| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.2 CrAccepted-AOC | ₹5.2 Cr | L1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | PAS AND Co L1 |
|---|---|---|---|---|
| 1.00Improvement and Maintenance of Existing Damaged BT road in Chitteri to Mannur Forest Road in Dharmapuri Forest Division of Harur Range, during 2025 - 26 Km 0/0-11/000 during 2025 2026 | ||||
| 2.00 | Clearing Light Jungle road land including uprooting wildvegetation, grass, bushes, shrubs, saplling and disposal of
unserviceable materals and stacking of serviceable material tobe used or auctioned, upto a lead of 1000m including removal and disposal of top organic soild not exceeding
150mm in thickness as per technical specification clause 201. | 10,276.5 | Sqm. | 6 ₹61,659 Lowest |
| 3.00 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton hard red earth shales, murram gravel stoney earth and earth mixed with small size boulders as per SS20B for FORMATION OF EARTHERN DRAIN & EMBANKMENT CUTTING as per MORT&H | 1,730.06 | Sqm. | 170 ₹2,94,110.2 Lowest |
| 4.00 | Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up
salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc..complete as per clause 111, 112, 202, 305.4.3 of MORTH
Vth Revision etc..complete. | 20,114.25 | Sqm. | 25 ₹5,02,856.25 Lowest |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick, including premixing the materials with water at OMC in echnanical mix plant, conveyance of mixed materials by tipper to site. laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of
material, labour charges, rentals for achinery, fuel and all other incidental charges etc., complete as per clause 406 111, 112, 406 & 900 of MORTH Rev-5. | 3,017.13 | Cum | 3,354.54 ₹1,01,21,083.27 Lowest |
| 6.00 | Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per10sqm for preparatory to another bituminous construction over it, including cost of material, labou rcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5 | 20,114.25 | Sqm. | 100 ₹20,11,425 Lowest |
| 7.00 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous onstruction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as perClause 111, 112, 501, 502 & 900 of MORTH Rev-5 | 20,114.25 | Sqm. | 15 ₹3,01,713.75 Lowest |
| 8.00 | Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for
machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | 66 | Sqm. | 25.19 ₹1,662.54 Lowest |
| 9.00 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC
metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 - Grading - II | 1,009.75 | Cum | 10,832.66 ₹1,09,38,278.44 Lowest |
| 10.00 | Providing and laying Bituminous Concrete to 30mm thickusing 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm
and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen
and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections
and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Grading - 11 | 605.4 | Cum | 8,450 ₹51,15,630 Lowest |
Tender Value
₹5.9 Cr
EMD Value
₹5.9 L
Closing Date
5 Mar 2026, 3:00 pmClosed
The District Forest Officer, Dharmapuri
District Forest Office, Dharmapuri Forest Division
Improvements and Maintanance of Existing Damaged BT Road in Sitheri to Mannur Forest road in Dharmapuri Dist, Dharmapuri Forest Division , Harur Forest Range Km 0/0-11/000 during 2025-26
2026_TNFD_666811_1
Roc.No.5639/2025/D1 P03
Open Tender
Civil Works
Item Rate
90 days
District Forest Office, Dharmapuri Forest Division
Can be seen in the tender documents
5 documents required · 5 mandatory
₹0
₹5.9 L
24 Aug 2026
26 Feb 2026
6 Mar 2026
26 Feb 2026
5 Mar 2026
27 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Improvement and Maintenance of Existing Damaged BT road in Chitteri to Mannur Forest Road in Dharmapuri Forest Division of Harur Range, during 2025 - 26 Km 0/0-11/000 during 2025 2026 | - | - | - | - |
| 2 | Clearing Light Jungle road land including uprooting wildvegetation, grass, bushes, shrubs, saplling and disposal of
unserviceable materals and stacking of serviceable material tobe used or auctioned, upto a lead of 1000m including removal and disposal of top organic soild not exceeding
150mm in thickness as per technical specification clause 201. | - | Sqm. | - | - |
| 3 | Earth work excavation and depositing on bank with initial lead of 10m and initial lift of 2m in hard stiff clay, stiff black cotton hard red earth shales, murram gravel stoney earth and earth mixed with small size boulders as per SS20B for FORMATION OF EARTHERN DRAIN & EMBANKMENT CUTTING as per MORT&H | 1 | Sqm. | - | - |
| 4 | Picking the existing BT surface upto 50mm thick as directed by the Departmental officers and collecting the picked up
salvaged metal and stacking the same for reuse and depositing the debris excludung cost of materials including all labour charges for picking and all other tools and plants employed of the work and including all other incidental charges etc..complete as per clause 111, 112, 202, 305.4.3 of MORTH
Vth Revision etc..complete. | - | Sqm. | - | - |
| 5 | Providing, laying, spreading and compacting graded stone aggregates for Wet Mix Macadam 150mm thick, including premixing the materials with water at OMC in echnanical mix plant, conveyance of mixed materials by tipper to site. laying in uniform layers using pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory soil compactor to acheive the desired density including cost of
material, labour charges, rentals for achinery, fuel and all other incidental charges etc., complete as per clause 406 111, 112, 406 & 900 of MORTH Rev-5. | - | Cum | - | - |
| 6 | Providing and laying Prime Coat over WMM surface using 7Kg of Emulsion Bitumen (SS1) per10sqm for preparatory to another bituminous construction over it, including cost of material, labou rcharges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 111, 112, 501, 502 & 900 of MORTH Rev-5 | - | Sqm. | - | - |
| 7 | Providing and laying Tack Coat over WMM surface (treated with primer) using 2.50Kg of Bitumen Emulsion (RS1) per 10sqm for preparatory to another bituminous onstruction over it including cost of material, labour charges, rentals for machinery,fuel and all other incidental charges etc., complete as perClause 111, 112, 501, 502 & 900 of MORTH Rev-5 | - | Sqm. | - | - |
| 8 | Providing and laying Tack Coat over Dry Lean Cement Concrete surface using 3.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for
machinery, fuel and all other incidental charges etc., complete as perClause 503 of MORTH Rev-5 | - | Sqm. | - | - |
| 9 | Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50-13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC
metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site,spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 - Grading - II | - | Cum | - | - |
| 10 | Providing and laying Bituminous Concrete to 30mm thickusing 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm
and 0.26 cum of 2.36 and below with 50.30kgs of VG30 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen
and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections
and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 Grading - 11 | 1 | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_801034.xls
BOQ • 0.30 MB
Tender_Document.pdf
Tender Documents • 0.43 MB
Corrigendum_Sitheri_Mannur.pdf
PDF • 0.15 MB
Corrigendum_Sitheri_Mannur.pdf
PDF • 0.15 MB
Corrigendum_No6_Sitheri_to_Mannur.pdf
PDF • 0.04 MB
2026_TNFD_666811_1.pdf
PDF • 0.03 MB
Corrigendum_666811.pdf
PDF • 0.17 MB
2026_TNFD_666811_1.pdf
PDF • 0.03 MB
Corrigendum_666811.pdf
PDF • 0.05 MB
Corrigendum_666811.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].