintenance during 5th year
Bidder Name
Amount
MAHA LAXMI CONSTRUCTION COMPANY
Jai Shree Balaji Constn Co.
M/S SHREE BALAJI BUILDERS
SHEOKAND CONSTRUCTION COMPANY
BADESRA CONSTRUCTION
Yuvaan Constructions
M/S SHREE BALAJI BUILDERS
Yuvaan Constructions
MAHA LAXMI CONSTRUCTION COMPANY
Jai Shree Balaji Constn Co.
SHEOKAND CONSTRUCTION COMPANY
Yuvaan Constructions
BADESRA CONSTRUCTION
MAHA LAXMI CONSTRUCTION COMPANY
Jai Shree Balaji Constn Co.
SHEOKAND CONSTRUCTION COMPANY
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid