| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 CrAccepted-AOC 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICATION 124103 | JHAJJAR | HARYANA | 124103 | ₹19.8 Cr Quoted ₹20.2 Cr | L1 | Accepted-AOC awarded |
| 2 | L2₹27.9 CrRejected-Finance | ₹27.9 Cr | L2 | Rejected-Finance L2, hence rejected. |
Tender Value
Refer Docs
EMD Value
₹38.8 L
Closing Date
4 Dec 2023, 5:00 pmClosed
Vikas Malik
Division - Projects
Work of Outfall of storm water drainage in Leg-II (Phase-I) for Gurugram Town, Haryana
2023_HRY_328398_1
20235EBAC69C ADE6 427A 8C5D EBEA1EBF7D4C717001
Open Tender
Civil Works
540 days
Gurugram
2 documents required · 2 mandatory
₹1,000
₹38.8 L
Yes
Conference Hall, Plot no.3, sec-44, Gurugram
8 Mar 2024
11 Nov 2023
5 Dec 2023
11 Nov 2023
4 Dec 2023
11 Nov 2023
16 Nov 2023
Amount
Planning, Designing, Construction Testing of all structures for Construction of Sump Well of size 24 Mtr x12 Mtr 3.2 Mtr SWD as per drawings No SW/P/D-2 of Leg-II Phase-1 Between existing box drain and the proposed out fall drain. This includes all ancillary works required for the construction of the sump well including dewatering and diverting the flow from the existing drain and temporary acquisition of land if required for the purpose.
Planning, Designing, Construction Testing of all structures for Construction of Balance (550-43.60) Mtr of proposed open drain of size 21.6 Mtr x 2 Mtr as per drawing enclosed of Leg-II in Phase-1. This includes all ancillary works required for the construction of the Drain including dewatering and diverting the flow from the existing drain and temporary acquisition of land if required for the purpose.
Planning, Designing, Construction Testing of all civil structures of outfall arrangement of Leg-II near Najafgarh drain, and providing wire crates as per the attached drawings. This includes all ancillary works required for the construction of the outfall arrangement including dewatering and diverting the flow from the existing drain and temporary acquisition of land if required for the purpose.
Planning, Designing, Supply installation, Testing and Commissioning of all electro mechanical works i.e. 9 Nos Sluice Gates with ancillary works. This also includes all ancillary works required for the construction of the outfall arrangement including dewatering, diverting the flow from the existing drain and temporary acquisition of land if required for the purpose.
Tomar Construction Company
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf