Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC | ₹3.5 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹1.7 L (0.49%)Rejected-AOC | ₹3.5 Cr+₹1.7 L (0.49%) | L2 | Rejected-AOC L2 |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
18 Sept 2024, 3:00 pmClosed
Additional Collector (Development)
DRDA, Salem
Salem District - Yercaud Block - MRL21-Loop Road to Sonapadi via kondayanur at PMGSY III 2023-2024 - Batch - I TN15-256
2024_RDTN_136225_1
TN15256
Open Tender
Civil Works - Roads
Item Rate
270 days
DRDA
As per tender Document
3 documents required · 3 mandatory
₹0
₹6.8 L
DRDA, Salem
18 Oct 2024
5 Sept 2024
18 Sept 2024
5 Sept 2024
18 Sept 2024
5 Sept 2024
9 Sept 2024
Amount
1) MRL - 21 Loop road to Sonapady (via) Kondaiyanur Km 2/0-4/9 & 6/4-7/3
Clearing and grubbing road land including uprooting wild vegetation,grass ,bushes, shrubs, saplings and trees of girth upto 300mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MORD Technical Specification Clause 201.
Scarifying the existing bituminous road surface to a depth of 150 mm and disposal of scarified material with a lift upto 3 m and lead upto 1000 m as per Technical Specification Clause 301.4.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per
Construction of embankment using tractor with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 (Gravel shoulder)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical
Construction of embankment using tractor with grader with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Cla use 301.5 (Gravel Shoulder)
Supplying, testing and installation of 100 cm wide coir geotextiles ( H2M6)) 400 gm/sqm with mesh or net size of 20x20 mm. Coir should be laid with overlaps of 100 mm transversally and 300 mm longitudinally suitably stitched and duly secured to sub-grade by round head country nail of 150 mm length or bamboo/timber pegs at an interval of 750 mm as per direction of the Engineer-in-Charge. The rate is inclusive of all Govt. taxes, duties, cess as leviable but excluding transportation charges from a reputed coir Mill to the work site loading & unloading for storage of the material. (Payment of this item will be made on the basis of finished area of coir(no separate payment to be made for overlap area
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with three wheel 80-100 kN static roller capacity to achieve the desired density, complete as per Technical
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub base/base course on a well prepared surface and compacting with vibratory roller to achieve the desired
Providing and applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MORD Technical Specification
Providing and applying Tack Coat with Bitumen emulsion (RS-1 using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared granular surface treated with prime & cleaned with Hydraulic broom as per MORD Technical Specification Clause 502
Mix Seal Surfacing with Plastic waste Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause
Provision of 15 nos rumble strips with covered with premix bituminous carpet, 15-20mm high at centre, 250mm wide placed at 1m centre to centre approved locations to control speed, marked with w
Painting lines, dashes, arrows, etc. on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous/concrete surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control as per drawing
1.50m Span RCC Slab Culvert @ Ch 2830
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
Removal of RCC Slabs Dismantling of Bricks/ Stone Masonry in Cement Mortar walls under 3m height
Removing all types of Hume pipe and stacking within lead of 1000m in cluding earth work and dismantling of masonry works as per Technical specification Clause
1.50m Span RCC Slab Culvert @ Ch 3925
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
Removal of RCC Slabs Dismantling of Bricks/ Stone Masonry in Cement Mortar walls under 3m height
Removing all types of Hume pipe and stacking within lead of 1000m in cluding earth work and dismantling of masonry works as per Technical specification Clause
1.50m Span RCC Slab Culvert @ Ch 4535
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
Removal of RCC Slabs Dismantling of Bricks/ Stone Masonry in Cement Mortar walls under 3m height
Removing all types of Hume pipe and stacking within lead of 1000m in cluding earth work and dismantling of masonry works as per Technical specification Clause
1.50m Span RCC Slab Culvert @ Ch 4760
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M15 (1:2, 5:5)
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 (1:2:4) Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 (1:2:4) M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.50m Span RCC Slab Culvert @ Ch 6490
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.50m Span RCC Slab Culvert @ Ch 6635
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
1.50m Span RCC Slab Culvert @ Ch 6875
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
3.00m Span RCC Slab Culvert @ Ch 6730
Earth work Excavation for Foundation of structres upto 3m depth as per drawing and techincal specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material.
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Below Sill
Providing and laying concrete for plain /Rainforced Concrete in open foundations complte as per drawings and MORD technical specification clauses 802,803,1202, & 1203 M20 Above Sill
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and MORD technical specification Clauses 1002, 1010 and 1202
Providing and laying concrete for Reinforced concrete in super structure complete as per drawings and MORD technical specification Clauses 800, 1205.4 & 1205.5 (RCC M25)
Providing weepholes in abutment, wing wall, return wall with 100mm dia AC pipe extending through the full widht of strucures with slope of 1(V) : 2(H) towards drawing face complete as per drawing and techinical specification
Providing and fixing 20mm thick compressible fibre board in expansion joint complete as per dreeing and technical specifications
Providing and fixing tar paper for bearing
Backfilling behaind abutment, wing wall and return wall complete as per drawing & MORD
Protection wall Km 2/0-3/0
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Stone Masonry work in Cement Mortar in Foundation of Head walls complete as per drawing and MORD technical specification Clause 1109 in Cement Mortar 1: 5
Dry stone masonry for Retainingwall -10cum including cost and conveyanceof all materials and all labour charges etc complete
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
Protection wall Km 6/4-7/0
Earth work excavation for foundation of structures up to 3m depth as per drawing and technical specification Clause 1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved
Providing and laying concrete for plain/ Reinforeced concrete in open foundations complete as per drawings and MORD technical specification Cuauses 802,803,1202 & 1203 M20 M15
Stone Masonry work in Cement Mortar in Foundation of Head walls complete as per drawing and MORD technical specification Clause 1109 in Cement Mortar 1: 5
Dry stone masonry for Retainingwall -10cum including cost and conveyanceof all materials and all labour charges etc complete
Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
CC Pavement @ Km 4/0-4/9
Construction of Cell Fill Compacted Concrete Pavement (M30) over prepared sub base with coarse and fine aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mm minimum cement content of 375 kg per cum, mixing in concrete mixer at optimum moisture content, transporting to site, laying with wheel barrows or steel pans or with mechanical paver, compacting with plate vibrator, to achieve the designed flexural strength, finishing and curing as per Technical Specification.
Providing and fixing of Logo Board as per standard drawings
Reinforced cement concrete M15 grade Kilometre stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical Specification Clause
Reinforced cement concrete M15 grade Hecta metre stone of standard design as per IRC:8 fixing in position including painting and printing etc., as per drawing and Technical Specification Clause
Retro - Reflectorised Traffic sign
60cm Equilateral triangle cautionary sign board
Chevron signs 90 cm Octogon
Citizen information board
Maintenance board
Name board
Routine Maintenance after completion of work the road sufrace and shoulder to be maintained in proper condition to make them free from excessive edge drop offs, roughness, scouring and pot holes and cleaning of surface drain including culverts for frre flow of water. Relettering name boards and K.M & H.M stone and other maintenance operation required to keep the road traffic worthly at all the time for the maintenance period for the following years. As per General condition of contract para 32.2.2
For 1st Year
For 2nd Year
For 3rd Year
For 4th Year
For 5th Year
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
R Subramanian
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .