Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.3 L+₹12,150.46 (5.50%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.4 L+₹23,427.72 (10.6%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.5 L+₹24,056.66 (10.9%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Without Documents |
| Sl No | Description | Qty | Unit | SRI RAGAVENDRA CONSTRUCTION L2 | N RAMALINGAM L4 | Devaraj Hemanath L3 | SURESH CONTRACTOR L1 |
|---|---|---|---|---|---|---|---|
| 1.00Vadamambakkam - Mudur Road to Ammavarthangal road (0.870km) at Arakkonam Block | |||||||
| 2.00 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 600 | Sqm | 6.36 ₹3,816 | 6 ₹3,600 Lowest | 6.36 ₹3,816 | 6 ₹3,600 Lowest |
| 3.00 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 91.5 | Cum | 140.45 ₹12,851 | 140 ₹12,810 | 140.45 ₹12,851 | 135 ₹12,353 Lowest |
| 4.00 | Collection and supply of Carted Earth for Basecourse And side berms and labour charges for filling etc complete | 45 | Cum | 150.3 ₹6,764 | 150 ₹6,750 | 150.3 ₹6,764 | 115 ₹5,175 Lowest |
| 5.00 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed | 4.15 | Cum | 3,070.76 ₹12,744 | 3,070 ₹12,741 Lowest | 3,070 ₹12,741 Lowest | 3,070.76 ₹12,744 |
| 6.00 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges | 41.45 | Sqm | 108 ₹4,477 Lowest | 108 ₹4,477 Lowest | 108.21 ₹4,485 | 108.21 ₹4,485 |
| 7.00 | Applying tack coat over WBM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete | 41.45 | Sqm | 28.29 ₹1,173 Lowest | 28.29 ₹1,173 Lowest | 28.29 ₹1,173 Lowest | 28.29 ₹1,173 Lowest |
| 8.00 | Applying tack coat over Existing BT surface using 3 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST | 241.5 | Sqm | 42.25 ₹10,203 Lowest | 44.02 ₹10,631 | 44.02 ₹10,631 | 44.02 ₹10,631 |
| 9.00 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 8.69 | cum | 16,750 ₹1,45,558 | 17,893.49 ₹1,55,494 | 17,800 ₹1,54,682 | 15,780 ₹1,37,128 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 35,565.48 ₹35,565.48 | 37,381.68 ₹37,381.68 | 37,285.74 ₹37,285.74 | 33,712.02 ₹33,712.02 Lowest |
Tender Value
₹2.5 L
EMD Value
₹2,500
Closing Date
19 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP AKM
Panchayat Union Arakkonam
WSA Road to Paranji Health Sub Centre Road (0.500km) at Arakkonam Block
2026_RDTN_722917_1
A2/3960/2026
Open Tender
Civil Works
Item Rate
120 days
Panchayat Union Arakkonam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2,500
Yes
24 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
19 Nov 2026
5 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Vadamambakkam - Mudur Road to Ammavarthangal road (0.870km) at Arakkonam Block | - | - | - | - |
| 2 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 600 | Sqm | 6.36 | ₹3,816 |
| 3 | Earthwork excavation in all classes of soils and subsoils including shoring and strutting with initial lead and lift etc complte, as per MOST specification asper SS20 A. | 91.5 | Cum | 140.45 | ₹12,851.18 |
| 4 | Collection and supply of Carted Earth for Basecourse And side berms and labour charges for filling etc complete | 45 | Cum | 150.3 | ₹6,763.5 |
| 5 | Providing & Laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 150mm thick specification including premixing the materials with water at OMC in mechanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in sub base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges rentals for machinery, fuel and all other incidental charges etc, completed | 4.15 | Cum | 3,070.76 | ₹12,743.65 |
| 6 | Applying Prime coat over WMM surface using 7 kgs of bitumen emulsion (SS1) per 10 sqm for preparatory to another bituminous construction over it including cost of bitumen emulsion including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges | 41.45 | Sqm | 108.21 | ₹4,485.3 |
| 7 | Applying tack coat over WBM surface using 2.50 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete | 41.45 | Sqm | 28.29 | ₹1,172.62 |
| 8 | Applying tack coat over Existing BT surface using 3 kgs of bitumen emulsion per 10 sqm including cost of bitumen emulsion which will be supplied departmentally at section stores cost of which will be recovered at the issue rate as per the special conditions appended herewith including conveyance of bitumen emulsion to actual workspot handling charges including labour charges for brushing , cleaning and preparing the surface for laying the required quantity of bitumen emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags, etc., complete as per standard specification No 503 of MOST | 241.5 | Sqm | 44.02 | ₹10,630.83 |
| 9 | BITUMINOUS CONCRETE 30 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5 | 8.69 | cum | 17,893.49 | ₹1,55,494.43 |
| 10 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
paranchi.pdf
Tender Documents • 0.43 MB
BOQ_867989.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .