Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹60.5 L+₹11.8 L (24.1%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹70.7 L+₹21.9 L (45.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹86.5 L+₹37.7 L (77.3%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹89.7 L+₹40.9 L (83.9%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MOHMAMMAD ABDULLAH PUJOO L6 | M/S MOHD YASIN WANI L10 | M/s Mushtaq Ahmed Khan L11 | M/s Mohammad Ramzan Sheikh L7 | M/S MAGPIE ENTERPRISES L1 | M/S MEHRAJUDIN DAR L5 | Abdul Ahad Shah L9 | M/S AJAZ AZIZ SHAH L2 | GULAM MOHI- UD- SHAGOO L4 | M/S RAMEEZ RAJA DAR L3 | M/S WANI CONSTRUCTION COMPANY L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 150 meters and all lifts, as directed by Engineer-in-Charge All kinds of soil : Including all dewatering charges, diversions, coffer dam etc . | 45,341.6 | Cum | 121 ₹54,86,333.6 | 216 ₹97,93,785.6 | 200 ₹90,68,320 | 99 ₹44,88,818.4 | 110 ₹49,87,576 | 99 ₹44,88,818.4 | 188 ₹85,24,220.8 | 55 ₹24,93,788 Lowest | 90 ₹40,80,744 | 80 ₹36,27,328 | 187 ₹84,78,879.2 |
| 2.00 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. All kinds of soil : Including all dewatering charges, diversions, coffer dam etc . | 16,111.2 | Cum | 215 ₹34,63,908 | 450 ₹72,50,040 | 470 ₹75,72,264 | 299 ₹48,17,248.8 | 400 ₹64,44,480 | 199 ₹32,06,128.8 | 456 ₹73,46,707.2 | 70 ₹11,27,784 | 200 ₹32,22,240 | 97 ₹15,62,786.4 | 50 ₹8,05,560 Lowest |
| 3.00 | Filling empty cement bags with available excavated earth; including cost of sewing, strings, placing of the same in water and in position as per directions of Engineer-in-charge using Boat alongwith Boatman and other manual suport with all leads including cost of EC Bags including all carriages lead lifts upto site of work etc including all dewatering charges making of plate forms, diversions, coffer dams etc complete job. | 1,10,595 | No. | 28 ₹30,96,660 | 30 ₹33,17,850 | 35 ₹38,70,825 | 25 ₹27,64,875 | 6 ₹6,63,570 Lowest | 15 ₹16,58,925 | 30.3 ₹33,51,028.5 | 24 ₹26,54,280 | 15 ₹16,58,925 | 22 ₹24,33,090 | 30 ₹33,17,850 |
| 4.00 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded section.Including all dewatering charges. diversions, coffer dam etc . | 4,425 | Kg. | 110 ₹4,86,750 | 140 ₹6,19,500 | 140 ₹6,19,500 | 138 ₹6,10,650 | 150 ₹6,63,750 | 99 ₹4,38,075 Lowest | 138.2 ₹6,11,535 | 137 ₹6,06,225 | 120 ₹5,31,000 | 110 ₹4,86,750 | 140 ₹6,19,500 |
| 5.00 | Providing and laying NP3 class R.C.C. pipes S & S / collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) / rubber gasket including testing of joints etc. complete, 800 mm dia. R.C.C. pipe. Including all carriages upto sites of work incl. dewatering charges.( Complete Job). | 30 | meter | 2,300 ₹69,000 | 4,000 ₹1,20,000 | 2,540 ₹76,200 | 2,530 ₹75,900 | 6,000 ₹1,80,000 | 2,000 ₹60,000 Lowest | 2,530.1 ₹75,903 | 2,500 ₹75,000 | 2,000 ₹60,000 Lowest | 2,200 ₹66,000 | 4,000 ₹1,20,000 |
| 6.00 | Consideration Cost:-
Consideration Cost towards the Department on account of Surplus material to be excavated by the Agency of its own. (The material available after excavation by the Agency of its own is the property of the Agency and is to be taken outside the periphery of the Nallah / Water bodies and other restricted areas as per the directions of Engineer-in-charge at site). The Royalty due towards the Geology and Mining Department Shall be borne by the Agency of his own. (The minimun rate to be quoted by the contractor for the item is Rs: 44/Cum) excluding applicalble royalty charges to be paid by the contractor to Geology & Mining Department.
Note:
11. Lowest Bidder = Sum of S.No 01 to S. No 5 - S.No 06
2. Nothing shall be paid on account of dewatering , Diversion or construction of ring bund etc. The contractor shall quote his rate accordingly.
3. Errors / Omissions if any shal;l be read with SSR-2022. | 20,107 | Cum | 44 ₹-8,84,708 Lowest | 44.05 ₹-8,85,713.35 | 44 ₹-8,84,708 Lowest | 44 ₹-8,84,708 Lowest | 401 ₹-80,62,907 | 44 ₹-8,84,708 Lowest | 44 ₹-8,84,708 Lowest | 45 ₹-9,04,815 | 45 ₹-9,04,815 | 55 ₹-11,05,885 | 44.05 ₹-8,85,713.35 |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
2 Nov 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer FSC Division Narbal
Narbal
Construction of Setling / Retention Basin at entry point of Hokersar Wetland
2022_IFC_191095_1
e NIT No 32 of 2022-23 of FSC Division Narbal
Open Tender
Civil Works
Item Rate
90 days
Narbal
Please refer Tender documents.
7 documents required · 7 mandatory
₹5,000
Yes
Executive Engineer FSC Division Narbal
₹4.0 L
Yes
16 Nov 2022
3 Oct 2022
3 Nov 2022
3 Oct 2022
2 Nov 2022
3 Oct 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 150 meters and all lifts, as directed by Engineer-in-Charge All kinds of soil : Including all dewatering charges, diversions, coffer dam etc .
Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. All kinds of soil : Including all dewatering charges, diversions, coffer dam etc .
Filling empty cement bags with available excavated earth; including cost of sewing, strings, placing of the same in water and in position as per directions of Engineer-in-charge using Boat alongwith Boatman and other manual suport with all leads including cost of EC Bags including all carriages lead lifts upto site of work etc including all dewatering charges making of plate forms, diversions, coffer dams etc complete job.
Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded section.Including all dewatering charges. diversions, coffer dam etc .
Providing and laying NP3 class R.C.C. pipes S & S / collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) / rubber gasket including testing of joints etc. complete, 800 mm dia. R.C.C. pipe. Including all carriages upto sites of work incl. dewatering charges.( Complete Job).
Consideration Cost:- Consideration Cost towards the Department on account of Surplus material to be excavated by the Agency of its own. (The material available after excavation by the Agency of its own is the property of the Agency and is to be taken outside the periphery of the Nallah / Water bodies and other restricted areas as per the directions of Engineer-in-charge at site). The Royalty due towards the Geology and Mining Department Shall be borne by the Agency of his own. (The minimun rate to be quoted by the contractor for the item is Rs: 44/Cum) excluding applicalble royalty charges to be paid by the contractor to Geology & Mining Department. Note: 11. Lowest Bidder = Sum of S.No 01 to S. No 5 - S.No 06 2. Nothing shall be paid on account of dewatering , Diversion or construction of ring bund etc. The contractor shall quote his rate accordingly. 3. Errors / Omissions if any shal;l be read with SSR-2022.
M/S AJAZ AZIZ SHAH
M/S RAMEEZ RAJA DAR
GULAM MOHI- UD- SHAGOO
M/S MEHRAJUDIN DAR
MOHMAMMAD ABDULLAH PUJOO
M/s Mohammad Ramzan Sheikh
M/S WANI CONSTRUCTION COMPANY
Abdul Ahad Shah
M/S MOHD YASIN WANI
M/s Mushtaq Ahmed Khan
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.49 MB
BOQ_496680.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .