Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | ₹1.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.4 L+₹322.30 (0.22%)Rejected-AOC NAVA PUWA DHARMSHALA ROAD HARDARI | GANDHINAGAR | GUJARAT | 382115 | ₹1.4 L+₹322.30 (0.22%) | L2 | Rejected-AOC L2 |
| 3 | L3₹1.5 L+₹8,659.80 (6.02%)Rejected-AOC | ₹1.5 L+₹8,659.80 (6.02%) | L3 | Rejected-AOC L3 |
| 4 | L4₹1.6 L+₹12,537.80 (8.72%)Rejected-AOC SHOP NO 03 MVDA CAMPUS CIVIL LINES MATHURA 32 CIVIL LINES MVDA CAMPUS MATHURA MVDA CAMPUS MATHURA MATHURA UTTAR PRADESH 281001 | MATHURA | UTTAR PRADESH | 281001 | ₹1.6 L+₹12,537.80 (8.72%) | L4 | Rejected-AOC L4 |
| 5 | L5₹1.8 L+₹32,197.80 (22.4%)Rejected-AOC | ₹1.8 L+₹32,197.80 (22.4%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | RAJENDRA SINGH L1 | NARENDRA SINGH L2 | M/S MOOLI L5 | Vaishnavi I.T.Solutions L4 | SHIV OM CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting Jhunds and Moonj With Disposal away From Site or as Directed By Engineer-in- Charge | 1,400 | sqm | 24.5 ₹34,300 Lowest | 24.55 ₹34,370 | 32 ₹44,800 | 54 ₹75,600 | 26 ₹36,400 |
| 2.00 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 1,682 | cum | 65.1 ₹1,09,498.2 | 65.25 ₹1,09,750.5 | 78 ₹1,31,196 | 48 ₹80,736 Lowest | 69 ₹1,16,058 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
11 May 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT02
2026_UPIDC_1145472_2
01/EE/2026-27
Open Tender
Civil Works
Piece-work
15 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹177
₹5,000
Yes
21 Jul 2026
6 May 2026
12 May 2026
6 May 2026
11 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhunds and Moonj With Disposal away From Site or as Directed By Engineer-in- Charge | 1,400 | sqm | - | - |
| 2 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 1,682 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_2141326.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .