| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.3 CrAccepted-AOC 7C GOVIND NAGAR MATHURA | MATHURA | ₹7.3 Cr | L1 | Accepted-AOC Preparation Bond for Rs. 73072045.00 Only |
| 2 | L2₹7.5 Cr+₹15.0 L (2.06%)Rejected-Finance | ₹7.5 Cr+₹15.0 L (2.06%) | L2 | Rejected-Finance Rejected due to higher Rates |
| 3 | L3₹8.5 Cr+₹1.2 Cr (16.0%)Rejected-Finance 2K 23 HOUSING BOARD KRISHNA NAGAR BHARATPUR RAJASTHAN 321001 | BHARATPUR | BHARATPUR | RAJASTHAN | 321001 | ₹8.5 Cr+₹1.2 Cr (16.0%) | L3 | Rejected-Finance Rejected due to higher Rates |
Tender Value
₹11.3 Cr
EMD Value
₹22.5 L
Closing Date
20 Jan 2025, 12:30 pmClosed
Superintending Engineer
Office Of The Superintending Engineer Agra Circle 198 Takkar Road Pwd Agra
Widending and Strenghtning work of Barsana Uanchgaon Sunhera road (ODR) in District Mathura
2025_CEAGR_992248_1
6005/14M-AC/2024-25 dated 16-11-2024
Open Tender
Civil Works
Item Wise
365 days
Mathura
Widending and Strenghtning
2 documents required · 2 mandatory
₹2,360
₹22.5 L
Yes
Agra
1 Mar 2025
10 Jan 2025
20 Jan 2025
13 Jan 2025
20 Jan 2025
13 Jan 2025
15 Jan 2025
Amount
Cleaning Jungles including uprooting of trunk vegetation grass, bushes, wood trees and sapling of girth upto 30cm measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50 meters out side the periphery of area cleared. As Per S.I. No. 259
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m. As per MORT&H Specification No. 301 (3.6).
Construction of Embankment/ Patri with approved material obtained from Borrow-pits with a lift, transporting to site, spreading, grading to required slope and compacting to meet requirements of table 300.20. As per MORT&H Specification No. 3.16 (305). (Cartage Earth)
Providing, laying spreading & compacting of granular sub-base by providing coarse graded (Gr-1) materials, spreading in uniform layers with Motor Grader on prepared surface, mixing by mix in placed method with Rotovator at OMC and compacting with in layers with smooth wheeled Vibratory Roller to achieve the desired density, complete and including all machinery charges & including all labour, T&P etc required for proper completion of the work. as directed by Engineer Incharge. As per MoRT&H clause 401(b).
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam (WMM) specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRT&H Specification 406.
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.25Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work.
Providing and laying Dense Graded Bituminous Macadam 100-120 TPH HMP using crushed aggregates of specified grading, premixed with bituminous binder VG-30 @ 4.50% by weight of total mix and filler, transporting the hot mix to work site laying with hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 505 Complete in all respects. (5.04)
Providing & applying Tack Coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20Kg./Sqm. on the prepared primed granular/old painted surface, cleaned with Mechanical broom, including all Taxes, Material, Labour, T&P etc required for proper completion of the work. (For BC)
Providing and laying Bituminous Concrete with 100-120 TPH HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grade premixed with bituminous binder VG-30 @ 5.40% of mix and filler, transporting the hot mix to work site laying with a hydrostatic paver finisher with to the required grade, level and alignment, rolling with smooth Wheeled vibratory & Tandom Rollars to acheive the desired compaction as per MORT&H Specifications clause 509 Complete in all respects.
Providing and laying cement concrete in 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) and curing complete, Including cost of form work. in Foundation and floors. As per S.I. No. 4.1.8
RCC work Providing and laying in position specified grade of reinforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) Ch-5 SI No- 5.1.2
Supplying, fitting and placing HYSD bar reinforcement in foundation complete including Labour for straightening, cutting, bending, shifting to site, tying and placing in position as per drawing and technical specifications ( for Drain)
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work. As per S.I. No. 6.1.1
Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 coarse sand) :Raised and cut pointing. As per S.I. No 13.31.2
12mm Cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers, and rounded angles not exceeding 80mm. In girth and finished even and smooth. As per S.I. No. 13.4.1
Providing and laying cement concrete in 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, Including cost of form work. In Foundation and floors. As per S.I. No. 4.1.3
Supply and laying & fixing of 350mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 600mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Supply and laying & fixing of 1000mm dia NP-3 Hume Pipe in proper alignment, joint filling and slopes etc. Complete as dwawing and technical specification.
Coursed rubble masonry (first sort) with hard stone in foundation plinth cement mortar . 1:6 (1 cement : 6 coarse sand). As per S.I. No 7.6
Plain/Reinforced Cement Concrete (PCC Grade M15 ) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8ACase-II
Sand Filling in Foundation Trenches as per Drawing & Technical Specification. As per MORT&H Specification no. 304 (12.03).
Reinforced Cement Concrete (M-30) in Open Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.8GCase - II
Plain/Reinforced cement concrete (RCC M-30) in sub-structure complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.05
Furnishing and Placing Reinforced/ Prestressed cement concrete (RCC M-30) in super-structure as per drawing and Technical Specification. As per MORT&H Specification no. 14.1C Case II
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MORT&H Specification no. 12.42 (For minor Bridge)
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications, all complete as per clause 2702. As per MORT&H Specification no. 14.4
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia PVC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. As per MORT&H Specification no. 13.8
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. As per MORT&H Specification no. 15.1
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification. As per MORT&H Specification no. 13.9
Drainage Spouts complete as per drawing and Technical specification. As per MORT&H Specification no. 14.9
Dewaterng of water trenches during excavation, concreting, masonary works upto sub soil/ water level including hire charges of 5 H.P.
Boring with 100 dia casing pipe including lowering & extraction, assembling, loading, unloading & cartage etc (hire charges only).
Dismantling R.C.C. work manually by mechenical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as directed by Engineer-In-Charge. As per S.I. no. 15.30
Empty Cement Bags of good condition (Plastic) filled with Carted Earth including filling, stiching and stacking at side of filling.
Maintainance Charge including @ Earth Work, repair of painted surface, Earth Work on patri, Culvert, Road Furniture etc as per Direction of E/I for the period of Five Year from the actual completion of work. including royalty on materials. GST shall be paid extra as applicable at the time of payment.
Maintainance of First Year (@ 0.00% of Total Work Amount of 1 to 36)
Maintainance of Second Year (@0.25% of Total Work Amount of 1 to 36)
Maintainance of Third Year (@0.50% of Total Work Amount of 1 to 36)
Maintainance of Fourth Year (@0.75% of Total Work Amount of 1 to 36)
Maintainance of Fifth Year (@1% of Total Work Amount of 1 to 36)
M/S R P INFRAVENTURE PRIVATE LIMITED (BID ID -4864105)
M/s Pradeep Pathak Contractor (BID ID -4867597)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1753569.xls
BOQ • 0.32 MB
160561238.html
Tender Documents • 0.05 MB
160940829.pdf
Tender Documents • 4.34 MB
SBDAddendum.pdf
Tender Documents • 2.60 MB
SBDBarsanaUnchagaonSunhara.pdf
Tender Documents • 1.17 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .