Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-Finance | 1 | Accepted-Finance 1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | JAGDISH ELECTRIC STORE L1 |
|---|---|---|---|---|
| 1.00 | Testing & servicing of 500 KVA transformer with
Merggring . fault finding , Leakage controlling & Tightening of bolts . Cleaning punching of new lugs , copper bus bar patti . Nut bolt etc in all respect as per site required | 1 | NOS | 94,000 ₹94,000 Lowest |
| 2.00 | Supply and filling of fresh transformer oil as per
IS 335 in existing transformer . The oil shall be clear and free from any suspended matter or sediments complete es required complete in all respect. All as per pre approved by Engineer in charge. | 300 | LTR | 123 ₹36,900 Lowest |
| 3.00Replacement of LT/HT bushings of Distribution Transformers including replacement of brass studs, porcelain insulators , nut bolts , oil seals etc complete as required complete in all respect. All as per pre approved by Engineerin charge | ||||
| 3.10 | LT Bushing Set 500 KVA | 4 | NOS | 18,000 ₹72,000 Lowest |
| 3.20 | HT Bushing Set 500 KVA | 3 | NOS | 21,000 ₹63,000 Lowest |
| 4.00 | Replacement of Siica gel Breather of
Distribution Transformers of 500 KVA capacity]
complete in all respect. All as per pre approved
by Engineer in charge. | 1 | NOS | 5,000 ₹5,000 Lowest |
| 5.00 | Replacement of gasket of Distribution
Transformers of 500 KVA capacity complete in
all respect. All as per pre approved by Engineer
in charge | 1 | NOS | 40,000 ₹40,000 Lowest |
| 6.00 | P& F dial type temperature gauge | 1 | NOS | 3,000 ₹3,000 Lowest |
Tender Value
₹3.1 L
EMD Value
₹6,300
Closing Date
4 Mar 2026, 6:00 pmClosed
Executive Director (Works) , ADMA
Amber Development and Management Authority Old Vidhan Sabha Bhawan, Near Hawa Mahal, Jaipur
Repairing of 500 KVA Transformer at Vidhyadhar Ka Bagh, Jaipur
2026_Amber_541711_2
24/2025-26
Open Tender
Electrical Works
Item Rate
30 days
Vidhyadhar Ka Bagh
Please refer Tender documents.
4 documents required · 4 mandatory
₹500
Chief Executive Officer, ADMA
₹6,300
16 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
Testing & servicing of 500 KVA transformer with Merggring . fault finding , Leakage controlling & Tightening of bolts . Cleaning punching of new lugs , copper bus bar patti . Nut bolt etc in all respect as per site required
Supply and filling of fresh transformer oil as per IS 335 in existing transformer . The oil shall be clear and free from any suspended matter or sediments complete es required complete in all respect. All as per pre approved by Engineer in charge.
Replacement of LT/HT bushings of Distribution Transformers including replacement of brass studs, porcelain insulators , nut bolts , oil seals etc complete as required complete in all respect. All as per pre approved by Engineerin charge
LT Bushing Set 500 KVA
HT Bushing Set 500 KVA
Replacement of Siica gel Breather of Distribution Transformers of 500 KVA capacity] complete in all respect. All as per pre approved by Engineer in charge.
Replacement of gasket of Distribution Transformers of 500 KVA capacity complete in all respect. All as per pre approved by Engineer in charge
P& F dial type temperature gauge
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Item07.pdf
Tender Documents • 1.07 MB
BOQ_965674.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .