Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.6 LAdmitted-Fee/PreQual/Technical/Finance 1ST FLOOR SAI COMPLEX BESIDES ADITYA VIP ENCLAVE NEAR GANESH MANDAP CHHAK JHARPADA BHUBANEWAR 751006 | KHORDHA | ODISHA | 751006 | -23.99% | ₹37.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹44.3 L+₹6.7 L (17.7%)Admitted-Fee/PreQual/Technical/Finance LAXMI SAGAR PLOT NO EB 06 P S SAHID NAGAR BHUBANESWAR KHORDHA ODISHA 751006 | KHORDHA | ODISHA | 751006 | -10.50% | ₹44.3 L+₹6.7 L (17.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹45.8 L+₹8.2 L (21.8%)Admitted-Fee/PreQual/Technical/Finance | -7.45% | ₹45.8 L+₹8.2 L (21.8%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹46.9 L+₹9.3 L (24.7%)Admitted-Fee/PreQual/Technical/Finance KHATA NO 903 PLOT NO 423 TALASAHI KHORDHA | KHORDHA | ODISHA | 751001 | -5.25% | ₹46.9 L+₹9.3 L (24.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹49.4 L+₹11.8 L (31.4%)Admitted-Fee/PreQual/Technical/Finance PLOT NO 208 KRISHNAPURI COLONY MALIPADA BHUBANESWAR 751029 | KHORDHA | ODISHA | 751029 | -0.09% | ₹49.4 L+₹11.8 L (31.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹49.5 L
EMD Value
₹49,506
Closing Date
18 Sept 2026, 1:30 pmClosed
S.E.BBSR RandB Divn No.3 Bhubaneswar
Infront of Nirman Soudha Unit 5 Bhubaneswar Dist Khrodha Odisha
Construction of 500KVA Transformer to Power Supply to 100 seated hostel building in SIRD Campus Unit-VIII Bhubaneswar for the year 2026-27
2026_EICCL_140230_2
eTCN-19-2026
Open Tender
Electrical Works
Percentage
60 days
Bhubaneswar
Pl refer DTCN2
2 documents required · 2 mandatory
₹10,000
₹49,506
Yes
19 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
18 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 500 KVA , 11/ 0.4 KV (Cu) Transformer with Tap Changer BIS Energy Loss level II, Ammendment-4 | 1 | EA | 14,78,686.9 | ₹14,78,686.9 |
| 2 | LT Distribution Box with MCCB, Aluminium Busbar for 4 Bay with kit kat fuse for 500 KVA S/S | 1 | EA | 1,23,440.41 | ₹1,23,440.41 |
| 3 | 55 SQ.MM. AAAC XLPE Covered Conductor | 50 | M | 120.38 | ₹6,019 |
| 4 | 1 Cx 400 mm2 LT XLPE Cable(Un-Armoured) | 180 | M | 438.22 | ₹78,879.6 |
| 5 | LT Cable Supporting Channel(GI) 100 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg./Mtr., 2 No's.) (Each 2x2x9.56= 28.56 Kg) | 38 | KG | 128.54 | ₹4,884.52 |
| 6 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./mtr., each Angle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) | 36 | KG | 128.54 | ₹4,627.44 |
| 7 | Civil ServicesRCC ratio 1:3:6 (M-10-Grade) for DSS area (3.5X3.5X0.1)=1.225 Cu. Mtr | 1 | M3 | 5,299.95 | ₹5,299.95 |
| 8 | Fixing of stay set with 0.5 Cum cement concrete foundation 1:3:6 (M-10-Grade) size (900mmX600mmX900mm) using 40mm BHG metal with all labour and material expect stay set, stay insulator | 2 | EA | 2,324.55 | ₹4,649.1 |
| 9 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI)around pipe . | 7 | EA | 3,822.58 | ₹26,758.06 |
| 10 | LTDB Plinth | 1 | EA | 6,060 | ₹6,060 |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
DTCN192.pdf
Tender Documents • 0.63 MB
BOQ_608222.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .