| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹22.1 LAccepted-AOC | 1 | Accepted-AOC ACCEPTED | |
| 2 | 2₹23.9 L+₹1.8 L (8.03%)Accepted-AOC MIRDHAN KIRATPUR DISTRICT BIJNOR | BIJNOR | UTTAR PRADESH | 246701 | 2 | Accepted-AOC REJECTED | |
| 3 | 3₹24.4 L+₹2.2 L (10.1%)Accepted-AOC BAROJ ROAD SHAKTI NAGAR COLONY DISTRICT BIJNOR | BIJNOR | BIJNOR | UTTAR PRADESH | 3 | Accepted-AOC REJECTED |
Tender Value
Refer Docs
EMD Value
₹53,000
Closing Date
9 Feb 2021, 5:00 pmClosed
EEMGCCD7 Bijnor
EEMGCCD7 Bijnor
CONSTRUCTION OF CANAL FROM KM. 22.620 TO KM. 22.670 AND DRB CUM FALL AT KM 22.650 OF PANWASA DY.
2021_UPIDC_550073_7
03/EE/2020-21
Open Tender
Civil Works - Canal
Item Wise
90 days
Sambhal
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹53,000
Yes
10 Mar 2021
2 Feb 2021
10 Feb 2021
2 Feb 2021
9 Feb 2021
2 Feb 2021
2 Feb 2021 - 9 Feb 2021
Amount
Earth work in embankment in ordinary soil in 20 cm layer including ramming and dressing the surface to the required level and slope also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Earth work in excavation in foundation in ordinary soil with wet earth & disposal within 30 M.
Cement concrete in 1:2:4 (M-15) including all cost of material, labour , T&P etc. for completion of work
Cement concrete in 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work
Cement concrete in (M-30) including all cost of material, labour , T&P etc. for completion of work
Centering & Shuttering including all cost of material, labour and T&P etc. for proper completion of work.
for CC work
for RCC work
Cement concrete with stone ballast in R.C.C. 1:1.5:3 (M-20) including all cost of material, labour , T&P etc. for completion of work
Cement concrete with stone ballast in R.C.C. 1:1:2 (M-25) including all cost of material, labour , T&P etc. for completion of work
Supply and laying steel reinforcemet with cutting, binding, & placing includign cost of binding wire, steel, labour and T&P etc. complete.
Supllying and laying 225 mm wide PVC wtaer seal in expansionsion joint
Providing and laying graded stone ballast 20-40 mm. Size including all cost of material, labour and T&P etc. complete.
First class brick work in 1:4 C.M. including all cost of material, labour and T&P etc. for proper completion of work.
S/F of 75 mm dia G.I.pipe as drainage spout icluding cost of all material, labour and T&P etc. for proper completion of work.
Supply and laying thermocoal sheet in expanson joint including all cost of material, labour and T&P etc. complete.
Supply and fixing wheel gaurd including all cost of material, labour and T&P etc. complete.
Cement pointing in 1:2 (struck deep) on brick masonry i/c cost of all material, labour, T&P etc for completion of work.
Earth work in filling in Ramp including ramming and dressing the surface to be required level and slope also including carriage 600 M up to work site with all lead and lift, complete as per directed by Engineer-in-Charge.
Dry brick on edge soling laid dry filling joints including all cost of material, labour and T&P etc. all complete.
Filling of expansion Joint with bitumen and saw dust including all cost of material, labour and T&P etc. complete.
Supply and fixing diversion Board including all cost of material, labour and T&P etc. complete.
arif husain
MANOJ CHAUDHARY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .