Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹2,550
Closing Date
13 Oct 2026, 3:00 pm
Pennagaram Block
Block Development Officer (VP), Pennagaram Block
Providing New pipeline from EB office to OHT end at Madhehalli village H O Madhehalli pt.
2026_RDTN_707183_1
Roc.No.1893/2026/E2 Date 21.09.2026 Village General Fund 2026-27 P05
Open Tender
Civil Works
Item Rate
120 days
Block Development Officer (VP), Pennagaram Block
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹2,550
Yes
Block Development Officer (VP), Pennagaram Block
23 Sept 2026
23 Sept 2026
13 Oct 2026
23 Sept 2026
13 Oct 2026
24 Sept 2026
24 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing New pipeline from EB office to OHT end at Madhehalli village H/O Madhehalli pt | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 379.26 | Cum | - | - |
| 3 | Supply of 63mm HDPE Pipes including cost and conveyance of all materials to site and all labour charges etc., completed. | 602 | Cum | - | - |
| 4 | Labour charges for laying and joining 63mm HDPE Pipes including all labour charges for laying pipes in proper alingment and gradient including cost of solvent cement etc., complete. | 602 | Cum | - | - |
| 5 | Refilling with excavated earth after laying of pipes including all labour charges Solvent cement etc., complete. | 377.38 | Cum | - | - |
| 6 | Supply and Fixing of PVC /GI Specials including all labour charges etc.,
63mm HDPE Joint(Pg- 204 SOR 2025-2026) | 5 | Sqm | - | - |
| 7 | 50mm Gun Metal gate Valvet(Pg- 37 SOR 2025-2026) | 1 | Sqm | - | - |
| 8 | Construction of chamber
Earth work excavation and depositing on bank with initial lead and list in all clauses as soil as per SS 20 B | 1 | Cum | - | - |
| 9 | Cement concrete 1:4:8 mix using 40mm metal including cost and Conveyance of all site etc. Complete. | 0.1 | mt | - | - |
| 10 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x43/8"x23/4" and conveyance of all materials to site and all labour charges etc complete -10 cum | 0.37 | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.18 MB
5Pricebid.pdf
Additional Documents • 0.42 MB
BOQ_850217.xls
BOQ • 0.27 MB
5Techbid.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .