Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Fee/PreQual/Technical/Finance GRAM BANGAWAN POST MATINGANJ FARGANA MAHDA JANPAD AZAMGARH UTTAR PRADESH | AZAMGARH | AZAMGARH | UTTAR PRADESH | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹8.6 L+₹86,478.06 (11.2%)Admitted-Fee/PreQual/Technical/Finance BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.1 L
EMD Value
₹77,144
Closing Date
16 Jun 2026, 4:00 pmClosed
CHIEF ENGINEER
VARANASI NAGAR NIGAM
WARD NO. 31 NARAYANPUR MOHALLA GILAT BAZAR MAY NAGAR COLONY PARK KA SUNDARIKARAN KA KARYA
2026_NNVAR_1147685_43
30_2026-27
Open Tender
Civil Works
Percentage
90 days
VARANASI NAGAR NIGAM
AS PER TD
3 documents required · 3 mandatory
₹910
TENDER COST, Account no- 50100642535388
₹77,144
19 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
16 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1WARD NO. 31 NARAYANPUR MOHALLA NARAYANPUR GILAT BAZAR JAY NAGAR COLONY ME PARK KA SUNDARIKARAN KA KARYA. | |||||
| 1.01 | E/W IN EXCAVATION IN ORDINARY SOIL MIX WITH MOORUM/SHINGHAL/BLACK COTTON/ KANKAR ETC. INCLUDING LIFT OF 1.5 M AND 30 M LEAD WITH ALL COMPLETE. | - | CUM | 130 | - |
| 1.02 | P.C.C. WORK IN 1:4:8 WITH CEMENT, F/SAND & 40 MM STONE BALLAST WITH ALL COMPLETE. | - | CUM | 5,550 | - |
| 1.03 | R.C.C. WORK IN 1:1.5:3 WITH CEMENT, C/SAND AND 20MM STONE GRIT WITH ALL COMPLETE. | - | CUM | 9,100 | - |
| 1.04 | MILD STEEL OR IRON WORK IN PLAIN FOR R.C.C. WORK ETC ALL COMPLETE. | - | QTL | 6,350 | - |
| 1.05 | B/W IN SUB STRUCTURE FOR SIDE WALL OR BRICK DRAIN WITH CEMENT MORTAR IN 1:4 (C:C/SAND) ETC. ALL COMPLETE. | 1 | CUM | 5,500 | ₹5,494.5 |
| 1.06 | 12 MM THICK PLASTER WITH CEMENT MORTAR IN PROPORTION OF 1:3 CEMENT AND SAND OF 1.25 F.M. OVER BRICK WORK MINIMUM THICKNESS NOT BE LESS THAN 10 MM INCLUDING SUPPLY OF ALL MATERIALS, LABOUR AND T & P ETC ALL COMPLETE. | - | SQM | 165 | - |
| 1.07 | PROVIDING AND APPLYING PLASTER PUTTY OF 2MM THICKNESS OVER PLASTERED SURFACE ETC ALL COMPLETE. | - | SQM | 193.08 | - |
| 1.08 | WALL PAINTING WALLS WITH WATER PROOF CEMENT PAINT OF APPROVED MAKE AND QUALITY WITH TWO COAT TO GIVE AN EVEN SHADE INCLUDING SUPPLY OF ALL MATERIAL LABOUR T&P ETC ALL COMPLETE. | - | SQM | 92 | - |
| 1.09 | MILD STEEL FOR TRUSS | 1 | KG | 70 | ₹69.93 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.89 MB
BOQ_2169955.xls
BOQ • 0.29 MB
30tdre4.pdf
Tender Documents • 2.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .