Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-Finance HARIHARPUR SANT KABIRNAGAR | HARIHARPUR | SANT KABIRNAGAR | UTTAR PRADESH | ₹1.1 Cr | L1 | Accepted-Finance L1 Lowest |
| 2 | L2₹1.1 Cr+₹1,059.55 (0.01%)Accepted-Finance SANT KABIR NAGAR | UTTAR PRADESH | 272170 | ₹1.1 Cr+₹1,059.55 (0.01%) | L2 | Accepted-Finance L2 Lowest |
| 3 | L2₹1.1 Cr+₹1,059.55 (0.01%)Accepted-Finance | ₹1.1 Cr+₹1,059.55 (0.01%) | L2 | Accepted-Finance L2 Lowest |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
30 Jun 2026, 5:00 pmClosed
Executive Officer
NP BISANDA
CONSTRUCTION OF R.C.C. NALA FROM MACHALI MANDI TO BLOCK GATE IN W.NO. 09 AND HERO AGENCY TO KHAMRIYA DAI ROAD IN W.NO. 03 BABERU ROAD BISANDA
2026_DOLBU_1160822_1
501/Nirman/NPBisanda/2026-27 Date 15-06-2026
Open Tender
Civil Works
Percentage
NP BISANDA
Please Refer Tender Dacument
2 documents required · 2 mandatory
₹12,502
EO
₹2.1 L
16 Jul 2026
16 Jun 2026
1 Jul 2026
16 Jun 2026
30 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation in B/C Soil including lift up to 1.5 m and lead upto 30m t&p etc all complete | 818.99 | CUM | 120 | ₹98,278.8 |
| 2 | 80% Disposal of malwa upto 5km. From site | 655.2 | CUM | 183.5 | ₹1,20,229.2 |
| 3 | S/L of laying of first class bedding on well compacted | 119 | CUM | 1,500 | ₹1,78,500 |
| 4 | cement concrete with 4cm (1/2") gauge approved stone
ballest , approved course sand cement in the proportion
1:4:8 including supply of all materials , labours and tools and plants etc.required for proper complition of the work | 112 | CUM | 4,300 | ₹4,81,600 |
| 5 | R.C.C Work cement approved cource sand and 2cm (3/4)
gauge approved stone ballast in the proporation 1:1.5:3 in
for edingwork t&p etc all (ssi no. 279 (b) chapt no. 5 page no. 25) | 348.25 | CUM | 7,100 | ₹24,72,575 |
| 6 | mild steel of iron work such as rainforcement concrete work (which not including all over rates) wrought to requiredshape as cnecessary including bending supply of steel its wastage and hooks and outhorized overlapping shall be measured SI no. 504. | 232.37 | QTL | 5,600 | ₹13,01,272 |
| 7 | DEWATERING BY 5 HP PUMP SET | 31 | Day | 1,360 | ₹42,160 |
| 8 | Earthwork excavation in B/C Soil including lift up to
1.5 m and lead upto 30m t&p etc all complete (si.
No. 251 chapt. No. 4 page no. 23) | 936 | CUM | 120 | ₹1,12,320 |
| 9 | 80% Disposal of malwa upto 5km. From site | 748.8 | CUM | 183.5 | ₹1,37,404.8 |
| 10 | S/L of laying of first class bedding on well compacted | 136 | CUM | 1,500 | ₹2,04,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
NIT7.pdf
Tender Documents • 0.81 MB
BOQ_2175582.xls
BOQ • 0.38 MB
NIT7.pdf
PDF • 0.88 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .