Loading…
Loading…
Tender Value
₹10.5 L
EMD Value
₹20,940
Closing Date
29 Jun 2026, 4:00 pm
EXEN CRD SMC
EXEN CRD SMC
Development of link road from H/o Zahoor Hussain Rather to Ghulam Mohi ud Din Dar at Durbal Bemina bwo p/l of CC pavement
2026_HAUDD_312694_5
ENIT/08/CRD/SMC/DT.16-06-2026
Open Tender
Civil Works
12 days
BEMINA
REFER TENDER DOCS
2 documents required · 2 mandatory
₹600
MUNICIPAL ACCOUNT
₹20,940
17 Jun 2026
17 Jun 2026
30 Jun 2026
17 Jun 2026
29 Jun 2026
17 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out of GEOTAGGED photographs of size 150mm x 100mm at site before execution of work, during execution and after completion of work including submitting the same to the engineer incharge. | 15 | No. | 20 | ₹300 |
| 2 | Surface dressing of ground including removing vegetation and inequalities, not exceeding 15cm deep and disposal of the rubbish beyond SMC limits in all kinds of soils including all its leads, lifts, loading, unloading, head load (if any) costs & carriages etc., complete. | 521.95 | Sqm | 24.12 | ₹12,589.43 |
| 3 | Providing and laying stone soling duly hand packed in trenches including proper ramming, watering etc. complete. | 78.29 | Cum | 900 | ₹70,461 |
| 4 | Centering & Shuttering including strutting propping etc. and removal form work for foundation, footings bases of columns blocks etc. complete. | 62.92 | Sqm | 286.35 | ₹18,017.14 |
| 5 | P/L, in position cement concrete of specified grade including curing but excluding the cost of centering & shuttering. All work up to plinth level in 1:4:8 (1cement: 4 coarse, sand: 8 graded stone aggregate of 40 mm Nominal size (Crushed) all inclusive leads, lifts, loading, unloading, head load (if any) costs and carriages complete. | 39.14 | Cum | 5,500 | ₹2,15,270 |
| 6 | Steel Reinforcement for RCC works including straightening, cutting, bending placing in position and binding all complete. (TMT Bars) (Dowel Bars). | 995.41 | Kgs | 123.2 | ₹1,22,634.51 |
| 7 | P/L, in position cement concrete of specified grade excluding the cost of centering & shuttering. All work up to plinth level in grade 1:1.5:3 (1cement: 1.5 coarse sand: 3 graded stone aggregate of 20 mm Nominal size (Crushed) including all leads, lifts, loading, unloading, head load (if any) costs and carriages complete. | 78.29 | Cum | 7,700 | ₹6,02,833 |
| 8 | Providing and fixing of Sign board as per directions of Engineer incharge complete. | 1 | No. | 5,000 | ₹5,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_1012030.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid