| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-AOC B 12 SANGWAN CITY ASHADPUR KYAM ALIGARH UTTAR PRADESH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹2.2 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.4 CrRejected-AOC | ₹2.4 Cr | L2 | Rejected-AOC L2 |
| 3 | L3₹2.6 CrRejected-AOC NEAR S R PETROL PUMP SAORO GATE KASGANJ | KASGANJ | UTTAR PRADESH | ₹2.6 Cr | L3 | Rejected-AOC L3 |
| 4 | L4₹3.3 CrRejected-AOC | ₹3.3 Cr | L4 | Rejected-AOC L4 |
| 5 | L5₹3.9 CrRejected-AOC | ₹3.9 Cr | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | M/s Parth and Associate L5 | M/S OBELION CONSTRUCTIONS L6 | M/S NAV DURGA CONSTRUCTION COMPANY L4 | ARUN KUMAR GUPTA L2 | M/S MANOJ TRADERS L1 | GSB DEVELOPERS PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Making C.C. Block in 1:3:6 with 20% plum of 2.00 x 2.00 x 0.90 m size i/c cost of all material, labour, T&P etc. i/c mechanical vibration for Proper completion of work. | 7,797 | CUM | 4,008 ₹3.1 Cr | 4,260 ₹3.3 Cr | 3,390 ₹2.6 Cr | 2,800 ₹2.2 Cr | 2,400 ₹1.9 Cr | 3,000 ₹2.3 Cr |
| 2.00 | Centering and shuttering in special type of C.C. work i/c all cost of Shuttering, labour, t&P etc for Proper completion of work.. | 8,468 | SQM | 528 ₹44.7 L | 575 ₹48.7 L | 425 ₹36.0 L | 99 ₹8.4 L | 250 ₹21.2 L | 200 ₹16.9 L |
| 3.00 | Filling Gaps/ Jhirrie with Boulder (40-80) mm size between C.C. Blocks i/c cost of material, Labour T&P etc comp. (Per Cum) | 712 | CUM | 2,048 ₹14.6 L | 2,170 ₹15.5 L | 1,725 ₹12.3 L | 900 ₹6.4 L | 700 ₹5.0 L | 100 ₹71,200 |
| 4.00 | Earth work in afflux bund, guide bund and tatbund above 1.5M height including removal of 20 cm. humus from bund seat and 15 cm. from borrow areas and trenching in bund seat including lead up to 30M and lift up to 1.5M and including dressing making profiles and manual compaction but excluding mechanical compaction. | 8,674 | CUM | 102 ₹8.8 L | 110 ₹9.5 L | 90 ₹7.8 L | 49 ₹4.3 L | 50 ₹4.3 L | 50 ₹4.3 L |
| 5.00 | Laying 450 mm Thick Dry Boulder Pitching on Slope Portion i/c all cost of material, labour, t&P etc for Proper completion of work.. | 212 | CUM | 2,060 ₹4.4 L | 2,170 ₹4.6 L | 1,700 ₹3.6 L | 1,360 ₹2.9 L | 800 ₹1.7 L | 2,000 ₹4.2 L |
| 6.00 | Laying Grouting Over 450 mm Thick Bouler Ptiching on Slope Portion i/c all cost of material, labour, t&P etc for Proper completion of work.. | 721 | SQM | 240 ₹1.7 L | 250 ₹1.8 L | 205 ₹1.5 L | 149 ₹1.1 L | 252 ₹1.8 L | 500 ₹3.6 L |
Updated dates
Tender Value
₹4.1 Cr
EMD Value
₹8.3 L
Closing Date
16 Mar 2026, 5:00 pmClosed
SE IWC SAHARANPUR
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
Restoration work of the launching apron on damaged CC Spur No. 2 and CC Spur No. 2A of LP Bund located on the left bank of the down stream of Hathnikund Barrage constructed on Yamuna River under Block Sadhauli Kadim Tehsil Behat in District. Saharanp
2026_UPIDC_1121954_1
06/SE/SRE/2025-26
Open Tender
Civil Works
90 days
SAHARANPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹8.3 L
OFFICE OF THE SE IWC DEHRADUN ROAD SAHARANPUR
2 Apr 2026
6 Mar 2026
17 Mar 2026
6 Mar 2026
16 Mar 2026
6 Mar 2026
10 Mar 2026
Making C.C. Block in 1:3:6 with 20% plum of 2.00 x 2.00 x 0.90 m size i/c cost of all material, labour, T&P etc. i/c mechanical vibration for Proper completion of work.
Centering and shuttering in special type of C.C. work i/c all cost of Shuttering, labour, t&P etc for Proper completion of work..
Filling Gaps/ Jhirrie with Boulder (40-80) mm size between C.C. Blocks i/c cost of material, Labour T&P etc comp. (Per Cum)
Earth work in afflux bund, guide bund and tatbund above 1.5M height including removal of 20 cm. humus from bund seat and 15 cm. from borrow areas and trenching in bund seat including lead up to 30M and lift up to 1.5M and including dressing making profiles and manual compaction but excluding mechanical compaction.
Laying 450 mm Thick Dry Boulder Pitching on Slope Portion i/c all cost of material, labour, t&P etc for Proper completion of work..
Laying Grouting Over 450 mm Thick Bouler Ptiching on Slope Portion i/c all cost of material, labour, t&P etc for Proper completion of work..
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.43 MB
BOQ_2088510.xls
BOQ • 0.23 MB
Booklate-01.pdf
Tender Documents • 2.54 MB
Download all tender documents and submit your bid