Loading
Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-Finance 1098 BAZAR KHOHAL GORAKHPUR UTTAR PRADESH | ₹1.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹1.4 LAccepted-Finance NAVA PUWA DHARMSHALA ROAD HARDARI | GANDHINAGAR | GUJARAT | 382115 | ₹1.4 L | L2 | Accepted-Finance L2 |
| 3 | L3₹1.5 LAccepted-Finance | ₹1.5 L | L3 | Accepted-Finance L3 |
| 4 | L4₹1.6 LAccepted-Finance SHOP NO 03 MVDA CAMPUS CIVIL LINES MATHURA 32 CIVIL LINES MVDA CAMPUS MATHURA MVDA CAMPUS MATHURA MATHURA UTTAR PRADESH 281001 UDYAM UP 54 0009871 09AXOPS3798N1Z4 B R | MATHURA | UTTAR PRADESH | 281001 | ₹1.6 L | L4 | Accepted-Finance L4 |
| 5 | L5₹1.8 LAccepted-Finance | ₹1.8 L | L5 | Accepted-Finance L5 |
| Sl No | Description | Qty | Unit | RAJENDRA SINGH L1 | NARENDRA SINGH L2 | M/S MOOLI L5 | Vaishnavi I.T.Solutions L4 | SHIV OM CONTRACTOR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Uprooting Jhunds and Moonj With Disposal away From Site or as Directed By Engineer-in- Charge | 1,400 | sqm | 24.5 ₹34,300 | 24.55 ₹34,370 | 32 ₹44,800 | 54 ₹75,600 | 26 ₹36,400 |
| 2.00 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 1,682 | cum | 65.1 ₹1.1 L | 65.25 ₹1.1 L | 78 ₹1.3 L | 48 ₹80,736 | 69 ₹1.2 L |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
11 May 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT02
2026_UPIDC_1145472_2
01/EE/2026-27
Open Tender
Civil Works
15 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹177
₹5,000
Yes
8 Jun 2026
6 May 2026
12 May 2026
6 May 2026
11 May 2026
6 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Uprooting Jhunds and Moonj With Disposal away From Site or as Directed By Engineer-in- Charge | 1,400 | sqm | - | - |
| 2 | Silt Clearance/trench Digging including Lift Upto 1.5m and lead upto 6m, including cost of Driver/Assistant driver, POL, Maintenance of machine, contractor profit, taxes atc but excluding leveling, dressing & compaction. a) By Hydraulic excavator/JCB/equivalent capacity 25 cum/hour ie. 1000/25. (Rs. 1000 per hour) | 1,682 | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.92 MB
BOQ_2141326.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid